New construction · Pinellas Park
New construction roofing in Pinellas Park, FL
Only 8.1 percent of Pinellas Park homes were built in 2010 or later, so new roofs here are the exception. A roof on a new home must follow the Florida Building Code edition in force when the permit application is filed, and that edition changes on December 31, 2026.
Updated October 2026

Our workCode and permits
Which code edition and permit office apply
The median Pinellas Park home was built in 1978, and the city is the fourth-largest in Pinellas County. New roofs are therefore mostly infill, replacement builds and additions on older lots, filed with the city's own permit office.
The Eighth Edition of the code has governed new permits since the last days of 2023. For a Pinellas Park project, filing your application before the end of 2026 keeps your plans under that edition. A filing dated December 31, 2026 or later moves to the Ninth.
Pinellas County permitting is split across many offices, and Pinellas Park issues its own. You may also hire a private provider for plan review or inspections, but only with the fee owner's explicit written authorization.
Roof assembly
Sheathing, underlayment and product numbers on a Pinellas Park permit
Roof sheathing must be fastened with ring shank nails, 2 1/2 inches by 0.131 inch, in the standard case. Inspectors check the nail pattern before the roof covering goes on.
Your plans for a shingle or metal roof will pick one of three dry-in methods. One is self-adhering membrane over the full deck. Another is tape over each deck joint plus underlayment on top. The third is two layers of felt-type underlayment nailed 12 inches apart in the field and 6 inches at laps.
Roofing is a mandatory statewide product-approval category, so every product on your permit needs a Florida approval number. Pinellas Park is not in the High-Velocity Hurricane Zone, which covers only Broward and Miami-Dade, so a Miami-Dade NOA is not the required paper here.
Metal drip edge sits over the underlayment along eaves and gables. On a low, flat lot like this one, plan the gutters early: where eaves project under 6 inches the code calls for gutters, and each downspout must empty 1 foot clear of the sidewall.
Build sequence
Scheduling the roof around the inspections
Your crew has to pass sheathing before the roofing inspection. The code's sequence is foundation, framing, sheathing, exterior wall coverings, roofing, final, and the roofing step covers dry-in, insulation, coverings and flashing.
Your permit goes stale if no work begins within 6 months, or if the job sits idle for 6 months. Record your Notice of Commencement and post it on site before the first inspector visits. Put both dates on the calendar when the City of Pinellas Park issues the permit.
The city has a history of flooding from its low elevation and flat topography, which drainage canals have greatly reduced. Downspout discharge is worth settling at design time, not at the final.
Questions
New construction roofing in Pinellas Park: questions
Who can install the roof on a new home in Pinellas Park?
On a new home you build yourself, a general or residential contractor can put on asphalt or fiberglass shingles without a subcontractor. Any other roof type, such as tile, metal or membrane, must go to a contractor holding a roofing license. Confirm the license with the state before signing. The roofing permit goes through the City of Pinellas Park's permits office, and the builder must show it holds the right category.
Source: City of Pinellas Park - Permits, Inspections and BTRs, read Oct 5, 2026
What is the 25% roof rule in Florida?
If more than 25 percent of a roof section is repaired, replaced or recovered in any 12-month period, the whole roof section must be brought up to current code. A roof that was itself built, repaired or replaced under the 2007 Florida Building Code or later is excused, and only the repaired part must meet current code. The median Pinellas Park home dates from 1978, but that describes the houses and says nothing about any one roof, so ask when your roof last had permitted work. The exception to the 25 percent rule applies only if that roof was built, repaired or replaced in compliance with the 2007 Florida Building Code or later, and that code took effect March 1, 2009.
Source: U.S. Census Bureau, ACS 2024 5-year (2020-2024), table B25035, via Census Reporter API, read Oct 5, 2026
Does a new home in Pinellas Park come with a builder warranty?
Florida Statute 553.837 has required builders, since July 1, 2025, to warrant a newly built home for 1 year against defects in equipment, material or workmanship that lead to a material Florida Building Code violation. The statute leaves out settling, damage the owner caused and natural disasters. Read your contract and ask the builder in writing what date starts the 1-year period for your Pinellas Park home.
Source: Florida Statutes, section 553.837 (2026), read Oct 5, 2026
Which code edition will my new roof permit fall under?
The Ninth Edition becomes effective December 31, 2026, and all applications and plans submitted on or after that date must comply with it. Pinellas Park permit applications filed before that date stay under the Eighth Edition, which took effect December 31, 2023. Confirm your filing date with the city's permits office.
Source: City of Pinellas Park - Permits, Inspections and BTRs, read Oct 5, 2026
Sources for this page(32)
- 1.Median year homes were built: 1978. U.S. Census Bureau, ACS 2024 5-year (2020-2024), table B25035, via Census Reporter API. Read Oct 5, 2026.
- 2.Wikipedia, "Pinellas Park, Florida" (secondary source). Read Oct 5, 2026.
- 3.Permit office: City of Pinellas Park - Permits, Inspections and BTRs. City of Pinellas Park - Permits, Inspections and BTRs. Read Oct 10, 2026.
- 4.Hurricane Hermine (2016). NOAA National Hurricane Center, Tropical Cyclone Report: Hurricane Hermine. Read Oct 5, 2026.
- 5.City of St. Pete Beach; Town of Redington Shores; City of Largo (official). Read Oct 5, 2026.
- 6.Pinellas County, "Building Departments in Pinellas County" (official). Read Oct 5, 2026.
- 7.Share of homes built 2010 or later: 8.1%. U.S. Census Bureau, ACS 2024 5-year (2020-2024), table B25034, via Census Reporter API. Read Oct 5, 2026.
- 8.U.S. Census Bureau ACS 2020-2024 5-year, tables B25035 and B25034. Read Oct 5, 2026.
- 9.FRSA, "New 2023 FBC Eighth Edition is Now in Effect", 2024-02-13. Read Oct 5, 2026.
- 10.Miami-Dade County RER notice. Read Oct 5, 2026.
- 11.Florida Statutes, section 553.791 (2026). Read Oct 5, 2026.
- 12.2023 Florida Building Code, Residential, 8th ed., Chapter 8 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
- 13.2023 Florida Building Code, Residential, 8th ed., Chapter 9 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
- 14.Florida Statutes, section 553.842 (2026). Read Oct 5, 2026.
- 15.FBC-Building 2023 Chapter 2 definitions. Read Oct 5, 2026.
- 16.2023 Florida Building Code, Residential, 8th ed., Chapter 3 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
- 17.2023 Florida Building Code, Building, 8th ed., Chapter 1 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
- 18.Florida Statutes, section 489.113 (2026). Read Oct 5, 2026.
- 19.2023 Florida Building Code, Building, 8th ed., Chapter 15 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
- 20.Florida Statutes, section 553.837 (2026). Read Oct 5, 2026.
- 21.U.S. Census Bureau, ACS 2024 5-year (2020-2024), table B25035, via Census Reporter API, U.S. Census Bureau (via Census Reporter). Read Oct 5, 2026.
- 22.City of Pinellas Park - Permits, Inspections and BTRs, City of Pinellas Park. Read Oct 5, 2026.
- 23.NOAA National Hurricane Center, Tropical Cyclone Report: Hurricane Hermine, NOAA National Hurricane Center. Read Oct 5, 2026.
- 24.Florida Statutes, section 713.135 (2026), Florida Legislature. Read Oct 5, 2026.
- 25.U.S. Census Bureau, ACS 2024 5-year (2020-2024), table B25024, via Census Reporter API, U.S. Census Bureau (via Census Reporter). Read Oct 5, 2026.
- 26.Florida Statutes, section 627.7011 (2026), Florida Legislature. Read Oct 4, 2026.
- 27.NOAA NCEI U.S. Climate Normals 1991-2020, stations USC00087886 ST PETERSBURG and USW00012873 ST PETERSBURG INTL AP, NOAA National Centers for Environmental Information. Read Oct 5, 2026.
- 28.NOAA Atlas 14 Volume 9 version 2, partial-duration 24-hour depth estimates at the Pinellas Park 2020 Census internal point (27.8589, -82.7082), NOAA Hydrometeorological Design Studies Center. Read Oct 5, 2026.
- 29.NOAA National Hurricane Center, Tropical Cyclone Report: Hurricane Irma, NOAA National Hurricane Center. Read Oct 5, 2026.
- 30.NOAA National Hurricane Center, Tropical Cyclone Report: Hurricane Eta, NOAA National Hurricane Center. Read Oct 5, 2026.
- 31.City of St. Petersburg; City of Tarpon Springs (official); Wikipedia (St. Pete Beach), City of St. Petersburg. Read Oct 5, 2026.
- 32.NOAA Atlas 14 Volume 9 version 2, partial-duration intensity estimates at the Pinellas Park 2020 Census internal point (27.8589, -82.7082), NOAA Hydrometeorological Design Studies Center. Read Oct 5, 2026.
South Fork Roofing
New construction roofing in Pinellas Park
Answer a few questions about the job, or call.
