New construction · Westlake
New construction roofing in Westlake, FL
In Westlake, 96.9 percent of homes were built in 2010 or later, so most roofing work here is on new houses, not old ones. A new roof follows the code edition in force when the permit is filed, and the City of Westlake Building Department handles that permit.
Updated October 2026

Code edition
The code edition that governs a new roof in Westlake depends on which one the local building department has adopted
Westlake was incorporated on June 22, 2016, on former farmland, and the median home dates to 2021. Builders here have worked under recent codes since the first lots opened. Any application filed on or after December 31, 2026 falls under the Ninth Edition, while earlier filings stay with the Eighth.
The High Velocity Hurricane Zone rules apply to Broward and Miami-Dade, so a new roof in Westlake does not need the Miami-Dade product notice. It does need statewide product approval. The Florida Building Commission search tool lets you look up any roofing product by its FL number.
Roof build
On a new roof, the deck, the underlayment and the drip edge each have to be installed correctly
With 94.1 percent of Westlake housing units being single-family detached homes, most new roofs are shingle, tile or metal over wood sheathing. The deck is nailed with ring shank nails, and the code names a 2 1/2 inch by 0.131 inch nail for most sheathing.
- Dry-in option one: the whole deck covered in self-adhering polymer-modified bitumen underlayment.
- Dry-in option two: a strip at least 3 3/4 inches wide over every deck joint, then an underlayment over the whole roof.
- Dry-in option three: two layers of felt-type underlayment, fastened 12 inches apart in the field and 6 inches apart at laps.
At eaves and gables, the underlayment sits beneath the drip edge, so the drip edge is laid on top. Its fasteners sit no more than 12 inches apart, or 4 inches apart where design wind speed is 110 mph or more. Tile must follow the manufacturer's instructions or the Florida High Wind tile manual, and goes only over solid sheathing.
Permits and inspections
Scheduling the roof around inspections
Census data list 585 new single-family homes permitted in Westlake in 2025, though the file covers 10 months, so some of that count is imputed. At that pace, inspections stack up. The code order runs foundation, framing, sheathing, exterior walls, roofing, then final. Inspectors check three things on a roof: the dry-in, the roof coverings and the flashing.
The Westlake Building Department issues the permit. Palm Beach County also offers a Self-Issued Reroof Application for qualifying reroofs, but that is a reroof tool, not a new-build one. Confirm with the Building Department which route fits your lot. Once a permit is issued, you have 6 months to begin work before it lapses.
Asphalt shingles on a builder's own new building can be installed by the builder itself. For tile, metal and membrane roofing, the work goes to a certified or registered roofing contractor. An owner may also use a private provider for plan review or inspections, with written authorization.
Questions
New construction roofing in Westlake: questions
Which code edition applies to a new roof permit in Westlake?
It depends on the filing date. Permit applications and plans submitted on or after December 31, 2026 must meet the Ninth (2026) Edition of the Florida Building Code. Applications filed before that date fall under the Eighth Edition, in force since the end of 2023. In a town where the median home was built in 2021, most current roofs were permitted under earlier editions. Ask the City of Westlake Building Department which edition your application date triggers.
Source: U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25035, via Census Reporter API, read Oct 5, 2026
Does a new Westlake home need a Miami-Dade product notice for its roof?
No. Palm Beach County is not in the High Velocity Hurricane Zone, which covers Broward and Miami-Dade only. Roofing products must still carry Florida statewide product approval. You can search the Florida Building Commission database by FL number, manufacturer or code version. Check that the approval matches the product on your permit before work starts.
Source: Florida Building Commission, 'Setting New Standards for Safety: The Florida Building Code' (2004 publication; wind-speed figures in it are outdated and not used), read Oct 5, 2026
Can the builder install my new roof, or must a roofer do it?
A general, building or residential contractor may install asphalt or fiberglass shingles itself only on a new building of its own construction. Anyone installing a tile, metal or membrane roof must hold a certified or registered roofing contractor status to do the work. In this area the median home was built in 2021, so many roofs are still new, and builders working on fresh construction are the main ones who fall under that exception. Without that license, a general contractor is also barred from advertising as a roofer. Ask who is on the permit for the roof.
Source: U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25024, via Census Reporter API, read Oct 5, 2026
What does the builder owe me if my new roof leaks in the first year?
Since July 1, 2025, Florida law requires a builder to warrant a newly built home for 1 year against defects in equipment, material or workmanship that cause a material violation of the Florida Building Code. Whichever happens first, title transfer or first occupancy, starts the clock on that year. Excluded from coverage are natural disasters, settling, normal wear and defects the owner caused. Check your purchase contract, then put your question to the builder in writing.
Source: U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25034, via Census Reporter API, read Oct 5, 2026
Sources for this page(35)
- 1.Wikipedia, 'Westlake, Florida' (revision 1378236053). Read Oct 5, 2026.
- 2.Median year homes were built: 2021. U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25035, via Census Reporter API. Read Oct 5, 2026.
- 3.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25035, via Census Reporter API. Read Oct 5, 2026.
- 4.Hurricane Matthew (2016). NOAA National Hurricane Center, Tropical Cyclone Report: Hurricane Matthew (AL142016). Read Oct 5, 2026.
- 5.Florida Building Commission, 'Setting New Standards for Safety: The Florida Building Code' (2004 publication; wind-speed figures in it are outdated and not used). Read Oct 5, 2026.
- 6.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25024, via Census Reporter API. Read Oct 5, 2026.
- 7.U.S. Census Bureau, Building Permits Survey, 2025 annual place file (so2025a.txt). Read Oct 5, 2026.
- 8.U.S. Census Bureau, Building Permits Survey county annual files (co2025a.txt, co2020a.txt). Read Oct 5, 2026.
- 9.Permit office: City of Westlake - Building Department. City of Westlake - Building Department. Read Oct 10, 2026.
- 10.Palm Beach County PZB - Building Division, Self-Issued Reroof Applications. Read Oct 5, 2026.
- 11.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25034, via Census Reporter API. Read Oct 5, 2026.
- 12.Share of homes built 2010 or later: 96.9%. U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25034, via Census Reporter API. Read Oct 5, 2026.
- 13.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25035, B25034, B25024, via Census Reporter API. Read Oct 5, 2026.
- 14.FRSA, "New 2023 FBC Eighth Edition is Now in Effect", 2024-02-13. Read Oct 5, 2026.
- 15.Miami-Dade County RER notice. Read Oct 5, 2026.
- 16.FBC-Building 2023 Chapter 2 definitions. Read Oct 5, 2026.
- 17.Florida Statutes, section 553.842 (2026). Read Oct 5, 2026.
- 18.Florida Building Commission. Read Oct 5, 2026.
- 19.2023 Florida Building Code, Residential, 8th ed., Chapter 8 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
- 20.2023 Florida Building Code, Residential, 8th ed., Chapter 9 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
- 21.2023 Florida Building Code, Building, 8th ed., Chapter 1 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
- 22.Florida Statutes, section 489.113 (2026). Read Oct 5, 2026.
- 23.Florida Statutes, section 553.791 (2026). Read Oct 5, 2026.
- 24.Florida Statutes, section 553.837 (2026). Read Oct 5, 2026.
- 25.NOAA National Hurricane Center, Tropical Cyclone Report: Hurricane Matthew (AL142016), NOAA National Hurricane Center. Read Oct 5, 2026.
- 26.City of Westlake - Building Department, westlakegov.com. Read Oct 5, 2026.
- 27.Wikipedia, 'List of municipalities in Florida', Wikipedia. Read Oct 5, 2026.
- 28.NOAA National Hurricane Center, Tropical Cyclone Report: Hurricane Dorian (AL052019), NOAA National Hurricane Center. Read Oct 5, 2026.
- 29.Florida Statutes, section 627.7011 (2026), Florida Legislature. Read Oct 4, 2026.
- 30.2023 Florida Building Code, Building, 8th ed., Chapter 15 (UpCodes viewer, unofficial transcription), UpCodes (Florida Building Code transcription). Read Oct 5, 2026.
- 31.Florida Statutes, section 713.135 (2026), Florida Legislature. Read Oct 5, 2026.
- 32.NOAA National Hurricane Center, Tropical Cyclone Climatology, NOAA National Hurricane Center. Read Oct 5, 2026.
- 33.NOAA National Hurricane Center, Tropical Cyclone Report: Hurricane Irma (AL112017), NOAA National Hurricane Center. Read Oct 5, 2026.
- 34.NOAA NCEI U.S. Climate Normals 1991-2020 (access data service), NOAA National Centers for Environmental Information. Read Oct 5, 2026.
- 35.NOAA Atlas 14 Volume 9 version 2, partial-duration 24-hour depth estimates at the Westlake 2020 Census internal point (26.7547, -80.2986), NOAA Hydrometeorological Design Studies Center. Read Oct 5, 2026.
South Fork Roofing
New construction roofing in Westlake
Answer a few questions about the job, or call.