Maitland grew from Fort Maitland in 1838 on the west shore of Lake Maitland. The town's homes are far newer than that: the median home was built in 1996. Only 44.4 percent of occupied homes are owner-occupied, so many roof decisions here belong to landlords and property managers.
Updated October 2026

Housing age
What is the typical age of Maitland homes and the roofs on them
The median Maitland home was built in 1996, two years later than the countywide median of 1994. Another 36.6 percent of housing units predate 1980. That mix means some buildings here have carried more than one roof, and some may be on a third.
A newer slice exists too. Homes built in 2010 or later make up 29.7 percent of Maitland housing, against 19.3 percent across Orange County. Those roofs went on under the later editions of the Florida Building Code, which can matter for the repair rule explained below.
Single-family detached homes are 34.4 percent of Maitland housing units, compared with 54.1 percent countywide. That is about 20 points lower. Many roofs here sit on townhomes, condos and apartments, where an association or owner decides on the roof, not a household.
Permits
Who issues Maitland roof permits?
Roof permits inside the city go through the City of Maitland Community Development Department. Orange County's Division of Building Safety handles permits through its online Fast Track portal, but that is the county office, not the city's. Confirm with Maitland's department which one covers your address before you sign anything.
A permit does not last forever. Under the Florida Building Code, it becomes invalid if work does not start within 6 months of issue. A permit also lapses when the work is suspended or abandoned for 6 months. Active progress is shown by an inspection that was approved within 180 days.
Florida also wants a Notice of Commencement recorded and posted at the job site ahead of your first inspection. According to the permit card, skipping the permit can leave you paying twice for the improvements. A Maitland owner can ask the roofer for the recorded paper before any crew starts tearing off shingles.
Building permits
City of Maitland Community Development Department (permitting)
Official building pageOffice names and links only. Fees, forms and timing change; check the official page.
Florida rules
The 25 percent rule and roofs 15 years or older
Florida's 25 percent rule limits repairs. If more than 25 percent of a roof or roof section is repaired, replaced or recovered in any 12-month period, the whole roof section must be brought to current code. The exception applies only to a roof that was itself built, repaired or replaced under the 2007 Florida Building Code or a later edition.
That exception matters to Maitland's 29.7 percent of homes built since 2010. A roof from that era may qualify, but confirm the roof's own history with Community Development.
Insurers have a separate rule at 15 years. When a roof is that old, you are entitled to have an authorized inspector examine it at your expense, and the insurer must allow it. Age alone cannot be the reason for a refusal or non-renewal if the inspector finds 5 or more years of useful life remaining. Your insurance agent can explain how that applies to your own policy.
Code editions are about to change. The Eighth Edition started on December 31, 2023, and the Ninth Edition starts December 31, 2026. A Maitland permit application filed on or after that second date has to follow the new book.
- Maitland grew from Fort Maitland (1838) on the west shore of Lake Maitland and calls itself one of the oldest incorporated municipalities in Central Florida.
- Maitland's Lakes Management Division maintains 21 lakes, canals and waterways; shoreline alterations on private property need a city permit.
- Water is 17.2% of the place's total area.
Local weather
Lakes, rain and storms around Maitland
Water is 17.2 percent of Maitland's total area, compared with 10.0 percent countywide. The city's Lakes Management Division maintains 21 lakes, canals and waterways, and shoreline alterations on private property need a city permit. If a roof job touches a seawall or shoreline, ask the city before work starts.
Rain here arrives hard. A 1-hour rain in a 10-year storm falls at 2.9 inches an hour, and the 100-year 24-hour total is 10.2 inches. Orlando International averages 51.45 inches of rain a year, with 45 percent of it in June through August.
In 2017, Irma's strongest gusts reached 69 knots at Orlando International and 68 knots at Orlando Executive. Matthew in 2016 left 3 county homes with major damage and 64 with minor damage, mainly from falling branches and trees. After Hurricane Ian in 2022, one person died falling from a ladder while clearing debris from a roof, so stay off the roof.
Services
Roofing services in Maitland
- Roof replacementTear-off, deck, code items and the two inspections.Re-roofs in Maitland
- Roof repairLeaks, lifted shingles, cracked tile and flashing.Repairs in Maitland
- Roof inspectionsRoof age, condition and what an insurer asks about.Inspections in Maitland
- Commercial roofingLow-slope systems, drainage and the code for buildings.Commercial roofs in Maitland
- New construction roofingDry-in, the sheathing inspection and the code edition.New construction in Maitland
- GuttersSizing for Florida rain, downspouts and fascia.Gutters in Maitland
Questions
Maitland roofing questions
What is the 25 percent roof rule in Florida?
If more than 25 percent of a roof or roof section is repaired, replaced or recovered in any 12-month period, the entire section must meet current code. Under the exception, a roof qualifies when it was built, repaired or replaced under the 2007 Florida Building Code or later. In Maitland, 29.7 percent of homes were built in 2010 or later, so some roofs may qualify. Confirm yours with the City of Maitland Community Development Department.
Source: U.S. Census Bureau, American Community Survey 2020-2024 5-year estimates (acs2024_5yr), via Census Reporter API, table B25034, read Oct 5, 2026
Who pulls the roof permit in Maitland?
In Maitland, the City of Maitland Community Development Department handles roof permits. Orange County's Division of Building Safety runs its own Fast Track online portal for county permits. Confirm with the city which applies to your address. Once issued, a permit becomes invalid if work does not start within 6 months.
Source: City of Maitland Community Development Department (permitting), read Oct 5, 2026
Can my insurer make me replace a roof that is 15 years old?
Once a roof reaches 15 years or older, the insurer has to permit an authorized inspector to check it, paid for by you. If the inspection shows 5 or more years of useful life left, the insurer may not refuse or non-renew on the basis of age alone. The median Maitland home was built in 1996, so roof age comes up often here. Ask your agent what your own policy says.
Source: U.S. Census Bureau, American Community Survey 2020-2024 5-year estimates (acs2024_5yr), via Census Reporter API, table B25035, read Oct 5, 2026
Do I need a city permit to work near a Maitland lake shoreline?
Shoreline alterations on private property need a city permit, and Maitland's Lakes Management Division maintains 21 lakes, canals and waterways. Water is 17.2 percent of the city's area. A roof job that involves a dock, seawall or shoreline should be raised with the city first.
Source: City of Maitland, Lakes Management, read Oct 5, 2026
How hard does it rain on Maitland roofs?
A 1-hour rain in a 10-year storm falls at 2.9 inches an hour here. The 100-year 24-hour rainfall depth is 10.2 inches. Orlando International averages 51.45 inches a year, and 45 percent falls from June through August, so summer is when a weak roof shows itself.
Source: NOAA Atlas 14 Volume 9 version 2, partial-duration intensity estimates at the Maitland 2020 Census internal point (28.6301, -81.3732), read Oct 5, 2026
Orange County
More in Orange County
Sources for this page(33)
- 1.Median year homes were built: 1996. U.S. Census Bureau, American Community Survey 2020-2024 5-year estimates (acs2024_5yr), via Census Reporter API. Read Oct 5, 2026.
- 2.U.S. Census Bureau, American Community Survey 2020-2024 5-year estimates (acs2024_5yr), via Census Reporter API, table B25035. Read Oct 5, 2026.
- 3.Share of homes built before 1980: 36.6%. U.S. Census Bureau, American Community Survey 2020-2024 5-year estimates (acs2024_5yr), via Census Reporter API. Read Oct 5, 2026.
- 4.U.S. Census Bureau, American Community Survey 2020-2024 5-year estimates (acs2024_5yr), via Census Reporter API, tables B25034/B25035. Read Oct 5, 2026.
- 5.Share of homes built 2010 or later: 29.7%. U.S. Census Bureau, American Community Survey 2020-2024 5-year estimates (acs2024_5yr), via Census Reporter API. Read Oct 5, 2026.
- 6.U.S. Census Bureau, American Community Survey 2020-2024 5-year estimates (acs2024_5yr), via Census Reporter API, table B25034. Read Oct 5, 2026.
- 7.Single-family detached share of housing units: 34.4%. U.S. Census Bureau, American Community Survey 2020-2024 5-year estimates (acs2024_5yr), via Census Reporter API. Read Oct 5, 2026.
- 8.U.S. Census Bureau, American Community Survey 2020-2024 5-year estimates (acs2024_5yr), via Census Reporter API, table B25024. Read Oct 5, 2026.
- 9.Permit office: City of Maitland Community Development Department (permitting). City of Maitland Community Development Department (permitting). Read Oct 10, 2026.
- 10.Orange County Government, Division of Building Safety. Read Oct 5, 2026.
- 11.U.S. Census Bureau, 2020 Census (TIGERweb tigerWMS_Census2020 MapServer: POP100, HU100, AREALAND, AREAWATER). Read Oct 5, 2026.
- 12.U.S. Census Bureau, 2020 Census (TIGERweb tigerWMS_Census2020 MapServer: POP100, HU100, AREALAND, AREAWATER). Read Oct 5, 2026.
- 13.City of Maitland, Lakes Management. Read Oct 5, 2026.
- 14.Water share of total area: 17.2%. U.S. Census Bureau, 2020 Census (TIGERweb tigerWMS_Census2020 MapServer: POP100, HU100, AREALAND, AREAWATER). Read Oct 5, 2026.
- 15.NOAA NCEI, U.S. Climate Normals 1991-2020 (annual/seasonal), access-data API. Read Oct 5, 2026.
- 16.Hurricane Matthew (2016). NWS Melbourne, Post Tropical Cyclone Report: Hurricane Matthew (2016). Read Oct 5, 2026.
- 17.Hurricane Irma (2017). NWS Melbourne, Post Tropical Cyclone Report: Hurricane Irma (2017). Read Oct 5, 2026.
- 18.Hurricane Ian (2022). NWS Melbourne, Post Tropical Cyclone Report: Hurricane Ian (2022). Read Oct 5, 2026.
- 19.City of Maitland, About Maitland. Read Oct 5, 2026.
- 20.Owner-occupied share of occupied homes: 44.4%. U.S. Census Bureau, American Community Survey 2020-2024 5-year estimates (acs2024_5yr), via Census Reporter API. Read Oct 5, 2026.
- 21.People (2020 Census): 19,543. U.S. Census Bureau, 2020 Census (TIGERweb tigerWMS_Census2020 MapServer: POP100, HU100, AREALAND, AREAWATER) (2020 Census count). Read Oct 5, 2026.
- 22.2023 Florida Building Code, Building, 8th ed., Chapter 15 (UpCodes viewer, unofficial transcription), UpCodes (Florida Building Code transcription). Read Oct 5, 2026.
- 23.City of Maitland Community Development Department (permitting), itsmymaitland.com. Read Oct 5, 2026.
- 24.2023 Florida Building Code, Building, 8th ed., Chapter 1 (UpCodes viewer, unofficial transcription), UpCodes (Florida Building Code transcription). Read Oct 5, 2026.
- 25.Florida Statutes, section 713.135 (2026), Florida Legislature. Read Oct 5, 2026.
- 26.Florida Statutes, section 627.7011 (2026), Florida Legislature. Read Oct 4, 2026.
- 27.FRSA, "New 2023 FBC Eighth Edition is Now in Effect", 2024-02-13, floridaroof.com. Read Oct 5, 2026.
- 28.Miami-Dade County RER notice, Miami. Read Oct 5, 2026.
- 29.NOAA Atlas 14 Volume 9 version 2, partial-duration intensity estimates at the Maitland 2020 Census internal point (28.6301, -81.3732), NOAA Hydrometeorological Design Studies Center. Read Oct 5, 2026.
- 30.NOAA Atlas 14 Volume 9 version 2, partial-duration 24-hour depth estimates at the Maitland 2020 Census internal point (28.6301, -81.3732), NOAA Hydrometeorological Design Studies Center. Read Oct 5, 2026.
- 31.NWS Melbourne, Post Tropical Cyclone Report: Hurricane Matthew (2016), National Weather Service. Read Oct 5, 2026.
- 32.NWS Melbourne, Post Tropical Cyclone Report: Hurricane Irma (2017), National Weather Service. Read Oct 5, 2026.
- 33.NWS Melbourne, Post Tropical Cyclone Report: Hurricane Ian (2022), National Weather Service. Read Oct 5, 2026.
South Fork Roofing
Roofing in Maitland: tell us about yours.
Answer a few questions about your roof, or call.