Skip to content

New construction ยท Manatee County

New construction roofing in Manatee County, FL

Homes built in 2010 or later make up 22.4 percent of Manatee County's housing, so new roofs here are a steady part of the market. A roof you permit now falls under the 2023 Florida Building Code, Eighth Edition. That edition holds until applications filed on or after December 31, 2026, which move to the Ninth Edition.

Updated October 2026

Blue Bradenton Riverwalk tower sign beside a river with a bridge and palm trees under clear blue sky.
A roof deck sheathed in red-brown ZIP System panels with black seam tape, a bucket and a ladder on the deck, homes and a street behind.Our work
Photo: Bradenton Riverwalk Tower Plaza by The Grid, CC BY-SA 4.0, cropped

New construction roofing in Manatee County, in short

New homes make up 22.4 percent of the county's housing, and the Building Division in unincorporated Manatee County permits them. Your roof needs a dry-in underlayment, approved roofing products, and inspections for sheathing and roofing before the final. Applications filed on or after December 31, 2026 face the Ninth Edition.

Sources for this answer

Manatee County figures

The Manatee County numbers behind this page

Housing units (2020 Census)
206,633
Housing units (ACS 5-year)
221,234
Median year homes were built
1991
Share of homes built before 2000
61%

Local growth

How fast Manatee County is building

The county counted 206,633 housing units in the 2020 Census and 221,234 in the 2024 five-year estimate. That is about 14,600 more units in a few years. The median home was built in 1991, and 61 percent were built before 2000, so the newer homes stand out against an older stock.

Much of that growth is planned in large pieces. Lakewood Ranch covers about 35,000 acres, with its first neighborhood dating to 1995, and 34,163 of its 34,877 residents live in Manatee. A builder working there schedules roofs for whole streets at a time, not one house.

Code and permits

Which code and permit office apply

For homes outside a city, the permit office is the Manatee County Development Services Building Division. Inside Bradenton, Palmetto or the island cities, confirm with that city's building office. The High-Velocity Hurricane Zone is only Broward and Miami-Dade, so Manatee does not use its extra roofing rules.

Roofing is a mandatory statewide product approval category under Fla. Stat. 553.842. The shingle, tile or metal on your permit should carry a Florida product approval number, which you can look up in the Florida Building Commission search. A product marketed as storm protection without that approval breaks the statute.

Watch the clocks on your Manatee permit. It becomes invalid if work does not start within 6 months, and also if work stops for 6 months. Unless it is actively worked on in good faith, an application lapses once 180 days have passed since it was filed.

Roof deck

Deck, underlayment and dry-in requirements

Sheathing on a new Manatee home is fastened with ring shank nails. The residential code names 2 1/2 inch by 0.131 inch nails, with two smaller ring shank types allowed on sheathing 15/32 inch or thinner. Ask your builder which nail the plans call for before the sheathing inspection.

The code gives three dry-in options for shingle and metal roofs. The first is self-adhering membrane over the entire deck. The second tapes each deck joint with a 3 3/4 inch strip, then adds underlayment over the whole roof. The third is two layers of felt, nailed 12 inches apart in the field and 6 inches at laps. On the Gulf barrier islands, which saw 3 to 5 feet of surge in Idalia, a tight deck matters most.

Along the eaves and gables, lay the drip edge over the underlayment rather than beneath it. Nails sit at most 12 inches apart, or 4 inches where the design wind speed is 110 mph or more.

Build sequence

Scheduling the roof around the inspections

Inspections come in a set order: foundation, framing, sheathing, exterior wall coverings, roofing, then final. The sheathing check covers roof and wall sheathing, fasteners and dry-in. Inspectors evaluate the dry-in layer, insulation, roof coverings, and flashing. A roofer cannot cover the deck until the sheathing passes.

About 60 percent of the 49.05 inches of yearly rain at Sarasota-Bradenton International Airport falls June through September. A deck left open in those months takes in water, so builders try to dry in before the rainy season.

Who installs the roof matters on your contract. Your builder can put on asphalt shingles for a house it is building itself. Tile, metal and membrane belong to a roofing contractor holding a state license, and a general contractor may not advertise as a roofer without one.

Have the Notice of Commencement recorded and posted before the first inspection. The permit card warns that leaving it out can mean you pay twice for the improvements.

New construction

New construction roofing by town in Manatee County

Bids

Request a bid

Questions

New construction roofing in Manatee County: questions

What building code applies to a new roof in Manatee County?

Since December 31, 2023, projects have been governed by the Eighth Edition of the 2023 Florida Building Code. Permit applications and plans submitted on or after December 31, 2026 must meet the Ninth Edition instead. If your lot is in Bradenton or on Anna Maria Island, confirm the filing date and edition with that city's building office. Your builder's application date decides which edition governs.

Source: FRSA, "New 2023 FBC Eighth Edition is Now in Effect", 2024-02-13, read Oct 5, 2026

Related: New construction roofing

Does Manatee County need Miami-Dade product approvals for roofing?

No. The High-Velocity Hurricane Zone is Broward and Miami-Dade only, so Manatee County roofs use statewide product approval under Fla. Stat. 553.842. Look up the Florida product number in the Florida Building Commission search. A Miami-Dade NOA is accepted elsewhere only where the local building official allows it, so ask the Manatee County Building Division before you rely on one.

Source: FBC-Building 2023 Chapter 2 definitions, read Oct 5, 2026

Related: New construction roofing

How many inspections does a new roof need before the final?

Manatee County follows the code's sequence: framing, sheathing (roof and wall sheathing, fasteners, dry-in), then roofing, covering dry-in, insulation, coverings and flashing. Foundation and exterior wall coverings are checked too, then the final. A private provider can do plans review or inspections if the owner gives written authorization, under Fla. Stat. 553.791. Confirm scheduling with the Manatee County Building Division.

Source: 2023 Florida Building Code, Building, 8th ed., Chapter 1 (UpCodes viewer, unofficial transcription), read Oct 5, 2026

Related: New construction roofing

Can my homebuilder install the roof, or must a roofer?

A builder may put asphalt or fiberglass shingles on a new building it is constructing itself. Work involving tile, metal, or membrane roofing must be performed by a contractor holding certification or registration in roofing. With 22.4 percent of Manatee homes built in 2010 or later, many new-home owners see this split spelled out in their contracts. Read yours before signing.

Source: U.S. Census Bureau ACS 2020-2024 5-year, tables B25034 and B25035, read Oct 5, 2026

Related: New construction roofing

What does the builder warranty cover on a new Manatee County home?

Since July 1, 2025, Fla. Stat. 553.837 requires a builder to cover a new home for 1 year against defects in equipment, material or workmanship that violate the Florida Building Code. The year runs from title transfer or first occupancy. Wear and tear, settling, owner-caused defects and natural disasters such as Hurricane Ian in 2022 are excluded.

Source: NOAA National Hurricane Center, Tropical Cyclone Report: Hurricane Ian, read Oct 5, 2026

Related: New construction roofing

Do new Manatee County roofs need gutters?

Where eaves stick out less than 6 inches, you need gutters fitted with downspouts, unless the spot is a gable end rake or sits under another roof. Each downspout has to empty at a point no closer than 1 foot to the sidewall. With 49.05 inches of normal yearly rain at Sarasota-Bradenton International Airport, plan the drainage before the roof is closed in.

Source: NOAA NCEI U.S. Climate Normals 1991-2020, station USW00012871 SARASOTA BRADENTON AP, read Oct 5, 2026

Related: New construction roofing

Sources for this page(44)
  1. 1.Housing units (2020 Census): 206,633. U.S. Census Bureau, 2020 Census (HU100) via TIGERweb tigerWMS_Census2020 layer 82. Read Oct 5, 2026.
  2. 2.Housing units (ACS 5-year): 221,234. U.S. Census Bureau, ACS 2024 5-year (2020-2024), table B25001, via Census Reporter API. Read Oct 5, 2026.
  3. 3.Median year homes were built: 1991. U.S. Census Bureau, ACS 2024 5-year (2020-2024), table B25035, via Census Reporter API. Read Oct 5, 2026.
  4. 4.Share of homes built before 2000: 61%. U.S. Census Bureau, ACS 2024 5-year (2020-2024), table B25034, via Census Reporter API. Read Oct 5, 2026.
  5. 5.Hurricane Eta (2020). NOAA National Hurricane Center, Tropical Cyclone Report: Hurricane Eta. Read Oct 5, 2026.
  6. 6.Hurricane Debby (2024). NOAA National Hurricane Center, Tropical Cyclone Report: Hurricane Debby. Read Oct 5, 2026.
  7. 7.NOAA NCEI U.S. Climate Normals 1991-2020, station USW00012871 SARASOTA BRADENTON AP. Read Oct 5, 2026.
  8. 8.NOAA NHC Tropical Cyclone Reports (Debby, Ian). Read Oct 5, 2026.
  9. 9.Wikipedia (Lakewood Ranch, Bayshore Gardens); Census 2020 block assignment. Read Oct 5, 2026.
  10. 10.U.S. Census Bureau ACS 2020-2024 5-year, tables B25034 and B25035. Read Oct 5, 2026.
  11. 11.Permit office: Manatee County Development Services - Building Division (unincorporated Manatee County). Manatee County Development Services - Building Division (unincorporated Manatee County). Read Oct 10, 2026.
  12. 12.Hurricane Hermine (2016). NOAA National Hurricane Center, Tropical Cyclone Report: Hurricane Hermine. Read Oct 5, 2026.
  13. 13.Hurricane Idalia (2023). NOAA National Hurricane Center, Tropical Cyclone Report: Hurricane Idalia. Read Oct 5, 2026.
  14. 14.Wikipedia, "Manatee County, Florida" and "Longboat Key, Florida" (secondary). Read Oct 5, 2026.
  15. 15.Share of homes built 2010 or later: 22.4%. U.S. Census Bureau, ACS 2024 5-year (2020-2024), table B25034, via Census Reporter API. Read Oct 5, 2026.
  16. 16.Hurricane Ian (2022). NOAA National Hurricane Center, Tropical Cyclone Report: Hurricane Ian. Read Oct 5, 2026.
  17. 17.FBC-Building 2023 Chapter 2 definitions. Read Oct 5, 2026. FBC text read from UpCodes (unofficial transcription): check floridabuilding.org or the ICC viewer before quoting (spec 8.7).
  18. 18.Florida Statutes, section 553.842 (2026). Read Oct 5, 2026.
  19. 19.Florida Building Commission. Read Oct 5, 2026.
  20. 20.2023 Florida Building Code, Building, 8th ed., Chapter 1 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026. FBC text read from UpCodes (unofficial transcription): check floridabuilding.org or the ICC viewer before quoting (spec 8.7). Source URL inherited from C-3 (the research cites it "as C-3").
  21. 21.2023 Florida Building Code, Residential, 8th ed., Chapter 8 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026. FBC text read from UpCodes (unofficial transcription): check floridabuilding.org or the ICC viewer before quoting (spec 8.7).
  22. 22.2023 Florida Building Code, Residential, 8th ed., Chapter 9 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026. FBC text read from UpCodes (unofficial transcription): check floridabuilding.org or the ICC viewer before quoting (spec 8.7). Source URL inherited from COM-29 (the research cites it "as COM-29").
  23. 23.Florida Statutes, section 489.113 (2026). Read Oct 5, 2026.
  24. 24.FRSA, "New 2023 FBC Eighth Edition is Now in Effect", 2024-02-13. Read Oct 5, 2026.
  25. 25.Miami-Dade County RER notice. Read Oct 5, 2026.
  26. 26.miamidade.gov. Read Oct 5, 2026.
  27. 27.Florida Statutes, section 553.791 (2026). Read Oct 5, 2026.
  28. 28.Florida Statutes, section 553.837 (2026). Read Oct 5, 2026.
  29. 29.2023 Florida Building Code, Residential, 8th ed., Chapter 3 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026. FBC text read from UpCodes (unofficial transcription): check floridabuilding.org or the ICC viewer before quoting (spec 8.7).
  30. 30.2023 Florida Building Code, Residential, 8th ed., R318.5 (UpCodes viewer, unofficial transcription); FBC-Building 1503.7. Read Oct 5, 2026. FBC text read from UpCodes (unofficial transcription): check floridabuilding.org or the ICC viewer before quoting (spec 8.7).
  31. 31.U.S. Census Bureau, 2020 Census (HU100) via TIGERweb tigerWMS_Census2020 layer 82, U.S. Census Bureau. Read Oct 5, 2026.
  32. 32.NOAA National Hurricane Center, Tropical Cyclone Report: Hurricane Eta, NOAA National Hurricane Center. Read Oct 5, 2026.
  33. 33.Manatee County Development Services - Building Division (unincorporated Manatee County), Manatee County Development Services. Read Oct 5, 2026.
  34. 34.NOAA National Hurricane Center, Tropical Cyclone Report: Hurricane Hermine, NOAA National Hurricane Center. Read Oct 5, 2026.
  35. 35.NOAA National Hurricane Center, Tropical Cyclone Report: Hurricane Idalia, NOAA National Hurricane Center. Read Oct 5, 2026.
  36. 36.Florida Statutes, section 713.135 (2026), Florida Legislature. Read Oct 5, 2026.
  37. 37.NOAA National Hurricane Center, Tropical Cyclone Report: Hurricane Ian, NOAA National Hurricane Center. Read Oct 5, 2026.
  38. 38.2023 Florida Building Code, Building, 8th ed., Chapter 15 (UpCodes viewer, unofficial transcription), UpCodes (Florida Building Code transcription). Read Oct 5, 2026.
  39. 39.City of Bradenton Beach (official), cityofbradentonbeach.com. Read Oct 5, 2026.
  40. 40.NOAA National Hurricane Center, Tropical Cyclone Report: Hurricane Irma, NOAA National Hurricane Center. Read Oct 5, 2026.
  41. 41.Citizens Property Insurance Corporation, inspections FAQ (updated 2026-03-17), Citizens Property Insurance. Read Oct 4, 2026.
  42. 42.U.S. Census Bureau TIGERweb Census 2020 county geography (AREALAND), U.S. Census Bureau. Read Oct 5, 2026.
  43. 43.NOAA National Hurricane Center, Tropical Cyclone Report: Hurricane Elsa, NOAA National Hurricane Center. Read Oct 5, 2026.
  44. 44.Fla. Stat. 489.105(3)(e), Florida Legislature. Read Oct 5, 2026.

South Fork Roofing

New construction roofing in Manatee County

Answer a few questions about the job, or call.

CallGet a quote