Skip to content

Commercial roofs · Oakland

Commercial roofing in Oakland, FL

Oakland has about 1,545 housing units, by the American Community Survey estimate, with a margin of error of 234. That mix of homes and small buildings is why a commercial roof here usually means a multi-unit building or an association roof, not a big box. The Town's permit office, run under contract, issues the permit.

Updated October 2026

Large oak tree with hanging moss shades the cream town hall and a paved walkway.
A low-slope roof section with a granulated cap sheet in the foreground meeting a gray shingle slope, neighboring homes and a cloudy sky behind.Our work
Photo: OaklandFlorida7094 oak-shaded town hall by עדירל, CC BY-SA 4.0, cropped

Permit and code

Who permits a commercial roof in Oakland

Oakland's Building & Permit Department is contracted to Willdan Engineering, and it works under the 8th Edition (2023) Florida Building Code. That edition took effect December 31, 2023. The Ninth Edition becomes effective December 31, 2026, and applications filed on or after that date must meet it.

Oakland sits in Orange County, which is outside the two counties the state places in its High-Velocity Hurricane Zone. So the stricter HVHZ roofing chapter and its Miami-Dade product notices do not govern your building. Ordinary statewide product approval does apply to roofing products.

Before the first inspection, the Florida Building Code requires a recorded and posted Notice of Commencement. According to the permit card, leaving it out could end up costing you twice for the same work. Ask any bidder who will record it.

Building stock

What Oakland's building stock means for the roof

Homes in this area have a median build year of 2009, compared with 1994 across the county, and 47.5 percent of the units were built in 2010 or later. Only 8.6 percent were built before 1980. A roof on a newer building may fall under the 25 percent rule's exception, but only if that roof itself was built or replaced under the 2007 Florida Building Code or later.

Some houses built for railroad officials and workmen still stand in town, and Oakland was incorporated in 1887. If your property is old, check with the building office before planning work. Orlando and Winter Garden have historic overlay districts, but no fact here shows one in Oakland.

Bids and systems

Low-slope systems, drainage and comparing bids

For a new low-slope roof, the design slope has to be at least one-fourth unit in 12. Built-up, modified bitumen, single-ply, spray foam and liquid-applied systems are all covered by this. Orlando's roughly 51 inches of rain a year, 45 percent of it in June through August, makes drainage the main test of any flat roof.

  • Ask where the secondary overflow drains or scuppers go if walls rise above the roof edge.
  • Ask for the system standard, such as ASTM D6878 for TPO.
  • Ask whether an existing roof gets a recover or a tear-off to the deck.
  • Ask who holds the roofing trade registration, since a general contractor may not advertise as a roofer without it.

Questions

Commercial roofing in Oakland: questions

Who issues a commercial roofing permit in Oakland?

The Town of Oakland Building & Permit Department issues it. The department is contracted to Willdan Engineering and works under the 8th Edition (2023) Florida Building Code. Orange County's Division of Building Safety runs its own permit portal for the county, so confirm with the Oakland office which one covers your parcel before anyone files.

Source: Town of Oakland, Building & Permit Department, read Oct 5, 2026

Related: Commercial roofing

Does the High-Velocity Hurricane Zone apply in Oakland?

That is not correct. Just two counties, Broward and Miami-Dade, form that zone. Oakland is in Orange County and follows the base Florida Building Code, 8th Edition (2023). Roofing products still need statewide product approval, which you can look up by FL number in the Florida Building Commission search.

Source: Town of Oakland, Building & Permit Department, read Oct 5, 2026

Related: Commercial roofing

What is the 25% roof rule for a commercial building?

No more than 25 percent of a roof section can be repaired, replaced or recovered in any 12-month period unless the whole section is brought up to code. The exception covers a roof built or replaced under the 2007 Florida Building Code or later. Oakland's median home was built in 2009, but that describes homes, not roofs, so confirm with the building office.

Source: U.S. Census Bureau, American Community Survey 2020-2024 5-year estimates (acs2024_5yr), via Census Reporter API, table B25035, read Oct 5, 2026

Related: Commercial roofing

How flat can a new commercial roof be in Oakland?

A new low-slope roof needs a design slope of at least one-fourth unit in 12, which is 2 percent. That covers modified bitumen, single-ply, built-up and spray foam. Positive drainage means water clears within 48 hours of rain, which matters with Orlando's 51.45 inches a year.

Source: NOAA NCEI, U.S. Climate Normals 1991-2020 (annual/seasonal), access-data API, read Oct 5, 2026

Related: Commercial roofing

Nearby

Commercial roofing near Oakland

Sources for this page(29)
  1. 1.Town of Oakland, Building & Permit Department. Read Oct 5, 2026.
  2. 2.Permit office: Town of Oakland Building & Permit Department (contracted to Willdan Engineering). Town of Oakland Building & Permit Department (contracted to Willdan Engineering). Read Oct 10, 2026.
  3. 3.Orange County Government, Division of Building Safety. Read Oct 5, 2026.
  4. 4.U.S. Census Bureau, American Community Survey 2020-2024 5-year estimates (acs2024_5yr), via Census Reporter API, table B25035. Read Oct 5, 2026.
  5. 5.U.S. Census Bureau, American Community Survey 2020-2024 5-year estimates (acs2024_5yr), via Census Reporter API, table B25034. Read Oct 5, 2026.
  6. 6.U.S. Census Bureau, American Community Survey 2020-2024 5-year estimates (acs2024_5yr), via Census Reporter API, tables B25034/B25035. Read Oct 5, 2026.
  7. 7.Town of Oakland, Oakland History. Read Oct 5, 2026.
  8. 8.Town of Oakland, About the Town of Oakland. Read Oct 5, 2026.
  9. 9.City of Orlando, Historic Preservation. Read Oct 5, 2026.
  10. 10.City of Winter Garden, Historic District. Read Oct 5, 2026.
  11. 11.NOAA NCEI, U.S. Climate Normals 1991-2020 (annual/seasonal), access-data API. Read Oct 5, 2026.
  12. 12.Housing units (ACS 5-year): 1,545. U.S. Census Bureau, American Community Survey 2020-2024 5-year estimates (acs2024_5yr), via Census Reporter API. Read Oct 5, 2026.
  13. 13.FRSA, "New 2023 FBC Eighth Edition is Now in Effect", 2024-02-13. Read Oct 5, 2026.
  14. 14.Miami-Dade County RER notice. Read Oct 5, 2026.
  15. 15.FBC-Building 2023 Chapter 2 definitions. Read Oct 5, 2026.
  16. 16.Florida Statutes, section 553.842 (2026). Read Oct 5, 2026.
  17. 17.2023 Florida Building Code, Building, 8th ed., Chapter 15 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
  18. 18.FBC-B 2023 Ch. 15. Read Oct 5, 2026.
  19. 19.2023 Florida Building Code, Plumbing, 8th ed., Chapter 11 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
  20. 20.Florida Statutes, section 489.113 (2026). Read Oct 5, 2026.
  21. 21.Florida Building Commission. Read Oct 5, 2026.
  22. 22.Town of Oakland Building & Permit Department (contracted to Willdan Engineering), Town of Oakland Building & Permit Department. Read Oct 5, 2026.
  23. 23.Florida Statutes, section 713.135 (2026), Florida Legislature. Read Oct 5, 2026.
  24. 24.Florida Statutes, section 627.7011 (2026), Florida Legislature. Read Oct 4, 2026.
  25. 25.2023 Florida Building Code, Building, 8th ed., Chapter 1 (UpCodes viewer, unofficial transcription), UpCodes (Florida Building Code transcription). Read Oct 5, 2026.
  26. 26.NWS Melbourne, Post Tropical Cyclone Report: Hurricane Irma (2017), National Weather Service. Read Oct 5, 2026.
  27. 27.NWS Melbourne, Post Tropical Cyclone Report: Hurricane Matthew (2016), National Weather Service. Read Oct 5, 2026.
  28. 28.NOAA Atlas 14 Volume 9 version 2, partial-duration 24-hour depth estimates at the Oakland 2020 Census internal point (28.5523, -81.6367), NOAA Hydrometeorological Design Studies Center. Read Oct 5, 2026.
  29. 29.NWS Melbourne, Lightning Information Center, National Weather Service. Read Oct 5, 2026.

South Fork Roofing

Commercial roofing in Oakland

Answer a few questions about the job, or call.

CallFree estimate