New construction · Tamiami
New construction roofing in Tamiami, FL
Only 2.7 percent of Tamiami homes were built in 2010 or later, so a new roof here is a rare job. Most of the 18,328 housing units are older. A new build in Tamiami falls under Miami-Dade County's permit office and its strict hurricane-zone code.
Updated October 2026

Our workCode and approvals
Code edition and product approval for a new Tamiami roof
Miami-Dade is one of two counties in the High Velocity Hurricane Zone, so Tamiami roofs follow the strongest provisions in the Florida Building Code. The edition depends on the filing date. A package filed from December 31, 2026 onward is reviewed under the Ninth Edition. Earlier filings stay under the 2023 Eighth Edition.
Roofing products must carry approval before they go on your permit. Miami-Dade's Product Control Section reviews roofing systems and certifies the testing labs. In the HVHZ the roofing permit application lists the product approval or Notice of Acceptance numbers. A copy of the full NOA must be at the job site if the building official asks for it.
Tamiami is unincorporated, so the county building office issues the permit, not a city. Check the county's Regulatory and Economic Resources page for current submittal steps.
Roof assembly
Deck, underlayment and drip edge for a Tamiami build
The deck comes first. Roof sheathing is nailed with ring shank nails, and the code names a 2 1/2 inch by 0.131 inch size as the standard choice. Inspectors check the fasteners at the sheathing or dry-in inspection, before anything covers them.
Dry-in has three code options for shingle and metal roofs. You can cover the whole deck with self-adhering membrane, tape every deck joint and add an underlayment, or lay two layers of felt-type underlayment. Drip edge goes over the underlayment at eaves and gables, fastened at most 4 inches apart where design wind speeds are high.
Low-slope sections in the HVHZ have their own limits. New construction needs a deck slope of at least 1/4:12, and loose-laid ballasted systems are not permitted. Tile roofs go over solid sheathing and follow the Florida High Wind tile manual.
Build schedule
Scheduling the roof with inspections and the builder
Six inspections run in a fixed sequence, starting at the foundation and ending at final. Between them sit framing, sheathing, and exterior wall coverings. Roofing is the fifth stop and checks dry-in, flashing and the covering itself. Book the roofer after framing and sheathing pass, and expect the roof to wait on those sign-offs.
On its own new building, a builder can put on shingles without a separate roofer. Tile, metal and membrane work needs a roofing contractor with state certification or registration. Record the Notice of Commencement and post it before the first inspection, or you risk paying twice for the work.
Permits expire if work does not start within 6 months of issue, or stops for 6 months. Since July 1, 2025, a builder must also warrant a new home for 1 year against code-violating defects, with exclusions for wear, settling and natural disasters.
Questions
New construction roofing in Tamiami: questions
Which building code applies to a new roof in Tamiami?
It depends on when the permit application is filed. Miami-Dade County is in the High Velocity Hurricane Zone, which carries the strongest hurricane provisions in the Florida Building Code. Applications filed on or after December 31, 2026 are held to the Ninth Edition. Earlier applications fall under the 2023 Eighth Edition. Confirm the edition and any county amendments with the Miami-Dade County building office, which issues permits for Tamiami.
Source: Florida Building Commission, 'Setting New Standards for Safety: The Florida Building Code' (2004 publication; wind-speed figures in it are outdated and not used), read Oct 5, 2026
Does a new Tamiami roof need a Notice of Acceptance?
Roofing products must have approval, and in Miami-Dade the proof is usually a Notice of Acceptance, or NOA. The roofing permit application carries the product approval or NOA numbers. Miami-Dade's Product Control Section reviews and approves these products. An NOA has an expiration date and is not valid after it. Keep a full copy at the job site for the building official.
Source: Miami-Dade County RER, Board and Code Administration Division, Product Approval, read Oct 5, 2026
Can the builder put the shingles on my new Tamiami home?
Only in one case. Florida law lets a general, building or residential contractor install shingles on a new building it constructs itself. In Tamiami, where 56.5% of homes are single-family detached, a new house could fit that exception. Work on tile, metal or membrane roofs belongs with a roofing contractor who holds state certification or registration. A general contractor who lacks that license cannot legally market their services as roofing work. Before you sign anything, confirm the license with the state.
Source: U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25024, via Census Reporter API, read Oct 5, 2026
What does the 1 year builder warranty cover on a new roof?
For a newly built home, a builder has been required since July 1, 2025 to warrant the house for 1 year against defects in equipment, material or workmanship that cause a material Florida Building Code violation. The year starts at the earlier of title conveyance or initial occupancy. Normal wear and tear, settling, defects the owner caused and natural disasters fall outside it. Read your contract and ask the Miami-Dade County building office about code questions.
Source: Miami-Dade County Regulatory and Economic Resources (RER) - Building & Permits, read Oct 5, 2026
Sources for this page(30)
- 1.Florida Building Commission, 'Setting New Standards for Safety: The Florida Building Code' (2004 publication; wind-speed figures in it are outdated and not used). Read Oct 5, 2026.
- 2.Miami-Dade County RER, Board and Code Administration Division, Product Approval. Read Oct 5, 2026.
- 3.Permit office: Miami-Dade County Regulatory and Economic Resources (RER) - Building & Permits. Miami-Dade County Regulatory and Economic Resources (RER) - Building & Permits. Read Oct 10, 2026.
- 4.U.S. Census Bureau, Building Permits Survey county annual files (co2025a.txt, co2020a.txt). Read Oct 5, 2026.
- 5.Share of homes built 2010 or later: 2.7%. U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25034, via Census Reporter API. Read Oct 5, 2026.
- 6.Housing units (ACS 5-year): 18,328. U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25001, via Census Reporter API. Read Oct 5, 2026.
- 7.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25035, via Census Reporter API. Read Oct 5, 2026.
- 8.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25024, via Census Reporter API. Read Oct 5, 2026.
- 9.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25035, B25034, B25024, via Census Reporter API. Read Oct 5, 2026.
- 10.FBC-Building 2023 Chapter 2 definitions. Read Oct 5, 2026.
- 11.FRSA, "New 2023 FBC Eighth Edition is Now in Effect", 2024-02-13. Read Oct 5, 2026.
- 12.Miami-Dade County RER notice. Read Oct 5, 2026.
- 13.Florida Statutes, section 553.842 (2026). Read Oct 5, 2026.
- 14.miamidade.gov. Read Oct 5, 2026.
- 15.2023 Florida Building Code, Residential, 8th ed., Chapter 8 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
- 16.2023 Florida Building Code, Building, 8th ed., Chapter 1 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
- 17.2023 Florida Building Code, Residential, 8th ed., Chapter 9 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
- 18.2023 Florida Building Code, Building, 8th ed., Chapter 15 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
- 19.Florida Statutes, section 489.113 (2026). Read Oct 5, 2026.
- 20.Florida Statutes, section 553.837 (2026). Read Oct 5, 2026.
- 21.Miami-Dade County Regulatory and Economic Resources (RER) - Building & Permits, Miami. Read Oct 5, 2026.
- 22.Florida Statutes, section 713.135 (2026), Florida Legislature. Read Oct 5, 2026.
- 23.Florida Statutes, section 627.7011 (2026), Florida Legislature. Read Oct 4, 2026.
- 24.Fla. Stat. 489.105(3)(e), Florida Legislature. Read Oct 5, 2026.
- 25.NOAA NCEI U.S. Climate Normals 1991-2020 (access data service), NOAA National Centers for Environmental Information. Read Oct 5, 2026.
- 26.NOAA NCEI U.S. Climate Normals 1991-2020 (access data service), NOAA National Centers for Environmental Information. Read Oct 5, 2026.
- 27.NOAA Atlas 14 Volume 9 version 2, partial-duration 24-hour depth estimates at the Tamiami 2020 Census internal point (25.7563, -80.4026), NOAA Hydrometeorological Design Studies Center. Read Oct 5, 2026.
- 28.NOAA National Hurricane Center, Tropical Cyclone Report: Hurricane Irma (AL112017), NOAA National Hurricane Center. Read Oct 5, 2026.
- 29.NOAA National Hurricane Center, Tropical Cyclone Climatology, NOAA National Hurricane Center. Read Oct 5, 2026.
- 30.Wikipedia, 'Tamiami, Florida' (revision 1374943879), Wikipedia. Read Oct 5, 2026.
South Fork Roofing
New construction roofing in Tamiami
Answer a few questions about the job, or call.
