New construction · University
New construction roofing in University (Orange County), FL
In University, 20.6 percent of homes were built in 2010 or later, so most roofs here are not new construction. The newer ones went through county permitting and code inspections. If you are building now, the roof is scheduled around the inspections listed below.
Updated October 2026

Local housing
How new are homes in University?
The median home here dates to 1994, the same as Orange County as a whole. Only 14.3 percent of units predate 1980, against 26.1 percent countywide. That suggests University skews younger than the county in its oldest housing, while building since 2010 has been steady rather than heavy.
Mobile homes make up 7.1 percent of units here, more than double the county's 3.1 percent. Their roofs follow the federal HUD code, not the Florida Building Code, so the steps below apply to site-built homes.
Permits and code
Which code edition and permit office apply?
No city hall handles University permits, because it is an unincorporated census-designated place. The Orange County Division of Building Safety issues your roof permit, and you submit applications and request inspections through its online Fast Track portal.
A permit applied for in University before December 31, 2026 is judged under the Eighth Edition, which the 2023 code made effective on December 31, 2023. Anything filed with the county on or after that December date moves to the Ninth Edition, so timing the application matters.
Under Fla. Stat. 553.842(5), roofing counts as a product approval category that applies statewide. The product on your permit should have a Florida Building Commission approval number you can look up by manufacturer or FL number.
Build sequence
Deck, underlayment and inspection order
Roof sheathing must be nailed with ring shank nails, 2 1/2 inches long and 0.131 inch thick for the standard option. The dry-in then needs one of three methods: full self-adhering membrane, tape over every deck joint plus underlayment, or two layers of felt fastened at 12 inches in the field.
Inspections run in order: framing, sheathing, exterior wall coverings, roofing (dry-in, flashing, coverings), then final. Book the roofer after the sheathing inspection passes, not before, so the deck is not covered while it still needs a look.
On a new University build, a builder may lay asphalt shingles itself, since Florida allows that on its own new building. For tile, metal or membrane, the builder must hire a roofer who holds a state certificate or registration.
Questions
New construction roofing in University: questions
Do new homes in University follow the 25 percent roof rule?
No. The 25 percent rule in the Florida Building Code applies to existing roofs, where repairing more than 25 percent of a roof section in 12 months can require replacing the whole section. A brand-new roof on a new house is built to the current code from the start. With 20.6 percent of University homes built in 2010 or later, the rule matters mostly for the older homes around you.
Source: U.S. Census Bureau, American Community Survey 2020-2024 5-year estimates (acs2024_5yr), via Census Reporter API, read Oct 5, 2026
What does the county inspect on a new roof in Orange County?
The Orange County Division of Building Safety enforces the Florida Building Code, and you request each inspection through the Fast Track portal. The code lists framing, sheathing, exterior wall coverings, roofing and final inspections. An inspection of the roof looks at dry-in, insulation, roof coverings and flashing.
Source: Orange County Government, Division of Building Safety, read Oct 5, 2026
Does the builder cover a new roof in a newly built University home?
Yes, since July 1, 2025, Fla. Stat. 553.837 requires a builder to cover a new home for 1 year against defects in material or workmanship that cause a material Florida Building Code violation. The median home in University was built in 1994, so many neighbors have older roofs, while a newly built home sits under this builder coverage. Normal wear and tear, settling, defects caused by the owner and natural disasters fall outside it. Before signing, review your contract and find out from the builder how a claim on the roof would be handled.
Source: U.S. Census Bureau, American Community Survey 2020-2024 5-year estimates (acs2024_5yr), via Census Reporter API, read Oct 5, 2026
Do new houses need gutters in University?
Gutters with downspouts are required whenever the eaves project less than 6 inches, although gable end rakes and any roof that sits above another roof are exempt. Check your plans with the Orange County Division of Building Safety if the eave depth is close to 6 inches. Because 7.1 percent of University units are mobile homes, confirm which code governs yours.
Source: U.S. Census Bureau, American Community Survey 2020-2024 5-year estimates (acs2024_5yr), via Census Reporter API, table B25024, read Oct 5, 2026
Sources for this page(30)
- 1.Median year homes were built: 1994. U.S. Census Bureau, American Community Survey 2020-2024 5-year estimates (acs2024_5yr), via Census Reporter API. Read Oct 5, 2026.
- 2.U.S. Census Bureau, American Community Survey 2020-2024 5-year estimates (acs2024_5yr), via Census Reporter API, table B25035. Read Oct 5, 2026.
- 3.U.S. Census Bureau, American Community Survey 2020-2024 5-year estimates (acs2024_5yr), via Census Reporter API, table B25034. Read Oct 5, 2026.
- 4.U.S. Census Bureau, American Community Survey 2020-2024 5-year estimates (acs2024_5yr), via Census Reporter API, tables B25034/B25035. Read Oct 5, 2026.
- 5.U.S. Census Bureau, American Community Survey 2020-2024 5-year estimates (acs2024_5yr), via Census Reporter API, table B25024. Read Oct 5, 2026.
- 6.U.S. Census Bureau, American Community Survey 2020-2024 5-year estimates (acs2024_5yr), via Census Reporter API, table B25024. Read Oct 5, 2026.
- 7.Permit office: Orange County Division of Building Safety. Orange County Division of Building Safety. Read Oct 10, 2026.
- 8.Orange County Government, Division of Building Safety. Read Oct 5, 2026.
- 9.Share of homes built 2010 or later: 20.6%. U.S. Census Bureau, American Community Survey 2020-2024 5-year estimates (acs2024_5yr), via Census Reporter API. Read Oct 5, 2026.
- 10.FRSA, "New 2023 FBC Eighth Edition is Now in Effect", 2024-02-13. Read Oct 5, 2026.
- 11.Miami-Dade County RER notice. Read Oct 5, 2026.
- 12.Florida Statutes, section 553.842 (2026). Read Oct 5, 2026.
- 13.Florida Building Commission. Read Oct 5, 2026.
- 14.2023 Florida Building Code, Residential, 8th ed., Chapter 8 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
- 15.2023 Florida Building Code, Residential, 8th ed., Chapter 9 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
- 16.2023 Florida Building Code, Building, 8th ed., Chapter 1 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
- 17.Florida Statutes, section 489.113 (2026). Read Oct 5, 2026.
- 18.2023 Florida Building Code, Building, 8th ed., Chapter 15 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
- 19.Florida Statutes, section 553.837 (2026). Read Oct 5, 2026.
- 20.2023 Florida Building Code, Residential, 8th ed., R318.5 (UpCodes viewer, unofficial transcription); FBC-Building 1503.7. Read Oct 5, 2026.
- 21.Orange County Division of Building Safety, ocfl.net. Read Oct 5, 2026.
- 22.Florida Statutes, section 627.7011 (2026), Florida Legislature. Read Oct 4, 2026.
- 23.Florida Statutes, section 713.135 (2026), Florida Legislature. Read Oct 5, 2026.
- 24.NOAA NCEI, U.S. Climate Normals 1991-2020 (annual/seasonal), access-data API, NOAA National Centers for Environmental Information. Read Oct 5, 2026.
- 25.NWS Melbourne, Post Tropical Cyclone Report: Hurricane Matthew (2016), National Weather Service. Read Oct 5, 2026.
- 26.NWS Melbourne, Post Tropical Cyclone Report: Hurricane Irma (2017), National Weather Service. Read Oct 5, 2026.
- 27.NOAA Atlas 14 Volume 9 version 2, partial-duration intensity estimates at the University 2020 Census internal point (28.5890, -81.1975), NOAA Hydrometeorological Design Studies Center. Read Oct 5, 2026.
- 28.NOAA Atlas 14 Volume 9 version 2, partial-duration 24-hour depth estimates at the University 2020 Census internal point (28.5890, -81.1975), NOAA Hydrometeorological Design Studies Center. Read Oct 5, 2026.
- 29.NWS Melbourne, Lightning Information Center, National Weather Service. Read Oct 5, 2026.
- 30.NWS Melbourne, Post Tropical Cyclone Report: Hurricane Ian (2022), National Weather Service. Read Oct 5, 2026.
South Fork Roofing
New construction roofing in University
Answer a few questions about the job, or call.
