New construction ยท Kendale Lakes
New construction roofing in Kendale Lakes, FL
Only 1.3 percent of homes in Kendale Lakes were built in 2010 or later, so most roofing work here is on older houses. New construction still goes up, though, and a new home here runs through the same Miami-Dade permit, product approval and inspection steps that govern any roof in a high wind zone. Plan the permit, the approval numbers and the inspection order before the first shingle or tile arrives.
Updated October 2026

Our workPermits and approvals
What the Miami-Dade process means for a new roof
The county building office, Miami-Dade Regulatory and Economic Resources, issues roof permits for Kendale Lakes because the community is unincorporated. Kendale Lakes is treated as part of the county rather than a city with its own building department, so that office is the first call.
Miami-Dade sits in the High-Velocity Hurricane Zone, which means every roofing product must carry a statewide approval or a Miami-Dade Notice of Acceptance. The permit application asks for those numbers. You can look up the approval through the state product approval search by its FL number.
Inspection sequence
Timing the roof crew against the Kendale Lakes build
The code sets the order of inspections. Framing must be complete and roof sheathing must be fastened before the dry-in inspection. The roofing inspection covers the dry-in layer, the roof covering and the flashing, and it comes before the final.
- Roof sheathing nailed with the ring shank nails the code names
- Dry-in underlayment in place, using one of the three approved options
- Drip edge fastened at the eaves and gables before the covering goes on
- Tile, if used, set over solid sheathing and to the manufacturer's instructions
Permits also expire if work stalls. A permit that does not start within six months can become invalid, and a stop of six months or more counts as abandonment. Plan the roof crew so the build does not sit idle past those dates.
Codes and crews
Code edition and who may do the work
The 2023 edition of the Florida Building Code has applied since December 31, 2023. A Kendale Lakes application filed on or after December 31, 2026 moves to the Ninth Edition, so a late-year filing deserves a check with the county before plans are finalized.
A builder may put asphalt or fiberglass shingles on its own new building without a roofing license. Tile, metal and membrane work on a Miami-Dade roof goes to a contractor holding a roofing certificate or registration.
Questions
New construction roofing in Kendale Lakes: questions
Do new homes in Kendale Lakes need a 2026 code edition roof?
It depends on the filing date. Applications submitted on or after December 31, 2026 fall under the Ninth Edition of the Florida Building Code, while earlier ones stay under the 2023 Eighth Edition. Miami-Dade Regulatory and Economic Resources, the office that issues permits in Kendale Lakes, can confirm which edition applies to a specific application.
Source: Miami-Dade County RER notice, read Oct 5, 2026
Who issues the roof permit for new construction in Kendale Lakes?
Miami-Dade Regulatory and Economic Resources issues the permit. Kendale Lakes is a census-designated place inside unincorporated Miami-Dade County, so the county building office handles the application.
Source: Miami-Dade County Regulatory and Economic Resources (RER) - Building & Permits, read Oct 5, 2026
Can an owner use a private provider on a Kendale Lakes build?
Yes, the owner may choose one. Under Florida Statute 553.791(2)(a), the fee owner, or the owner's contractor with written authorization, may hire a private provider for plans review or inspections. Miami-Dade Regulatory and Economic Resources still issues the Kendale Lakes permit, and the county sits in the High-Velocity Hurricane Zone, so ask that office how a provider's reports are handled. Many homes in the area date to a median build year of 1980, so older roofs deserve a close look during plan review. Confirm the provider's license with the state before signing.
Source: Florida Statutes, section 553.791 (2026), read Oct 5, 2026
What does the builder warranty cover for a new roof in Florida?
Florida Statute 553.837 requires a builder to warrant a newly constructed home for one year against construction defects of equipment, material or workmanship that cause a material violation of the Florida Building Code. For a Kendale Lakes home, where only 1.3 percent of housing was built in 2010 or later, that one-year coverage is most relevant to recent builds. Your builder or your insurer can explain how the one year applies to your home.
Source: Florida Statutes, section 553.837 (2026), read Oct 5, 2026
Nearby
New construction roofing near Kendale Lakes
Sources for this page(32)
- 1.Permit office: Miami-Dade County Regulatory and Economic Resources (RER) - Building & Permits. Miami-Dade County Regulatory and Economic Resources (RER) - Building & Permits. Read Oct 10, 2026.
- 2.Miami-Dade County RER, Board and Code Administration Division, Product Approval. Read Oct 5, 2026.
- 3.Florida Building Commission, 'Setting New Standards for Safety: The Florida Building Code' (2004 publication; wind-speed figures in it are outdated and not used). Read Oct 5, 2026.
- 4.Share of homes built 2010 or later: 1.3%. U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25034, via Census Reporter API. Read Oct 5, 2026.
- 5.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25035, B25034, B25024, via Census Reporter API. Read Oct 5, 2026.
- 6.Wikipedia, 'Kendale Lakes, Florida' (revision 1374451112). Read Oct 5, 2026.
- 7.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25035, via Census Reporter API. Read Oct 5, 2026.
- 8.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25024, via Census Reporter API. Read Oct 5, 2026.
- 9.Median year homes were built: 1980. U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25035, via Census Reporter API. Read Oct 5, 2026.
- 10.FBC-Building 2023 Chapter 2 definitions. Read Oct 5, 2026. FBC text read from UpCodes (unofficial transcription): check floridabuilding.org or the ICC viewer before quoting (spec 8.7).
- 11.Florida Statutes, section 553.842 (2026). Read Oct 5, 2026.
- 12.Florida Building Commission. Read Oct 5, 2026.
- 13.miamidade.gov. Read Oct 5, 2026.
- 14.2023 Florida Building Code, Building, 8th ed., Chapter 1 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026. FBC text read from UpCodes (unofficial transcription): check floridabuilding.org or the ICC viewer before quoting (spec 8.7). Source URL inherited from C-3 (the research cites it "as C-3").
- 15.2023 Florida Building Code, Residential, 8th ed., Chapter 8 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026. FBC text read from UpCodes (unofficial transcription): check floridabuilding.org or the ICC viewer before quoting (spec 8.7).
- 16.2023 Florida Building Code, Residential, 8th ed., Chapter 9 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026. FBC text read from UpCodes (unofficial transcription): check floridabuilding.org or the ICC viewer before quoting (spec 8.7). Source URL inherited from COM-29 (the research cites it "as COM-29").
- 17.FRSA, "New 2023 FBC Eighth Edition is Now in Effect", 2024-02-13. Read Oct 5, 2026.
- 18.Miami-Dade County RER notice. Read Oct 5, 2026.
- 19.Florida Statutes, section 489.113 (2026). Read Oct 5, 2026.
- 20.Florida Statutes, section 553.791 (2026). Read Oct 5, 2026.
- 21.Florida Statutes, section 553.837 (2026). Read Oct 5, 2026.
- 22.Miami-Dade County Regulatory and Economic Resources (RER) - Building & Permits, Miami. Read Oct 5, 2026.
- 23.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25034, via Census Reporter API, U.S. Census Bureau (via Census Reporter). Read Oct 5, 2026.
- 24.Florida Statutes, section 627.7011 (2026), Florida Legislature. Read Oct 4, 2026.
- 25.Florida Statutes, section 713.135 (2026), Florida Legislature. Read Oct 5, 2026.
- 26.2023 Florida Building Code, Building, 8th ed., Chapter 15 (UpCodes viewer, unofficial transcription), UpCodes (Florida Building Code transcription). Read Oct 5, 2026.
- 27.NOAA NCEI U.S. Climate Normals 1991-2020 (access data service), NOAA National Centers for Environmental Information. Read Oct 5, 2026.
- 28.NOAA NCEI U.S. Climate Normals 1991-2020 (access data service), NOAA National Centers for Environmental Information. Read Oct 5, 2026.
- 29.NOAA National Hurricane Center, Tropical Cyclone Climatology, NOAA National Hurricane Center. Read Oct 5, 2026.
- 30.NOAA Atlas 14 Volume 9 version 2, partial-duration intensity estimates at the Kendale Lakes 2020 Census internal point (25.7069, -80.4116), NOAA Hydrometeorological Design Studies Center. Read Oct 5, 2026.
- 31.NOAA Atlas 14 Volume 9 version 2, partial-duration 24-hour depth estimates at the Kendale Lakes 2020 Census internal point (25.7069, -80.4116), NOAA Hydrometeorological Design Studies Center. Read Oct 5, 2026.
- 32.NOAA National Hurricane Center, Tropical Cyclone Report: Hurricane Irma (AL112017), NOAA National Hurricane Center. Read Oct 5, 2026.
South Fork Roofing