Only 0.9 percent of homes in Westchester were built in 2010 or later, so a new roof here is rare compared with the older housing around it. Where one is going up, the county permit desk and the High-Velocity Hurricane Zone rules apply from the first inspection.
Updated October 2026

Local housing
Why new roofs are uncommon in Westchester
The median home here was built in 1971, and 74.7 percent of units date before 1980. Almost all of the housing is established, so most roofing work is replacement, not new construction.
Countywide, 2,666 single-family units were permitted in 2025, up from 2,133 in 2020. With 63.5 percent of Westchester homes single-family detached, a new house on a cleared or infill lot is the likeliest new roof you will see.
Rules
Code edition, product approval and who may install
Miami-Dade is one of two counties in the High-Velocity Hurricane Zone, and the county building office issues Westchester permits. Plans submitted on or after December 31, 2026 fall under the Ninth Edition of the Florida Building Code, so the filing date matters.
Roofing products must carry approval. Miami-Dade's Product Control Section reviews them, and a Notice of Commencement copy must be on the job site before the first inspection. The roofing permit application lists the approval numbers.
Florida law lets a builder put on asphalt shingles with its own crew only for a house it is building itself. Tile, metal and membrane work is subcontracted to a roofer holding the state roofing credential, and a general contractor cannot advertise as a roofer without it.
Build sequence
Deck, underlayment and the inspection order
Roof sheathing on a new home is nailed with ring shank nails, 2 1/2 inches by 0.131 inch. Before the covering goes on, the dry-in must follow one of three options, such as the full deck under self-adhering underlayment or two layers of felt fastened 12 inches on center in the field.
- Foundation
- Framing
- Sheathing, either with the dry-in or separately
- Exterior wall coverings and soffit
- Roofing: dry-in, insulation, coverings, flashing
- Final
Book the roofing crew against that sequence, not the framing date. A Miami-Dade permit also expires if the roofing crew has not started within 6 months of issue, or if the job sits idle for 6 months.
Questions
New construction roofing in Westchester: questions
Which code edition applies to a new roof permit in Westchester?
It depends on the date the application is submitted. The 2023 edition has been in effect since December 31, 2023. The Ninth Edition becomes effective December 31, 2026, and every application and set of plans submitted on or after that date must meet it. Westchester permits come from Miami-Dade County, which sits in the High-Velocity Hurricane Zone. Confirm your filing date and plan requirements with the county building office before you schedule the roofing crew.
Source: Miami-Dade County Regulatory and Economic Resources (RER) - Building & Permits, read Oct 5, 2026
Does my builder have to cover the roof for a year?
Since July 1, 2025, a builder must warrant a newly constructed home for 1 year against defects in equipment, material or workmanship that result in a material violation of the Florida Building Code. The clock starts at title transfer or first occupancy, whichever is earlier. Wear and tear, settling, owner-caused damage and natural disasters fall outside it. Read your contract and ask the builder how a roof leak is reported.
Source: Florida Statutes, section 553.837 (2026), read Oct 5, 2026
Do new homes in Westchester need gutters?
Under the residential code, gutters with downspouts are required on buildings with eaves projecting less than 6 inches, except at gable end rakes or on a roof above another roof. Each downspout must empty at least 1 foot out from the wall. Many Westchester homes are single-family detached, 63.5 percent by the Census figure, so check your plans for eave depth early.
Source: U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25024, via Census Reporter API, read Oct 5, 2026
Who checks that roofing products are acceptable in Miami-Dade?
Miami-Dade's Product Control Section reviews and approves or denies roofing products and systems, and certifies the labs that test them. The roofing permit application carries the approval numbers, and a copy of the Notice of Acceptance must be available at the job site when the Building Official asks. Ask your roofer for those numbers before you sign.
Source: Miami-Dade County RER, Board and Code Administration Division, Product Approval, read Oct 5, 2026
Nearby
New construction roofing near Westchester
Sources for this page(32)
- 1.Median year homes were built: 1971. U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25035, via Census Reporter API. Read Oct 5, 2026.
- 2.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25034, via Census Reporter API. Read Oct 5, 2026.
- 3.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25035, via Census Reporter API. Read Oct 5, 2026.
- 4.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25035, B25034, B25024, via Census Reporter API. Read Oct 5, 2026.
- 5.U.S. Census Bureau, Building Permits Survey county annual files (co2025a.txt, co2020a.txt). Read Oct 5, 2026.
- 6.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25024, via Census Reporter API. Read Oct 5, 2026.
- 7.Florida Building Commission, 'Setting New Standards for Safety: The Florida Building Code' (2004 publication; wind-speed figures in it are outdated and not used). Read Oct 5, 2026.
- 8.Permit office: Miami-Dade County Regulatory and Economic Resources (RER) - Building & Permits. Miami-Dade County Regulatory and Economic Resources (RER) - Building & Permits. Read Oct 10, 2026.
- 9.Miami-Dade County RER, Board and Code Administration Division, Product Approval. Read Oct 5, 2026.
- 10.Share of homes built 2010 or later: 0.9%. U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25034, via Census Reporter API. Read Oct 5, 2026.
- 11.Miami-Dade County RER notice. Read Oct 5, 2026.
- 12.FBC-Building 2023 Chapter 2 definitions. Read Oct 5, 2026.
- 13.Florida Statutes, section 553.842 (2026). Read Oct 5, 2026.
- 14.Florida Statutes, section 489.113 (2026). Read Oct 5, 2026.
- 15.2023 Florida Building Code, Residential, 8th ed., Chapter 8 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
- 16.2023 Florida Building Code, Residential, 8th ed., Chapter 9 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
- 17.2023 Florida Building Code, Building, 8th ed., Chapter 1 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
- 18.FRSA, "New 2023 FBC Eighth Edition is Now in Effect", 2024-02-13. Read Oct 5, 2026.
- 19.Florida Statutes, section 553.837 (2026). Read Oct 5, 2026.
- 20.2023 Florida Building Code, Residential, 8th ed., Chapter 3 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
- 21.2023 Florida Building Code, Residential, 8th ed., R318.5 (UpCodes viewer, unofficial transcription); FBC-Building 1503.7. Read Oct 5, 2026.
- 22.miamidade.gov. Read Oct 5, 2026.
- 23.Miami-Dade County Regulatory and Economic Resources (RER) - Building & Permits, Miami. Read Oct 5, 2026.
- 24.Florida Statutes, section 713.135 (2026), Florida Legislature. Read Oct 5, 2026.
- 25.Florida Statutes, section 627.7011 (2026), Florida Legislature. Read Oct 4, 2026.
- 26.2023 Florida Building Code, Building, 8th ed., Chapter 15 (UpCodes viewer, unofficial transcription), UpCodes (Florida Building Code transcription). Read Oct 5, 2026.
- 27.NOAA NCEI U.S. Climate Normals 1991-2020 (access data service), NOAA National Centers for Environmental Information. Read Oct 5, 2026.
- 28.NOAA NCEI U.S. Climate Normals 1991-2020 (access data service), NOAA National Centers for Environmental Information. Read Oct 5, 2026.
- 29.NOAA National Hurricane Center, Tropical Cyclone Climatology, NOAA National Hurricane Center. Read Oct 5, 2026.
- 30.NOAA National Hurricane Center, Tropical Cyclone Report: Hurricane Irma (AL112017), NOAA National Hurricane Center. Read Oct 5, 2026.
- 31.NOAA National Hurricane Center, Tropical Cyclone Report: Hurricane Dorian (AL052019), NOAA National Hurricane Center. Read Oct 5, 2026.
- 32.NOAA Atlas 14 Volume 9 version 2, partial-duration 24-hour depth estimates at the Westchester 2020 Census internal point (25.7454, -80.3535), NOAA Hydrometeorological Design Studies Center. Read Oct 5, 2026.
South Fork Roofing
New construction roofing in Westchester
Answer a few questions about the job, or call.