New construction · Westwood Lakes
New construction roofing in Westwood Lakes, FL
Only 0.7 percent of Westwood Lakes homes were built in 2010 or later, so a new-construction roof here is the exception. Most lots hold homes from the 1950s. If you are building, the county building office permits the roof, and Miami-Dade's strict hurricane zone rules apply from the first nail.
Updated October 2026

Code and approvals
Which code edition and product rules apply here
Westwood Lakes sits in unincorporated Miami-Dade, so Miami-Dade County Regulatory and Economic Resources is the office that issues your permit. Miami-Dade sits in the High-Velocity Hurricane Zone, which the code defines as Broward and Miami-Dade counties. That zone carries extra roofing provisions beyond the rest of Florida.
Timing decides your code edition. December 31, 2023 is when the 2023 Eighth Edition took effect. Any permit application and plans submitted on or after December 31, 2026 are governed by the Ninth Edition. If your plans are close to that date, ask the building office which edition will govern.
Roofing products need approval. Statewide approval is mandatory for roofing under Fla. Stat. 553.842, and the county's Product Control Section approves or denies roofing systems and certifies the testing labs. The HVHZ permit application carries the product approval or Notice of Acceptance numbers, and a copy of the notice must be at the job site for the building official.
Building the roof
Deck, underlayment and who may install
Under the residential code, ring shank nails measuring 2 1/2 inches long by 0.131 inch fasten the roof sheathing on a new home. The dry-in comes next. You choose one of three methods: a fully self-adhering membrane, a 3 3/4-inch strip over every deck joint plus an approved underlayment, or two layers of felt-type underlayment nailed with cap nails.
Low-slope sections in the hurricane zone have their own limits. No loose laid ballasted or nonballasted system is allowed, and new construction needs at least a 1/4:12 deck slope. Solid sheathing sits under a tile roof, and installation follows the Florida high wind tile manual.
A builder with only a general or residential license must subcontract roofing. The exception is asphalt or fiberglass shingles on a new building of the builder's own construction. A certified or registered roofing contractor handles tile, metal and membrane roofs, and a general contractor cannot advertise as a roofer without that license.
Inspection order
Scheduling the roof around the inspections
Inspections are listed in the code in this order: foundation, framing, sheathing, exterior wall coverings and soffit, roofing, and finally the final inspection. The roofing inspection focuses on four items: dry-in, insulation, roof coverings and flashing. Book the roofer after the sheathing inspection passes so the dry-in is not covered before the inspector sees the fasteners.
Mind the permit clocks. Your permit becomes invalid if work has not begun within 6 months of issuance, or if work halts for 6 months. Record the Notice of Commencement and post it at the site before the first inspection, or you may risk paying twice for the improvements.
Miami-Dade permitted 2,666 single-family units in 2025, up from 2,133 in 2020, so inspector and crew schedules can fill. Where eaves project less than 6 inches, you need gutters with downspouts, and the downspouts must discharge at least 1 foot from the sidewall.
Questions
New construction roofing in Westwood Lakes: questions
What is the new law in Florida about roofs for a new home?
Under Fla. Stat. 553.837, in effect since July 1, 2025, a builder must warrant a newly constructed home for 1 year against defects in equipment, material or workmanship that cause a material Florida Building Code violation. Natural disasters, settling, wear and tear, and damage caused by the owner are not covered. In Westwood Lakes, where only 0.7 percent of homes date to 2010 or later, ask your builder to put the roofing coverage in writing.
Source: U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25034, via Census Reporter API, read Oct 5, 2026
Do roofing products in Westwood Lakes need special approval?
Yes. Roofing is a mandatory statewide-approval category under Fla. Stat. 553.842, and Miami-Dade's Product Control Section reviews roofing systems for the county. Approval or Notice of Acceptance numbers go on the permit application. Each Notice of Acceptance expires on the date it states, and the building official must be able to see a copy at the job site.
Source: Florida Statutes, section 553.842 (2026), read Oct 5, 2026
Can my builder install the roof himself?
Only in one case. A general or residential contractor may install asphalt or fiberglass shingles, or wood shingles and shakes, on a new building of his own construction. Work on tile, metal and membrane roofs has to be handled by a certified or registered roofing contractor. In Miami-Dade, the county building office issues the permit, so confirm who is named on it. Many homes in this area are older, since the median year homes were built here is 1957, which means most roofs have been replaced at least once and the contractor named on the permit matters.
Source: Florida Statutes, section 489.113 (2026), read Oct 5, 2026
Which code edition will my new Westwood Lakes roof face?
December 31, 2023 is when the 2023 Eighth Edition took effect. Any permit application or plan set filed on or after December 31, 2026 has to comply with the Ninth Edition. Because Westwood Lakes is unincorporated and Miami-Dade County Regulatory and Economic Resources issues permits, confirm the edition for your submission date with that office.
Source: FRSA, "New 2023 FBC Eighth Edition is Now in Effect", 2024-02-13, read Oct 5, 2026
Nearby
New construction roofing near Westwood Lakes
Sources for this page(30)
- 1.Permit office: Miami-Dade County Regulatory and Economic Resources (RER) - Building & Permits. Miami-Dade County Regulatory and Economic Resources (RER) - Building & Permits. Read Oct 10, 2026.
- 2.Florida Building Commission, 'Setting New Standards for Safety: The Florida Building Code' (2004 publication; wind-speed figures in it are outdated and not used). Read Oct 5, 2026.
- 3.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25035, via Census Reporter API. Read Oct 5, 2026.
- 4.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25024, via Census Reporter API. Read Oct 5, 2026.
- 5.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25034, via Census Reporter API. Read Oct 5, 2026.
- 6.Miami-Dade County RER, Board and Code Administration Division, Product Approval. Read Oct 5, 2026.
- 7.U.S. Census Bureau, Building Permits Survey county annual files (co2025a.txt, co2020a.txt). Read Oct 5, 2026.
- 8.Share of homes built 2010 or later: 0.7%. U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25034, via Census Reporter API. Read Oct 5, 2026.
- 9.Median year homes were built: 1957. U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25035, via Census Reporter API. Read Oct 5, 2026.
- 10.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25035, B25034, B25024, via Census Reporter API. Read Oct 5, 2026.
- 11.FBC-Building 2023 Chapter 2 definitions. Read Oct 5, 2026.
- 12.FRSA, "New 2023 FBC Eighth Edition is Now in Effect", 2024-02-13. Read Oct 5, 2026.
- 13.Miami-Dade County RER notice. Read Oct 5, 2026.
- 14.Florida Statutes, section 553.842 (2026). Read Oct 5, 2026.
- 15.miamidade.gov. Read Oct 5, 2026.
- 16.2023 Florida Building Code, Residential, 8th ed., Chapter 8 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
- 17.2023 Florida Building Code, Residential, 8th ed., Chapter 9 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
- 18.2023 Florida Building Code, Building, 8th ed., Chapter 15 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
- 19.Florida Statutes, section 489.113 (2026). Read Oct 5, 2026.
- 20.2023 Florida Building Code, Building, 8th ed., Chapter 1 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
- 21.2023 Florida Building Code, Residential, 8th ed., Chapter 3 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
- 22.Florida Statutes, section 553.837 (2026). Read Oct 5, 2026.
- 23.Miami-Dade County Regulatory and Economic Resources (RER) - Building & Permits, Miami. Read Oct 5, 2026.
- 24.Florida Statutes, section 713.135 (2026), Florida Legislature. Read Oct 5, 2026.
- 25.Florida Statutes, section 627.7011 (2026), Florida Legislature. Read Oct 5, 2026.
- 26.NOAA National Hurricane Center, Tropical Cyclone Report: Hurricane Irma (AL112017), NOAA National Hurricane Center. Read Oct 5, 2026.
- 27.NOAA National Hurricane Center, Tropical Cyclone Climatology, NOAA National Hurricane Center. Read Oct 5, 2026.
- 28.NOAA NCEI U.S. Climate Normals 1991-2020 (access data service), NOAA National Centers for Environmental Information. Read Oct 5, 2026.
- 29.NOAA Atlas 14 Volume 9 version 2, partial-duration intensity estimates at the Westwood Lakes 2020 Census internal point (25.7247, -80.3693), NOAA Hydrometeorological Design Studies Center. Read Oct 5, 2026.
- 30.NOAA Atlas 14 Volume 9 version 2, partial-duration 24-hour depth estimates at the Westwood Lakes 2020 Census internal point (25.7247, -80.3693), NOAA Hydrometeorological Design Studies Center. Read Oct 5, 2026.