Skip to content

New construction · Anna Maria

New construction roofing in Anna Maria, FL

Only 9.8 percent of Anna Maria homes were built in 2010 or later, so new roofs here are rare and mostly sit on teardowns, lot rebuilds and storm replacements. The edition of the Florida Building Code that governs yours depends on the date your permit application is submitted.

Updated October 2026

Turquoise Gulf water and sandy shore under a large casuarina tree, with two distant people stooping near the waterline.
A roof deck sheathed in red-brown ZIP System panels with black seam tape, a bucket and a ladder on the deck, homes and a street behind.Our work
Photo: Anna Maria,Florida. by Roman Eugeniusz, CC BY-SA 3.0, cropped

Code edition

Which code edition your new permit faces

Effective December 31, 2023, the 2023 Florida Building Code, Eighth Edition, became the governing code. The Ninth (2026) Edition becomes effective on December 31, 2026, and plans submitted on or after that date must comply with it. If your plans reach the City of Anna Maria Building Department near that date, ask which edition applies before you order materials.

Anna Maria sits on the north end of Anna Maria Island, so Manatee County storms shape the design. Storm surge from Hurricane Helene in 2024 caused heavy damage across the island. Water covers 14.1 percent of the town's total area, which is a reason to plan roof edges, drainage and drip edge with care.

Roof assembly

Deck, underlayment and product approval

Roof sheathing is nailed with ring shank nails, and the code names the 2 1/2 inch by 0.131 inch size. For shingle and metal roofs, the dry-in is one of three options: self-adhering membrane over the whole deck, a membrane or tape strip over every deck joint plus underlayment, or two layers of felt-type underlayment with set fastener spacing.

Statewide product approval is mandatory for the roofing category. Anna Maria is not in the High-Velocity Hurricane Zone, which covers only Broward and Miami-Dade counties, so you look up approvals in the Florida Building Commission search rather than relying on a Miami-Dade notice. Without that approval, a product cannot legally be marketed as hurricane or impact protection.

  • Drip edge goes over the underlayment at eaves and gables, fastened at no more than 12 inches on center.
  • The spacing tightens to 4 inches on center where design wind speed is 110 mph or more.
  • Gutters with downspouts are required where eaves project less than 6 inches, and downspouts discharge at least 1 foot from the sidewall.

Inspections

Scheduling the roof with the build

Inspections follow a set sequence in the code: foundation, framing, sheathing, exterior wall coverings, roofing, and finally the closing inspection. On an Anna Maria lot, the roofing stop is where an inspector looks at the dry-in, the flashing and the finished covering. Book the sheathing inspection before the roof covering goes on, because fasteners are checked then.

Installing asphalt or fiberglass shingles yourself as a builder is allowed only when the new building is one you constructed. Any tile, metal or membrane work has to be handled by a certified or registered roofing contractor. Record and post your Notice of Commencement before the first inspection, or the permit card warns you may pay twice.

A permit becomes invalid if work does not start within 6 months of issuance or stops for 6 months, so line up the roof crew with the framing schedule.

Questions

New construction roofing in Anna Maria: questions

What is the 25% roof rule in Florida?

Unless you replace the entire roof section, no more than 25 percent of it may be repaired, replaced or recovered within any 12-month period. The limit does not apply if the roof was built, repaired or replaced under the 2007 Florida Building Code or a later edition. A new Anna Maria roof built to current code starts out inside that exception, but confirm the details with the City of Anna Maria Building Department.

Source: City of Anna Maria - Building Department, read Oct 5, 2026

Related: New construction roofing

Who issues roof permits for new homes in Anna Maria?

The City of Anna Maria Building Department is the office that issues roof permits. Roofing needs a statewide product approval on the permit, and the owner or the owner's contractor may choose a private provider for plans review or inspections with written authorization. Confirm current forms and fees with the building office directly.

Source: City of Anna Maria - Building Department, read Oct 5, 2026

Related: New construction roofing

Does my new home come with a builder warranty on the roof?

As of July 1, 2025, Florida Statute 553.837 obligates a builder to warrant a newly constructed home for 1 year against defects in equipment, material or workmanship that result in a material Florida Building Code violation. Normal wear and tear, settling, defects caused by the owner and acts of God such as a natural disaster fall outside that coverage. Keep in mind that the median home in this area was built in 1975, so a brand new house is the exception and many neighbors are working with much older roofs. Read your own contract for the start date.

Source: NOAA National Hurricane Center, Tropical Cyclone Report: Hurricane Helene, read Oct 5, 2026

Related: New construction roofing

Do Manatee County storms change how I should plan a new roof?

They should. Hurricane Hermine in 2016 brought more than 10 inches of rain at Manatee County sites, and Helene's surge heavily damaged Anna Maria Island in 2024. Plan underlayment, drip edge, soffit fastening and drainage to current code, and ask the building office which edition covers your application.

Source: NOAA National Hurricane Center, Tropical Cyclone Report: Hurricane Helene, read Oct 5, 2026

Related: New construction roofing

Nearby

New construction roofing near Anna Maria

Sources for this page(36)
  1. 1.Permit office: City of Anna Maria - Building Department. City of Anna Maria - Building Department. Read Oct 10, 2026.
  2. 2.Wikipedia, "Anna Maria, Florida" (secondary source). Read Oct 5, 2026.
  3. 3.NOAA National Hurricane Center, Tropical Cyclone Report: Hurricane Helene. Read Oct 5, 2026.
  4. 4.U.S. Census Bureau, Census 2020 place geography (AREALAND/AREAWATER) via TIGERweb tigerWMS_Census2020. Read Oct 5, 2026.
  5. 5.Hurricane Hermine (2016). NOAA National Hurricane Center, Tropical Cyclone Report: Hurricane Hermine. Read Oct 5, 2026.
  6. 6.Share of homes built 2010 or later: 9.8%. U.S. Census Bureau, ACS 2024 5-year (2020-2024), table B25034, via Census Reporter API. Read Oct 5, 2026.
  7. 7.U.S. Census Bureau ACS 2020-2024 5-year, tables B25034 and B25035. Read Oct 5, 2026.
  8. 8.Median year homes were built: 1975. U.S. Census Bureau, ACS 2024 5-year (2020-2024), table B25035, via Census Reporter API. Read Oct 5, 2026.
  9. 9.FRSA, "New 2023 FBC Eighth Edition is Now in Effect", 2024-02-13. Read Oct 5, 2026.
  10. 10.Miami-Dade County RER notice. Read Oct 5, 2026.
  11. 11.2023 Florida Building Code, Residential, 8th ed., Chapter 9 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
  12. 12.2023 Florida Building Code, Residential, 8th ed., Chapter 8 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
  13. 13.FBC-Building 2023 Chapter 2 definitions. Read Oct 5, 2026.
  14. 14.Florida Statutes, section 553.842 (2026). Read Oct 5, 2026.
  15. 15.Florida Building Commission. Read Oct 5, 2026.
  16. 16.2023 Florida Building Code, Residential, 8th ed., Chapter 3 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
  17. 17.2023 Florida Building Code, Building, 8th ed., Chapter 1 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
  18. 18.Florida Statutes, section 489.113 (2026). Read Oct 5, 2026.
  19. 19.2023 Florida Building Code, Building, 8th ed., Chapter 15 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
  20. 20.Florida Statutes, section 553.791 (2026). Read Oct 5, 2026.
  21. 21.Florida Statutes, section 553.837 (2026). Read Oct 5, 2026.
  22. 22.FEMA. Read Oct 5, 2026.
  23. 23.City of Anna Maria - Building Department, cityofannamaria.com. Read Oct 5, 2026.
  24. 24.NOAA National Hurricane Center, Tropical Cyclone Report: Hurricane Hermine, NOAA National Hurricane Center. Read Oct 5, 2026.
  25. 25.Florida Statutes, section 713.135 (2026), Florida Legislature. Read Oct 5, 2026.
  26. 26.U.S. Census Bureau, ACS 2024 5-year (2020-2024), table B25034, via Census Reporter API, U.S. Census Bureau (via Census Reporter). Read Oct 5, 2026.
  27. 27.NOAA National Hurricane Center, Tropical Cyclone Report: Hurricane Eta, NOAA National Hurricane Center. Read Oct 5, 2026.
  28. 28.Florida Statutes, section 627.7011 (2026), Florida Legislature. Read Oct 4, 2026.
  29. 29.City of Bradenton Beach (official), cityofbradentonbeach.com. Read Oct 5, 2026.
  30. 30.U.S. Census Bureau, 2020 Census (POP100) via TIGERweb tigerWMS_Census2020, U.S. Census Bureau. Read Oct 5, 2026.
  31. 31.NOAA National Hurricane Center, Tropical Cyclone Report: Hurricane Irma, NOAA National Hurricane Center. Read Oct 5, 2026.
  32. 32.Wikipedia, "Manatee County, Florida" and "Longboat Key, Florida" (secondary), Wikipedia. Read Oct 5, 2026.
  33. 33.NOAA NCEI U.S. Climate Normals 1991-2020, station USW00012871 SARASOTA BRADENTON AP, NOAA National Centers for Environmental Information. Read Oct 5, 2026.
  34. 34.NOAA Atlas 14 Volume 9 version 2, partial-duration intensity estimates at the Anna Maria 2020 Census internal point (27.5298, -82.7337), NOAA Hydrometeorological Design Studies Center. Read Oct 5, 2026.
  35. 35.Wikipedia (Lakewood Ranch, Bayshore Gardens); Census 2020 block assignment, Wikipedia. Read Oct 5, 2026.
  36. 36.NOAA Atlas 14 Volume 9 version 2, partial-duration 24-hour depth estimates at the Anna Maria 2020 Census internal point (27.5298, -82.7337), NOAA Hydrometeorological Design Studies Center. Read Oct 5, 2026.

South Fork Roofing

New construction roofing in Anna Maria

Answer a few questions about the job, or call.

CallFree estimate