New construction roofing in Lantana, FL

Only 12.4 percent of Lantana's homes were built in 2010 or later, according to the Census Bureau. By our arithmetic, that leaves about 88 percent of the housing older than that, with a median build year of 1975. A new roof on a new Lantana build follows today's code edition, deck rules and inspection order.

Updated October 2026

A roof deck sheathed in red-brown ZIP System panels with black seam tape, a bucket and a ladder on the deck, homes and a street behind.

Code edition

Which code edition a Lantana roof permit follows

Lantana permits filed now fall under the Eighth Edition, which took hold at the close of 2023. The Ninth Edition only reaches applications filed at the end of 2026. Check your filing date with the Town of Lantana building permits office before the paperwork goes in.

Palm Beach County sits outside the High Velocity Hurricane Zone, which takes in only Miami-Dade and Broward. The HVHZ low-slope rules, such as the 1/4:12 minimum deck slope, therefore do not apply to a Lantana roof by default. Confirm the zone with the building office before you order materials.

Dry-in details

Sheathing nails, dry-in and drip edge on a Lantana build

Roof sheathing must be fastened with ASTM F1667 RSRS-03 ring shank nails, with RSRS-01 or RSRS-04 allowed where sheathing is 15/32 inch or thinner. Your roofer should be able to show the nail type on the job before the sheathing inspection.

Dry-in has three code paths for a shingle or metal roof. Some crews lay a self-adhering membrane across the entire roof deck. Another tapes every deck joint with a 3 3/4-inch strip and then adds approved underlayment. The third uses two layers of felt-type underlayment, nailed with cap nails at set spacing.

Drip edge goes at eaves and gables, fastened no more than 12 inches on center. In areas with design wind speeds of 110 mph or more, or mean roof heights above 33 feet, the spacing tightens to 4 inches. Ask which applies to your home before framing begins.

Inspection order

Scheduling the roof with Lantana inspections

The code lists the inspections in order: foundation, framing, sheathing or dry-in, exterior wall coverings, roofing, and final. The sheathing inspection can be done with the dry-in or separately once all roof sheathing and fasteners are complete. Do not cover the deck before the sheathing inspection passes.

Mind the clock once the Lantana permit is issued. Florida's code voids a permit when work has not started within 6 months, or when work stops for 6 months. A permit that has received an approved inspection within 180 days counts as active.

Questions

New construction roofing in Lantana: questions

Do new Lantana roofs have to meet the 2026 code?

Only if the permit application is submitted at or after the end of 2026. The Ninth Edition applies to applications filed on or after that date. A roof permitted before then falls under the Eighth Edition, so check your filing date with the Town of Lantana building permits office.

Source: Miami-Dade County RER notice, read Oct 5, 2026

Related: New construction roofing

Is Lantana in the High Velocity Hurricane Zone?

No. Palm Beach County sits outside the High Velocity Hurricane Zone, which takes in only Miami-Dade and Broward. The HVHZ low-slope rules do not apply to a Lantana roof by default, but confirm the zone with the building office.

Source: Florida Building Commission, 'Setting New Standards for Safety: The Florida Building Code' (2004 publication; wind-speed figures in it are outdated and not used), read Oct 5, 2026

Related: New construction roofing

Who can install a new roof on a Lantana home I am building?

Under Florida law, a builder may install asphalt shingles on its own new Lantana building. Tile, metal and membrane work goes to a roofing contractor certified or registered for that trade. Palm Beach County's Building Division also issues permits for these jobs, so ask your builder for the roofing license number.

Source: Florida Statutes, section 489.113 (2026), read Oct 5, 2026

Related: New construction roofing

Where is the approval number for my Lantana roofing product?

Ask your roofer for the Florida product approval number for each roofing product, since statewide approval is mandatory for roofing. It goes on the permit paperwork at the Town of Lantana building office. Your roofer can look it up on the state commission's database, which covers code versions 2001 through 2023.

Source: Florida Building Commission, read Oct 5, 2026

Related: New construction roofing

Sources for this page(29)
  1. 1.Permit office: Town of Lantana - Building Permits. Town of Lantana - Building Permits. Read Oct 10, 2026.
  2. 2.Florida Building Commission, 'Setting New Standards for Safety: The Florida Building Code' (2004 publication; wind-speed figures in it are outdated and not used). Read Oct 5, 2026.
  3. 3.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25035, via Census Reporter API. Read Oct 5, 2026.
  4. 4.Hurricane Matthew (2016). NOAA National Hurricane Center, Tropical Cyclone Report: Hurricane Matthew (AL142016). Read Oct 5, 2026.
  5. 5.Share of homes built 2010 or later: 12.4%. U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25034, via Census Reporter API. Read Oct 5, 2026.
  6. 6.Median year homes were built: 1975. U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25035, via Census Reporter API. Read Oct 5, 2026.
  7. 7.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25035, B25034, B25024, via Census Reporter API. Read Oct 5, 2026.
  8. 8.Palm Beach County PZB - Building Division, Self-Issued Reroof Applications. Read Oct 5, 2026.
  9. 9.FRSA, "New 2023 FBC Eighth Edition is Now in Effect", 2024-02-13. Read Oct 5, 2026.
  10. 10.Miami-Dade County RER notice. Read Oct 5, 2026.
  11. 11.FBC-Building 2023 Chapter 2 definitions. Read Oct 5, 2026. FBC text read from UpCodes (unofficial transcription): check floridabuilding.org or the ICC viewer before quoting (spec 8.7).
  12. 12.2023 Florida Building Code, Building, 8th ed., Chapter 15 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026. FBC text read from UpCodes (unofficial transcription): check floridabuilding.org or the ICC viewer before quoting (spec 8.7). Source URL inherited from C-14 (the research cites it "as C-14").
  13. 13.2023 Florida Building Code, Residential, 8th ed., Chapter 8 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026. FBC text read from UpCodes (unofficial transcription): check floridabuilding.org or the ICC viewer before quoting (spec 8.7).
  14. 14.2023 Florida Building Code, Residential, 8th ed., Chapter 9 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026. FBC text read from UpCodes (unofficial transcription): check floridabuilding.org or the ICC viewer before quoting (spec 8.7). Source URL inherited from COM-29 (the research cites it "as COM-29").
  15. 15.2023 Florida Building Code, Building, 8th ed., Chapter 1 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026. FBC text read from UpCodes (unofficial transcription): check floridabuilding.org or the ICC viewer before quoting (spec 8.7). Source URL inherited from C-3 (the research cites it "as C-3").
  16. 16.Florida Statutes, section 489.113 (2026). Read Oct 5, 2026.
  17. 17.Florida Building Commission. Read Oct 5, 2026.
  18. 18.Florida Statutes, section 553.842 (2026). Read Oct 5, 2026.
  19. 19.Town of Lantana - Building Permits, Town of Lantana. Read Oct 5, 2026.
  20. 20.NOAA National Hurricane Center, Tropical Cyclone Report: Hurricane Matthew (AL142016), NOAA National Hurricane Center. Read Oct 5, 2026.
  21. 21.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25024, via Census Reporter API, U.S. Census Bureau (via Census Reporter). Read Oct 5, 2026.
  22. 22.Citizens Property Insurance Corporation, inspections FAQ (updated 2026-03-17), Citizens Property Insurance. Read Oct 4, 2026.
  23. 23.NOAA National Hurricane Center, Tropical Cyclone Report: Hurricane Irma (AL112017), NOAA National Hurricane Center. Read Oct 5, 2026.
  24. 24.NOAA National Hurricane Center, Tropical Cyclone Report: Hurricane Dorian (AL052019), NOAA National Hurricane Center. Read Oct 5, 2026.
  25. 25.NOAA NCEI U.S. Climate Normals 1991-2020 (access data service), NOAA National Centers for Environmental Information. Read Oct 5, 2026.
  26. 26.NOAA Atlas 14 Volume 9 version 2, partial-duration intensity estimates at the Lantana 2020 Census internal point (26.5834, -80.0554), NOAA Hydrometeorological Design Studies Center. Read Oct 5, 2026.
  27. 27.NOAA National Hurricane Center, Tropical Cyclone Climatology, NOAA National Hurricane Center. Read Oct 5, 2026.
  28. 28.Official website: Town of Lantana, Flood Zone Building Requirements, Official website. Read Oct 5, 2026.
  29. 29.U.S. Census Bureau, 2020 Census counts (POP100, HU100) via TIGERweb tigerWMS_Census2020 (AREALAND/AREAWATER), U.S. Census Bureau. Read Oct 5, 2026.

South Fork Roofing

New construction roofing in Lantana

Answer a few questions about the job, or call.

CallGet a quote