Skip to content

New construction · Wellington

New construction roofing in Wellington, FL

Only 9 percent of Wellington homes were built in 2010 or later, so a brand-new roof here is still the exception. The median home dates to 1995, newer than the Palm Beach County figure of 1986. Permit applications filed on or after December 31, 2026 fall under the Ninth Edition code.

Updated October 2026

Outdoor amphitheater stage with a green lawn, palm trees and blue sky with clouds.
A roof deck sheathed in red-brown ZIP System panels with black seam tape, a bucket and a ladder on the deck, homes and a street behind.Our work
Photo: Amphitheater Wellington, Florida front by Dee.lite, CC BY-SA 4.0, cropped

Wellington figures this page uses

Median year homes were built
1995
Share of homes built 2010 or later
9%
People (2020 Census)
61,637

Code and permits

Code edition for a new Wellington roof permit

December 31, 2023 was the effective date of the 2023 Florida Building Code, Eighth Edition. The Ninth Edition governs every permit application and plan set submitted on or after December 31, 2026. When your builder files close to that date, ask which edition the plans follow.

Wellington is in Palm Beach County, which is not in the High Velocity Hurricane Zone. That zone covers Miami-Dade and Broward only. Your roof follows the standard Florida Building Code, and roof permits come from the Village of Wellington Building office. Palm Beach County's Self-Issued Reroof Application applies to qualifying reroofs, not to new homes.

Statewide product approval is mandatory for roofing as a category. The permit should carry approval numbers for the roofing products. You can look them up by FL number or manufacturer in the Florida Building Commission search.

What gets built

A new roof is built up from the deck, the underlayment and the drip edge

Roof sheathing on a new home must be fastened with ring shank nails, 2 1/2 inches long by 0.131 inch. After that, the roof has to be dried in using one of three methods. One is a full cover of self-adhering membrane. Another is membrane or tape over every deck joint plus approved underlayment. The third is two layers of felt-type underlayment with set fastener spacing.

Along the eaves and gables, shingle drip edge is laid over the underlayment. Nails run at most 12 inches apart, or 4 inches apart where wind speed or roof height crosses the code limit. Tile on a new home needs solid sheathing and must follow the manufacturer's instructions or the FRSA/TRI manual.

Inspections and builder duties

Scheduling the roof with your Wellington build

Sheathing gets its own inspection before the roof covering goes on, so roofers cannot close up the deck until it passes. Palm Beach County permitted 2,495 single-family units in 2025, against 4,244 in 2020. Ask your builder how far out the roofing crew is booked, and when the Village of Wellington Building office will see the dry-in.

Unless a general contractor holds a roofing certificate or registration, the roofing work has to be subcontracted out. The exception is asphalt or fiberglass shingles on its own new building. Tile, metal and membrane jobs fall to a roofing contractor. Wellington's median 1995 build year says little about your new roof, so confirm who is installing it.

Where the eaves project less than 6 inches, the roof needs gutters with downspouts. Water from the downspouts has to land at least 1 foot away from the sidewall.

Questions

New construction roofing in Wellington: questions

What did Hurricane Milton's tornado do in Wellington?

Hurricane Milton's tornado on October 9, 2024 left EF-3 damage in the Rustic Ranches section of Wellington. It caused EF-1 to EF-2 damage to homes and trees in Lakefield West, Meadowwood and Binks Forest. For a new roof, that history is a reason to ask your builder how the deck is fastened and which underlayment option is used. Confirm the specifics with the Village of Wellington Building office.

Source: NWS Miami, 'Hurricane Milton' StoryMap (Oct 9, 2024 tornado outbreak; preliminary data), read Oct 5, 2026

Related: New construction roofing

Is a new Wellington home covered if the roof has a defect?

Since July 1, 2025, Florida Statute 553.837 requires a builder to warrant a newly constructed home for 1 year against defects in equipment, material or workmanship that cause a material Florida Building Code violation. Exclusions cover normal wear and tear, settling, defects the owner caused and acts of God such as a natural disaster. Whichever happens first, title transfer or first occupancy, starts the one-year clock. Read your purchase contract for details.

Source: Florida Statutes, section 553.837 (2026), read Oct 5, 2026

Related: New construction roofing

Can I use a private inspector on my Wellington new build?

Yes. Under Florida Statute 553.791(2)(a), the owner, or the owner's contractor with written authorization, may choose a private provider for plans review or code inspection at any time. Someone qualifies as a private provider if they are a licensed building code administrator, engineer or architect. Ask the Village of Wellington Building office how it handles private provider paperwork for roofing inspections.

Source: Florida Statutes, section 553.791 (2026), read Oct 5, 2026

Related: New construction roofing

Do I need a Notice of Commencement for a new roof in Wellington?

The Florida Building Code requires the permit card to warn you that skipping a recorded Notice of Commencement may mean paying twice for the improvements. Before the first inspection, the notice has to be both recorded and posted at the job site. Wellington is a village of 61,637 people, but the rule is statewide. Check the amount threshold with the Village of Wellington Building office.

Source: Florida Statutes, section 713.135 (2026), read Oct 5, 2026

Related: New construction roofing

Nearby

New construction roofing near Wellington

Sources for this page(40)
  1. 1.Florida Building Commission, 'Setting New Standards for Safety: The Florida Building Code' (2004 publication; wind-speed figures in it are outdated and not used). Read Oct 5, 2026.
  2. 2.Permit office: Village of Wellington - Building. Village of Wellington - Building. Read Oct 10, 2026.
  3. 3.Palm Beach County PZB - Building Division, Self-Issued Reroof Applications. Read Oct 5, 2026.
  4. 4.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25035, via Census Reporter API. Read Oct 5, 2026.
  5. 5.Hurricane Matthew (2016). NOAA National Hurricane Center, Tropical Cyclone Report: Hurricane Matthew (AL142016). Read Oct 5, 2026.
  6. 6.U.S. Census Bureau, Building Permits Survey county annual files (co2025a.txt, co2020a.txt). Read Oct 5, 2026.
  7. 7.Median year homes were built: 1995. U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25035, via Census Reporter API. Read Oct 5, 2026.
  8. 8.Share of homes built 2010 or later: 9%. U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25034, via Census Reporter API. Read Oct 5, 2026.
  9. 9.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25035, B25034, B25024, via Census Reporter API. Read Oct 5, 2026.
  10. 10.NWS Miami, 'Hurricane Milton' StoryMap (Oct 9, 2024 tornado outbreak; preliminary data). Read Oct 5, 2026.
  11. 11.People (2020 Census): 61,637. U.S. Census Bureau, 2020 Census counts (POP100, HU100) via TIGERweb tigerWMS_Census2020 layer 26 (Incorporated Places). Read Oct 5, 2026.
  12. 12.FRSA, "New 2023 FBC Eighth Edition is Now in Effect", 2024-02-13. Read Oct 5, 2026.
  13. 13.Miami-Dade County RER notice. Read Oct 5, 2026.
  14. 14.FBC-Building 2023 Chapter 2 definitions. Read Oct 5, 2026.
  15. 15.Florida Statutes, section 553.842 (2026). Read Oct 5, 2026.
  16. 16.Florida Building Commission. Read Oct 5, 2026.
  17. 17.2023 Florida Building Code, Residential, 8th ed., Chapter 8 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
  18. 18.2023 Florida Building Code, Residential, 8th ed., Chapter 9 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
  19. 19.2023 Florida Building Code, Building, 8th ed., Chapter 1 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
  20. 20.Florida Statutes, section 489.113 (2026). Read Oct 5, 2026.
  21. 21.2023 Florida Building Code, Residential, 8th ed., Chapter 3 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
  22. 22.Florida Statutes, section 553.837 (2026). Read Oct 5, 2026.
  23. 23.Florida Statutes, section 553.791 (2026). Read Oct 5, 2026.
  24. 24.Village of Wellington - Building, Village of Wellington. Read Oct 5, 2026.
  25. 25.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25034, via Census Reporter API, U.S. Census Bureau (via Census Reporter). Read Oct 5, 2026.
  26. 26.NOAA National Hurricane Center, Tropical Cyclone Report: Hurricane Matthew (AL142016), NOAA National Hurricane Center. Read Oct 5, 2026.
  27. 27.Florida Statutes, section 713.135 (2026), Florida Legislature. Read Oct 5, 2026.
  28. 28.U.S. Census Bureau, 2020 Census counts (POP100, HU100) via TIGERweb tigerWMS_Census2020 layer 26 (Incorporated Places), U.S. Census Bureau. Read Oct 5, 2026.
  29. 29.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25004, via Census Reporter API, U.S. Census Bureau (via Census Reporter). Read Oct 5, 2026.
  30. 30.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25004, B01001, via Census Reporter API, U.S. Census Bureau (via Census Reporter). Read Oct 5, 2026.
  31. 31.Wikipedia, 'List of municipalities in Florida', Wikipedia. Read Oct 5, 2026.
  32. 32.NOAA National Hurricane Center, Tropical Cyclone Report: Hurricane Dorian (AL052019), NOAA National Hurricane Center. Read Oct 5, 2026.
  33. 33.Citizens Property Insurance Corporation, inspections FAQ (updated 2026-03-17), Citizens Property Insurance. Read Oct 4, 2026.
  34. 34.2023 Florida Building Code, Building, 8th ed., Chapter 15 (UpCodes viewer, unofficial transcription), UpCodes (Florida Building Code transcription). Read Oct 5, 2026.
  35. 35.NOAA NCEI U.S. Climate Normals 1991-2020 (access data service), NOAA National Centers for Environmental Information. Read Oct 5, 2026.
  36. 36.NOAA Atlas 14 Volume 9 version 2, partial-duration intensity estimates at the Wellington 2020 Census internal point (26.6490, -80.2672), NOAA Hydrometeorological Design Studies Center. Read Oct 5, 2026.
  37. 37.NOAA NCEI U.S. Climate Normals 1991-2020 (access data service), NOAA National Centers for Environmental Information. Read Oct 5, 2026.
  38. 38.NOAA National Hurricane Center, Tropical Cyclone Climatology, NOAA National Hurricane Center. Read Oct 5, 2026.
  39. 39.Wikipedia, 'Wellington, Florida' (revision 1359249503), Wikipedia. Read Oct 5, 2026.
  40. 40.Fla. Stat. 489.105(3)(e), Florida Legislature. Read Oct 5, 2026.

South Fork Roofing

New construction roofing in Wellington

Answer a few questions about the job, or call.

CallFree estimate