New construction ยท Pinellas County
New construction roofing in Pinellas County, FL
Only 5.8% of Pinellas County's homes were built in 2010 or later, on 273.8 square miles of land that held 959,107 people in 2020. New construction roofing in Pinellas County can mean a replacement house: Helene destroyed at least 419 homes in Pinellas and Hillsborough combined, and every rebuild gets a roof built to the current code.
Updated October 2026

New roofs in Pinellas, in short
A new roof here is built to the 2023 Florida Building Code, Eighth Edition, unless the permit application goes in on or after December 31, 2026, when the Ninth Edition applies. Sheathing and dry-in get their own inspection before the roofing inspection. A general contractor must subcontract the roofing unless it holds a roofing certificate or registration, with one shingle carve-out for its own new buildings.
Code
Rebuilding after Helene: the code edition and the town's review
Permits submitted now fall under the 2023 Eighth Edition, in effect since December 31, 2023; applications filed on or after December 31, 2026 must meet the Ninth Edition. On a lot where a storm destroyed or badly damaged the house, the town's flood rules come first: Redington Shores asks for a Hurricane Helene permit application and a Substantial Improvement packet, and St. Pete Beach publishes a 2026 50% Rule packet.
The county's population has held steady. The Census Bureau's 2020-2024 estimate of 963,481 residents sits close to the 959,107 counted in 2020.
Inspections
Framing, sheathing, dry-in: the inspection order
The code lists the inspections in order (FBC-B 110.3): framing once trusses, bracing and connectors are in place; sheathing, which can be combined with a dry-in inspection; exterior wall coverings and soffit; roofing, which looks at dry-in, insulation, coverings and flashing; then final.
Dry-in itself has three code paths for shingle and metal roofs: a self-adhering membrane over the whole deck, taped deck seams under a regular underlayment, or two layers of felt-type underlayment fastened with cap nails 12 inches apart in the field and 6 at the laps (R905.1.1.1). Sheathing goes down with RSRS-03 ring-shank nails, or RSRS-01 or RSRS-04 on thinner panels (R803.2.3.1).
Wind
Nailing, drip edge and soffits near the Gulf
Wind sets the nail spacing. The sheathing table tightens edge and field nailing from 6 inches to 4, then 3, as design speed and exposure rise; for lumber with a specific gravity of 0.42, 4-inch spacing starts at 130 mph in Exposure D and 140 mph in Exposure C, within 4 feet of edges, ridges and hips (Table R803.2.3.1). Treasure Island lists 147 to 150 mph with Exposure D.
Drip edge on a shingle roof must be fastened every 4 inches, not 12, where the design wind speed (Vasd) is 110 mph or more or the mean roof height tops 33 feet (R905.2.8.5). Soffits have had to resist the same wind loads as walls since the 2007 code, and FEMA's advice after Hurricane Michael was to fasten soffit panels at both the wall and the fascia.
Builders and owners
Who may install it, and the 1-year builder law
A general, building or residential contractor must subcontract roofing unless it holds a roofing certificate or registration; the exception lets it install asphalt, fiberglass or wood shingles on a new building of its own construction (Fla. Stat. 489.113(3)). An owner may act as an owner-builder on a one- or two-family home for the owner's own use, under personal supervision (489.103(7)).
Since July 1, 2025, Fla. Stat. 553.837 has required a builder to stand behind a new home for 1 year against defects in equipment, material or workmanship that cause a material violation of the Florida Building Code. It excludes normal wear and tear, settling, owner-caused defects and natural disasters.
Bids
Request a bid
Questions
New construction roofing in Pinellas County: questions
Which code edition applies to a new Pinellas home permitted after 2026?
The Ninth Edition, for any application submitted on or after December 31, 2026; from that date, all permit applications and plans must comply with it. Anything submitted before then stays under the 2023 Eighth Edition. The office that takes the application depends on the lot: Pinellas County Building Services for unincorporated land such as Palm Harbor and East Lake and for six contracting towns, or the city's own department in places such as Clearwater, Largo and St. Petersburg.
Source: Miami-Dade County RER notice, read Oct 5, 2026
Does a new Pinellas home need gutters?
Only in one situation under the code: gutters with downspouts are required where the eaves project less than 6 inches, except at gable-end rakes or on a roof above another roof (FBC-R R318.5). Any downspout, required or optional, has to empty at least 1 foot out from the wall. With 52.48 inches of rain in a normal year at St. Petersburg, most of it from June through September, the design stage is the easy time to decide, while downspout locations and site drainage are still on paper.
Source: 2023 Florida Building Code, Residential, 8th ed., R318.5 (UpCodes viewer, unofficial transcription); FBC-Building 1503.7, read Oct 5, 2026
Is a rebuilt house on a Pinellas barrier island held to tougher wind rules?
The rules scale with the design wind speed and exposure for the lot, and the beach towns publish high ones: Treasure Island lists 147 to 150 mph with Exposure D. The code's wind-borne debris region covers anywhere designed for 140 mph or more, and land within a mile of the coast at 130 mph where Exposure D lies upwind. Higher figures tighten the roof sheathing nailing schedule and, at 110 mph and up, the drip-edge fastening. The ASCE 7-22 hazard tool gives the figure for your address.
Source: FBCR Ch. 2, read Oct 5, 2026
Who answers for defects in a new Pinellas home's roof in its first year?
Under Fla. Stat. 553.837, in force since July 1, 2025, the builder must cover a newly built home for 1 year against defects in equipment, material or workmanship, from its own crews, subcontractors or suppliers, that result in a material violation of the Florida Building Code. The year runs from the first title transfer or first occupancy, whichever comes first. Normal wear, settling, owner-caused defects and natural disasters are excluded, which matters in a county that saw FEMA declarations for Debby, Helene and Milton in 2024.
Source: Florida Statutes, section 553.837 (2026), read Oct 5, 2026
Pinellas County
More in Pinellas County
Sources for this page(35)
- 1.Share of homes built 2010 or later: 5.8%. U.S. Census Bureau, ACS 2024 5-year (2020-2024), table B25034, via Census Reporter API. Read Oct 5, 2026.
- 2.Land area: 273.8 sq mi. U.S. Census Bureau TIGERweb Census 2020 county geography (AREALAND). Read Oct 5, 2026.
- 3.People (2020 Census): 959,107. U.S. Census Bureau, 2020 Census (POP100) via TIGERweb tigerWMS_Census2020 layer 82. Read Oct 5, 2026.
- 4.Population estimate (ACS 5-year): 963,481. U.S. Census Bureau, ACS 2024 5-year (2020-2024), table B01003, via Census Reporter API. Read Oct 5, 2026.
- 5.Hurricane Helene (2024). NOAA National Hurricane Center, Tropical Cyclone Report: Hurricane Helene. Read Oct 5, 2026.
- 6.City of St. Pete Beach; Town of Redington Shores; City of Largo (official). Read Oct 5, 2026.
- 7.Town of Indian Shores; City of Treasure Island (official). Read Oct 5, 2026.
- 8.NOAA NCEI U.S. Climate Normals 1991-2020, stations USC00087886 ST PETERSBURG and USW00012873 ST PETERSBURG INTL AP. Read Oct 5, 2026.
- 9.Hurricane Debby (2024). NOAA National Hurricane Center, Tropical Cyclone Report: Hurricane Debby. Read Oct 5, 2026.
- 10.Hurricane Milton (2024). NOAA National Hurricane Center, Tropical Cyclone Report: Hurricane Milton. Read Oct 5, 2026.
- 11.Permit office: Pinellas County Building and Development Review Services - Building Services (unincorporated Pinellas plus Belleair Beach, Belleair Shore, Indian Rocks Beach, Kenneth City, Oldsmar and Safety Harbor). Pinellas County Building and Development Review Services - Building Services (unincorporated Pinellas plus Belleair Beach, Belleair Shore, Indian Rocks Beach, Kenneth City, Oldsmar and Safety Harbor). Read Oct 5, 2026.
- 12.FRSA, "New 2023 FBC Eighth Edition is Now in Effect", 2024-02-13. Read Oct 5, 2026.
- 13.Miami-Dade County RER notice. Read Oct 5, 2026.
- 14.2023 Florida Building Code, Building, 8th ed., Chapter 1 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026. FBC text read from UpCodes (unofficial transcription): check floridabuilding.org or the ICC viewer before quoting (spec 8.7). Source URL inherited from C-3 (the research cites it "as C-3").
- 15.2023 Florida Building Code, Residential, 8th ed., Chapter 9 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026. FBC text read from UpCodes (unofficial transcription): check floridabuilding.org or the ICC viewer before quoting (spec 8.7). Source URL inherited from COM-29 (the research cites it "as COM-29").
- 16.2023 Florida Building Code, Residential, 8th ed., Chapter 8 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026. FBC text read from UpCodes (unofficial transcription): check floridabuilding.org or the ICC viewer before quoting (spec 8.7).
- 17.FBCR Ch. 8. Read Oct 5, 2026.
- 18.FEMA. Read Oct 5, 2026.
- 19.Florida Statutes, section 489.113 (2026). Read Oct 5, 2026.
- 20.Florida Statutes, section 489.103 (2026). Read Oct 5, 2026.
- 21.Florida Statutes, section 553.837 (2026). Read Oct 5, 2026.
- 22.2023 Florida Building Code, Residential, 8th ed., R318.5 (UpCodes viewer, unofficial transcription); FBC-Building 1503.7. Read Oct 5, 2026. FBC text read from UpCodes (unofficial transcription): check floridabuilding.org or the ICC viewer before quoting (spec 8.7).
- 23.FBCR Ch. 2. Read Oct 5, 2026.
- 24.Senate SB 808 staff analysis pp. 3-4, Senate SB 808 staff analysis pp. 3-4. Read Oct 5, 2026.
- 25.FBCR Ch. 9, FBCR Ch. 9. Read Oct 4, 2026.
- 26.Florida Statutes, section 718.112 (2026), Florida Statutes, section 718.112 (2026). Read Oct 5, 2026.
- 27.FBC-Building 2023 Chapter 2 definitions, FBC-Building 2023 Chapter 2 definitions. Read Oct 5, 2026. unofficial transcription; verify on floridabuilding.org
- 28.OIR form, OIR form. Read Oct 4, 2026.
- 29.Florida Statutes, section 553.842 (2026), Florida Statutes, section 553.842 (2026). Read Oct 5, 2026.
- 30.FBC-B 2023 Ch. 1, FBC-B 2023 Ch. 1. Read Oct 5, 2026.
- 31.FEMA FL-RA2, FEMA FL-RA2. Read Oct 5, 2026.
- 32.ICC Building Safety Journal, Karl Fippinger, 2024-02-07, ICC Building Safety Journal, Karl Fippinger, 2024-02-07. Read Oct 5, 2026.
- 33.Florida Statutes, section 627.7011 (2026), Florida Statutes, section 627.7011 (2026). Read Oct 4, 2026.
- 34.NOAA NHC, NOAA NHC. Read Oct 5, 2026.
- 35.Wikipedia, "Pinellas County, Florida" (secondary), Wikipedia, "Pinellas County, Florida" (secondary). Read Oct 5, 2026.
South Fork Roofing
New construction roofing in Pinellas County
Answer a few questions about the job, or call.
