Skip to content

New construction · Kendale Lakes

New construction roofing in Kendale Lakes, FL

Only 1.3 percent of Kendale Lakes homes were built in 2010 or later, so a new roof on a new build is uncommon here. The 2023 Florida Building Code governs permits until the Ninth Edition starts December 31, 2026. Miami-Dade County issues the permit.

Updated October 2026

Glass entrance doors of a pale yellow building with painted figures and palm trees in front.
A roof deck sheathed in red-brown ZIP System panels with black seam tape, a bucket and a ladder on the deck, homes and a street behind.Our work
Photo: View of Kendale Lakes Branch Library by Alexandra Rincon, CC BY-SA 4.0, cropped

Code edition

Which code edition your Kendale Lakes permit faces

Kendale Lakes is unincorporated, so Miami-Dade County Regulatory and Economic Resources issues your building permit. Confirm the current submittal rules with that office. The county is one of two High Velocity Hurricane Zone counties, which brings stricter roofing provisions than most of Florida.

Edition timing matters if your plans are not yet filed. Any Kendale Lakes application submitted from December 31, 2026 onward must follow the Ninth Edition. Plans filed before that day stay under the 2023 Eighth Edition. Ask your designer which date applies to your submittal.

Around Kendale Lakes the housing median year built is 1980, the same as the county. Miami-Dade permitted 2,666 single-family units in 2025, against 2,133 in 2020. That is 533 more. Your inspector sees new work often.

Roof build

New roof decking, underlayment and the product approval that goes with them

Ring shank nails are what hold the sheathing down on a new home's roof. The residential code names ASTM F1667 RSRS-03 nails, 2 1/2 inches long, as the standard choice. Smooth-shank nails do not meet that requirement.

The code offers three dry-in methods when the roof is shingle or metal. Self-adhering membrane laid across the entire deck is one of those methods. Another is a strip at least 3 3/4 inches wide over every deck joint, then underlayment. The third is two layers of felt-type underlayment with ring or deformed shank cap nails.

Roofing falls under mandatory statewide product approval, and Miami-Dade's Product Control Section reviews roofing products and systems. Your permit application carries the approval or Notice of Acceptance numbers. Keep a full copy of each Notice of Acceptance at the job site, because the building official may ask to see it.

Inspections

Scheduling the roof around the build

The order of inspections is fixed, starting with foundation and framing, then sheathing, exterior wall coverings and soffit, roofing, and finally the final inspection. Roofing comes fifth of the six, so the roof covering and flashing wait until the sheathing inspection has passed. Book your Kendale Lakes roofer for that point in the schedule.

Who installs matters too. Only on a new building it constructed itself may a builder install asphalt shingles without a roofing contractor. A certified or registered roofing contractor must handle any tile, metal or membrane roof.

Before the first inspection, your Notice of Commencement needs to be recorded and posted on the job site. Work that has not begun within 6 months after the permit is issued also causes the permit to lapse.

Questions

New construction roofing in Kendale Lakes: questions

Does a new home in Kendale Lakes need a Miami-Dade product approval for its roof?

Yes. Roofing is a mandatory statewide product approval category, and Miami-Dade County sits in the High Velocity Hurricane Zone. In Miami-Dade, the Product Control Section reviews and approves or denies roofing products and systems. Your permit application carries the approval or Notice of Acceptance numbers. Check that each one is current, because a Notice of Acceptance is not valid after its expiration date.

Source: Florida Building Commission, 'Setting New Standards for Safety: The Florida Building Code' (2004 publication; wind-speed figures in it are outdated and not used), read Oct 5, 2026

Related: New construction roofing

Which Florida Building Code edition applies to my new Kendale Lakes roof?

The answer turns on the date your permit application is submitted. December 31, 2023 was the effective date of the 2023 Eighth Edition. The Ninth Edition applies to applications submitted on or after December 31, 2026. Kendale Lakes permits come from Miami-Dade County, so confirm the submittal date and edition with the county building office before your plans go in.

Source: Miami-Dade County Regulatory and Economic Resources (RER) - Building & Permits, read Oct 5, 2026

Related: New construction roofing

What builder coverage do I get on a newly built Kendale Lakes home?

Florida law since July 1, 2025 requires a builder to cover a newly constructed home for 1 year against defects in equipment, material or workmanship that cause a material Florida Building Code violation. The year runs from the earlier of title transfer or initial occupancy. Normal wear and tear, settling, defects the owner caused and natural disasters all fall outside what it covers. Read your contract for the exact terms.

Source: U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25034, via Census Reporter API, read Oct 5, 2026

Related: New construction roofing

Can I use a private inspector for my new roof in Miami-Dade County?

Florida law lets the fee owner, or the owner's contractor with written authorization, choose a private provider for plans review or code inspection at any time. Anyone acting as a private provider must be a licensed building code administrator, engineer or architect. Ask Miami-Dade County Regulatory and Economic Resources how it handles private provider reports for a Kendale Lakes permit.

Source: Miami-Dade County Regulatory and Economic Resources (RER) - Building & Permits, read Oct 5, 2026

Related: New construction roofing

Nearby

New construction roofing near Kendale Lakes

Sources for this page(31)
  1. 1.Permit office: Miami-Dade County Regulatory and Economic Resources (RER) - Building & Permits. Miami-Dade County Regulatory and Economic Resources (RER) - Building & Permits. Read Oct 10, 2026.
  2. 2.Florida Building Commission, 'Setting New Standards for Safety: The Florida Building Code' (2004 publication; wind-speed figures in it are outdated and not used). Read Oct 5, 2026.
  3. 3.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25035, via Census Reporter API. Read Oct 5, 2026.
  4. 4.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25024, via Census Reporter API. Read Oct 5, 2026.
  5. 5.Median year homes were built: 1980. U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25035, via Census Reporter API. Read Oct 5, 2026.
  6. 6.U.S. Census Bureau, Building Permits Survey county annual files (co2025a.txt, co2020a.txt). Read Oct 5, 2026.
  7. 7.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25035, B25034, B25024, via Census Reporter API. Read Oct 5, 2026.
  8. 8.Miami-Dade County RER, Board and Code Administration Division, Product Approval. Read Oct 5, 2026.
  9. 9.Share of homes built 2010 or later: 1.3%. U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25034, via Census Reporter API. Read Oct 5, 2026.
  10. 10.FBC-Building 2023 Chapter 2 definitions. Read Oct 5, 2026.
  11. 11.FRSA, "New 2023 FBC Eighth Edition is Now in Effect", 2024-02-13. Read Oct 5, 2026.
  12. 12.Miami-Dade County RER notice. Read Oct 5, 2026.
  13. 13.2023 Florida Building Code, Residential, 8th ed., Chapter 8 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
  14. 14.2023 Florida Building Code, Residential, 8th ed., Chapter 9 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
  15. 15.Florida Statutes, section 553.842 (2026). Read Oct 5, 2026.
  16. 16.miamidade.gov. Read Oct 5, 2026.
  17. 17.2023 Florida Building Code, Building, 8th ed., Chapter 1 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
  18. 18.Florida Statutes, section 489.113 (2026). Read Oct 5, 2026.
  19. 19.Florida Statutes, section 553.837 (2026). Read Oct 5, 2026.
  20. 20.Florida Statutes, section 553.791 (2026). Read Oct 5, 2026.
  21. 21.Miami-Dade County Regulatory and Economic Resources (RER) - Building & Permits, Miami. Read Oct 5, 2026.
  22. 22.Florida Statutes, section 713.135 (2026), Florida Legislature. Read Oct 5, 2026.
  23. 23.Florida Statutes, section 627.7011 (2026), Florida Legislature. Read Oct 4, 2026.
  24. 24.2023 Florida Building Code, Building, 8th ed., Chapter 15 (UpCodes viewer, unofficial transcription), UpCodes (Florida Building Code transcription). Read Oct 5, 2026.
  25. 25.NOAA NCEI U.S. Climate Normals 1991-2020 (access data service), NOAA National Centers for Environmental Information. Read Oct 5, 2026.
  26. 26.NOAA NCEI U.S. Climate Normals 1991-2020 (access data service), NOAA National Centers for Environmental Information. Read Oct 5, 2026.
  27. 27.NOAA National Hurricane Center, Tropical Cyclone Climatology, NOAA National Hurricane Center. Read Oct 5, 2026.
  28. 28.NOAA Atlas 14 Volume 9 version 2, partial-duration intensity estimates at the Kendale Lakes 2020 Census internal point (25.7069, -80.4116), NOAA Hydrometeorological Design Studies Center. Read Oct 5, 2026.
  29. 29.NOAA Atlas 14 Volume 9 version 2, partial-duration 24-hour depth estimates at the Kendale Lakes 2020 Census internal point (25.7069, -80.4116), NOAA Hydrometeorological Design Studies Center. Read Oct 5, 2026.
  30. 30.NOAA National Hurricane Center, Tropical Cyclone Report: Hurricane Irma (AL112017), NOAA National Hurricane Center. Read Oct 5, 2026.
  31. 31.Wikipedia, 'Kendale Lakes, Florida' (revision 1374451112), Wikipedia. Read Oct 5, 2026.

South Fork Roofing

New construction roofing in Kendale Lakes

Answer a few questions about the job, or call.

CallFree estimate