New construction · Loxahatchee Groves
New construction roofing in Loxahatchee Groves, FL
In Loxahatchee Groves, 11.8 percent of homes were built in 2010 or later, so a new roof here is still the exception. The median home dates to 1987. If you are building, the code edition in force on the day you file your permit sets your roof rules.
Updated October 2026

Code edition
Which code edition governs a permit for a new roof
Permits for a new home in the town go through the Town of Loxahatchee Groves permit office. The 2023 Florida Building Code, Eighth Edition, governs any application filed before December 31, 2026. Any application filed on or after that date has to meet the Ninth Edition instead. Filing date decides it, not the day you start framing.
Only Broward and Miami-Dade fall inside the High-Velocity Hurricane Zone, which leaves Palm Beach County outside it. So the Miami-Dade Notice of Acceptance system does not govern your roof here. Roofing products still need Florida statewide product approval, and the number belongs on your permit application. You can look it up on the Florida Building Commission product approval search.
Permits also run on clocks. Work must start within 6 months of issuance, and a permit lapses if work is suspended for 6 months. Record the Notice of Commencement before your first inspection, or you may end up paying twice for the improvements.
Roof build-up
What goes on the deck of a new house: sheathing, underlayment and drip edge
On a new home, the roof sheathing is fastened with ring shank nails that run 2 1/2 inches long. Inspectors check the nails before anything covers the deck. In a town where 92.2 percent of homes are single-family detached, most new roofs are simple residential decks, so the nailing pattern is where most failed inspections start.
- The first option is to cover the entire deck with a self-adhering, polymer-modified bitumen underlayment.
- Option two: tape or membrane at least 3 3/4 inches wide over every deck joint, then an approved underlayment over the roof.
- Two layers of felt-type underlayment make up the third option, nailed 12 inches apart across the field and 6 inches apart along the laps.
Metal drip edge sits on top of the underlayment where the roof meets the eave and the gable end. Nail it 12 inches apart, or 4 inches apart where design wind speed is 110 mph or more or the roof is taller than 33 feet. Eaves under 6 inches wide also need gutters with downspouts, and the downspouts must empty 1 foot from the wall.
Inspections and crews
Scheduling the roof with the build
Inspections are listed in this order in the code: foundation, framing, sheathing, exterior walls and soffit, roofing, and finally the final. Your roofer should be ready to dry in as soon as the sheathing inspection passes. A rural lot with canal-side access roads, like those the Water Control District maintains, may need delivery planned around the road.
Who installs matters. Putting on asphalt shingles is something a builder may do itself only when the building is a new one it constructed. Tile, metal and membrane work has to be handled by a certified or registered roofing contractor. You may also choose a private provider for plan review or inspections, with written authorization from the owner.
Questions
New construction roofing in Loxahatchee Groves: questions
Which Florida Building Code edition will my Loxahatchee Groves roof permit use?
It depends on the filing date. December 31, 2023 was the date the 2023 Eighth Edition came into effect. The Ninth (2026) Edition takes effect December 31, 2026, and every application or plan submitted on or after that date must comply with it. Many of the town's homes date to a median of 1987, but a new build is judged by the edition in force when you file. Confirm timing with the Town of Loxahatchee Groves permit office.
Source: U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25035, via Census Reporter API, read Oct 5, 2026
Does my builder have to cover the new roof for a year?
Since July 1, 2025, Florida law has required a builder to stand behind a new home for 1 year. The duty covers construction defects that create a material Florida Building Code violation. Ordinary wear, settling, defects the owner caused and natural disasters fall outside coverage. If you build on one of the town's rural lots, read your contract and ask your builder how the rule applies to the roof.
Source: Florida Statutes, section 553.837 (2026), read Oct 5, 2026
What is the 25% roof rule if I add a roof section later?
Unless you replace the whole section, no more than 25 percent of a roof section can be repaired or replaced within any 12-month period. The exception: a roof built or replaced under the 2007 Florida Building Code or later only needs the repaired part to meet current code. A roof built new in Loxahatchee Groves today should fall under that exception, since the 2023 code is later than 2007.
Source: 2023 Florida Building Code, Building, 8th ed., Chapter 15 (UpCodes viewer, unofficial transcription), read Oct 5, 2026
Do I need product approval numbers for roofing in Palm Beach County?
Yes. Florida requires statewide product approval for roofing, and the approval number goes on your permit paperwork. Palm Beach County is not in the High-Velocity Hurricane Zone, so you will not use a Miami-Dade Notice of Acceptance. Look up any product by its FL number on the Florida Building Commission search, and ask the Town of Loxahatchee Groves permit office what it wants on the application.
Source: Florida Building Commission, 'Setting New Standards for Safety: The Florida Building Code' (2004 publication; wind-speed figures in it are outdated and not used), read Oct 5, 2026
Sources for this page(35)
- 1.Permit office: Town of Loxahatchee Groves - Permits Requirements & Applications. Town of Loxahatchee Groves - Permits Requirements & Applications. Read Oct 10, 2026.
- 2.NWS Miami, 'Hurricane Milton' StoryMap (Oct 9, 2024 tornado outbreak; preliminary data). Read Oct 5, 2026.
- 3.Florida Building Commission, 'Setting New Standards for Safety: The Florida Building Code' (2004 publication; wind-speed figures in it are outdated and not used). Read Oct 5, 2026.
- 4.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25035, via Census Reporter API. Read Oct 5, 2026.
- 5.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25024, via Census Reporter API. Read Oct 5, 2026.
- 6.Hurricane Matthew (2016). NOAA National Hurricane Center, Tropical Cyclone Report: Hurricane Matthew (AL142016). Read Oct 5, 2026.
- 7.Wikipedia, 'Loxahatchee Groves, Florida' (revision 1376667548). Read Oct 5, 2026.
- 8.Share of homes built 2010 or later: 11.8%. U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25034, via Census Reporter API. Read Oct 5, 2026.
- 9.Median year homes were built: 1987. U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25035, via Census Reporter API. Read Oct 5, 2026.
- 10.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25035, B25034, B25024, via Census Reporter API. Read Oct 5, 2026.
- 11.U.S. Census Bureau, Building Permits Survey county annual files (co2025a.txt, co2020a.txt). Read Oct 5, 2026.
- 12.FRSA, "New 2023 FBC Eighth Edition is Now in Effect", 2024-02-13. Read Oct 5, 2026.
- 13.Miami-Dade County RER notice. Read Oct 5, 2026.
- 14.FBC-Building 2023 Chapter 2 definitions. Read Oct 5, 2026.
- 15.Florida Statutes, section 553.842 (2026). Read Oct 5, 2026.
- 16.Florida Building Commission. Read Oct 5, 2026.
- 17.2023 Florida Building Code, Building, 8th ed., Chapter 1 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
- 18.2023 Florida Building Code, Residential, 8th ed., Chapter 8 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
- 19.2023 Florida Building Code, Residential, 8th ed., Chapter 9 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
- 20.2023 Florida Building Code, Residential, 8th ed., Chapter 3 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
- 21.Florida Statutes, section 489.113 (2026). Read Oct 5, 2026.
- 22.Florida Statutes, section 553.791 (2026). Read Oct 5, 2026.
- 23.Florida Statutes, section 553.837 (2026). Read Oct 5, 2026.
- 24.2023 Florida Building Code, Building, 8th ed., Chapter 15 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
- 25.Town of Loxahatchee Groves - Permits Requirements & Applications, Town of Loxahatchee Groves. Read Oct 5, 2026.
- 26.NOAA National Hurricane Center, Tropical Cyclone Report: Hurricane Matthew (AL142016), NOAA National Hurricane Center. Read Oct 5, 2026.
- 27.Florida Statutes, section 713.135 (2026), Florida Legislature. Read Oct 5, 2026.
- 28.NOAA National Hurricane Center, Tropical Cyclone Report: Hurricane Dorian (AL052019), NOAA National Hurricane Center. Read Oct 5, 2026.
- 29.Florida Statutes, section 627.7011 (2026), Florida Legislature. Read Oct 4, 2026.
- 30.Fla. Stat. 489.105(3)(e), Florida Legislature. Read Oct 5, 2026.
- 31.NOAA National Hurricane Center, Tropical Cyclone Climatology, NOAA National Hurricane Center. Read Oct 5, 2026.
- 32.NOAA NCEI U.S. Climate Normals 1991-2020 (access data service), NOAA National Centers for Environmental Information. Read Oct 5, 2026.
- 33.NOAA NCEI U.S. Climate Normals 1991-2020 (access data service), NOAA National Centers for Environmental Information. Read Oct 5, 2026.
- 34.NOAA Atlas 14 Volume 9 version 2, partial-duration intensity estimates at the Loxahatchee Groves 2020 Census internal point (26.7210, -80.2772), NOAA Hydrometeorological Design Studies Center. Read Oct 5, 2026.
- 35.Wikipedia, 'List of municipalities in Florida', Wikipedia. Read Oct 5, 2026.
South Fork Roofing
New construction roofing in Loxahatchee Groves
Answer a few questions about the job, or call.