About 34.7 percent of homes in Tamiami were built before 1980, and the median home dates to 1984. Many original roofs in this area are likely well beyond 25 years old, by that measure. A replacement in this part of Miami-Dade County needs a county permit and follows the High Velocity Hurricane Zone rules.

Updated October 2026

Aerial view of flat green wetland with a long straight road and canal under cloudy sky.
Drone view of a single-story home mid re-roof: part of the roof stripped to white synthetic underlayment, the rest still in gray shingles, a dump trailer of debris and a pickup in the driveway.Our work
Photo: AER Shark Slough looking S to ENP across Hwy41, NPSPhoto by Everglades NPS from Homestead, Florida, Public domain, cropped

Tamiami figures this page uses

Housing units (ACS 5-year)
18,328
Share of homes built 2010 or later
2.7%
Owner-occupied share of occupied homes
71.7%
Single-family detached share of housing units
56.5%

Housing age

The age of Tamiami homes affects how you should approach your roof decision

Tamiami has 18,328 housing units, and only 2.7 percent were built in 2010 or later. Most homes here were built before the 2007 code editions, so many roofs are likely older than that. A roof built before 2007 does not get the 25 percent exception described below.

Owners make up 71.7 percent of occupied homes, and single-family detached homes are 56.5 percent of units. Many of these roofs belong to people deciding for themselves, not a landlord. Another 6.1 percent of units are mobile homes, which follow the HUD code, not the Florida Building Code.

Insurance age matters too. When a roof reaches 15 years, your insurer must let you hire an authorized inspector at your own expense. If the inspector finds 5 or more years of useful life left, the insurer cannot drop you for age alone. How that rule applies to your own policy is something your insurer or agent can walk you through.

Permit and code

What a Tamiami re-roof triggers

Because Tamiami falls in unincorporated Miami-Dade, your roof permit comes from Miami-Dade County Regulatory and Economic Resources. Inside the High Velocity Hurricane Zone, all roofing work needs a Uniform Roofing Permit Application signed by a licensed contractor. Attachments include the owner notification form and product approval pages. The county building office can confirm the current steps.

Miami-Dade requires a full tear-off to the deck where the old roof is water soaked, or where it already carries two or more coverings. New roofing may not go over sheathing that is not fastened to code. That makes deck nailing an inspection point on older Tamiami homes.

The contractor must also tell you about any chance of ponding water and suggest a structural review if it is possible. Roofing work includes required deck attachment and replacement of rotted sheathing as needed. You may pay twice for the work if you skip recording a Notice of Commencement before the first inspection.

Repair or replace

The 25 percent rule on a 1980s roof

Florida's rule says no more than 25 percent of a roof may be repaired or replaced in any 12-month period unless the whole roof section is replaced. The exception covers only a roof built or redone to the 2007 Florida Building Code or later. A roof from the 1984 median era does not qualify, so heavy repairs can push you to a full replacement.

Questions

Roof replacement in Tamiami: questions

What is the 25% roof rule in Florida?

Unless the whole section is replaced, repairs, replacement or recovering may not touch more than 25 percent of a roof section in any 12-month period. The exception applies only if the existing roof was built or redone to the 2007 Florida Building Code or later. With 34.7 percent of Tamiami homes built before 1980, many roofs here are likely too old for that exception. Confirm your roof's status with the Miami-Dade County building office.

Source: U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25024, via Census Reporter API, read Oct 5, 2026

Related: Roof replacement

What is the 15 year roof rule in Florida?

If your roof is 15 years or older, your insurer must allow an authorized inspector to check it, with you covering the cost. If the inspection shows 5 or more years of useful life left, the insurer cannot refuse or non-renew you for age alone. With a median build year of 1984 in Tamiami, many owners may reach this question. For how it plays out under your particular policy, ask your insurer or agent.

Source: U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25035, via Census Reporter API, read Oct 5, 2026

Related: Roof replacement

Who issues a roof permit in Tamiami?

Miami-Dade County Regulatory and Economic Resources issues it, because Tamiami is an unincorporated census-designated place. In the High Velocity Hurricane Zone, a licensed contractor signs a Uniform Roofing Permit Application and attaches the owner notification form and product approval pages. Confirm current steps and fees with the county building office before work starts.

Source: Miami-Dade County Regulatory and Economic Resources (RER) - Building & Permits, read Oct 5, 2026

Related: Roof replacement

Can a handyman replace my roof in Florida?

Generally no. Roofing is its own contractor category in Florida. Unless it holds a roofing certificate or registration, a general, building or residential contractor has to subcontract the roofing work. The only exception is shingles on a new building of its own construction. Inside Miami-Dade's hurricane zone, the permit application itself must be signed by a licensed contractor. This matters locally because the median home was built in 1984, so many roofs are old enough to need a qualified roofer's attention.

Source: Florida Building Commission, 'Setting New Standards for Safety: The Florida Building Code' (2004 publication; wind-speed figures in it are outdated and not used), read Oct 5, 2026

Related: Roof replacement

Nearby

Roof replacement near Tamiami

Sources for this page(27)
  1. 1.Housing units (ACS 5-year): 18,328. U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25001, via Census Reporter API. Read Oct 5, 2026.
  2. 2.Share of homes built 2010 or later: 2.7%. U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25034, via Census Reporter API. Read Oct 5, 2026.
  3. 3.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25035, B25034, B25024, via Census Reporter API. Read Oct 5, 2026.
  4. 4.Owner-occupied share of occupied homes: 71.7% (12,624 of 17,598). U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25003, via Census Reporter API. Read Oct 5, 2026.
  5. 5.Single-family detached share of housing units: 56.5%. U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25024, via Census Reporter API. Read Oct 5, 2026.
  6. 6.Mobile homes, share of housing units: 6.1%. U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25024, via Census Reporter API. Read Oct 5, 2026.
  7. 7.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25024, via Census Reporter API. Read Oct 5, 2026.
  8. 8.Permit office: Miami-Dade County Regulatory and Economic Resources (RER) - Building & Permits. Miami-Dade County Regulatory and Economic Resources (RER) - Building & Permits. Read Oct 10, 2026.
  9. 9.Florida Building Commission, 'Setting New Standards for Safety: The Florida Building Code' (2004 publication; wind-speed figures in it are outdated and not used). Read Oct 5, 2026.
  10. 10.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25035, via Census Reporter API. Read Oct 5, 2026.
  11. 11.Median year homes were built: 1984. U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25035, via Census Reporter API. Read Oct 5, 2026.
  12. 12.Share of homes built before 1980: 34.7%. U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25034, via Census Reporter API. Read Oct 5, 2026.
  13. 13.2023 Florida Building Code, Building, 8th ed., Chapter 15 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
  14. 14.2023 Florida Building Code, Building, 8th ed., Chapter 1 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
  15. 15.Florida Statutes, section 627.7011 (2026). Read Oct 5, 2026.
  16. 16.Fla. Stat. 489.105(3)(e). Read Oct 5, 2026.
  17. 17.Florida Statutes, section 553.844 (2026). Read Oct 5, 2026.
  18. 18.Florida Statutes, section 489.113 (2026). Read Oct 5, 2026.
  19. 19.Miami-Dade County Regulatory and Economic Resources (RER) - Building & Permits, Miami. Read Oct 5, 2026.
  20. 20.Florida Statutes, section 713.135 (2026), Florida Legislature. Read Oct 5, 2026.
  21. 21.miamidade.gov, miamidade.gov. Read Oct 5, 2026.
  22. 22.NOAA NCEI U.S. Climate Normals 1991-2020 (access data service), NOAA National Centers for Environmental Information. Read Oct 5, 2026.
  23. 23.NOAA NCEI U.S. Climate Normals 1991-2020 (access data service), NOAA National Centers for Environmental Information. Read Oct 5, 2026.
  24. 24.NOAA Atlas 14 Volume 9 version 2, partial-duration 24-hour depth estimates at the Tamiami 2020 Census internal point (25.7563, -80.4026), NOAA Hydrometeorological Design Studies Center. Read Oct 5, 2026.
  25. 25.NOAA National Hurricane Center, Tropical Cyclone Report: Hurricane Irma (AL112017), NOAA National Hurricane Center. Read Oct 5, 2026.
  26. 26.NOAA National Hurricane Center, Tropical Cyclone Climatology, NOAA National Hurricane Center. Read Oct 5, 2026.
  27. 27.Wikipedia, 'Tamiami, Florida' (revision 1374943879), Wikipedia. Read Oct 5, 2026.

South Fork Roofing

Roof replacement in Tamiami

Answer a few questions about the job, or call.

CallFree estimate