New construction · Alafaya
New construction roofing in Alafaya, FL
Only 12 percent of Alafaya homes were built in 2010 or later, so new construction here is the smaller share of the housing stock. The Orange County Division of Building Safety permits each new roof. Your build is judged under the Florida Building Code edition in force on the day you apply.
Updated October 2026

Code edition
Which code edition will your new roof face?
Alafaya is an unincorporated area, so the Orange County Division of Building Safety handles your permit. You file and book inspections on the county's Fast Track portal. That office enforces the Florida Building Code, whose first edition dates to March 1, 2002. Today's 2023 Eighth Edition took effect December 31, 2023.
Your filing date decides which book applies. Plans submitted on or after December 31, 2026 must meet the Ninth Edition. Alafaya's median home dates to 2002 and the county's to 1994, so most nearby houses went up under older editions than your new one will.
Roof build-up
Deck, underlayment and product approval
The roof deck comes first. Sheathing is nailed with ring shank nails, 2 1/2 inches long and 0.131 inch thick. Then comes dry-in, and the code gives you three ways to do it. Self-adhering membrane can go over the full deck if you prefer. You can tape or strip every joint with 3 3/4-inch membrane under a standard underlayment. Or you can lay two layers of felt-type underlayment.
Metal drip edge sits over the underlayment at eaves and gables, nailed no more than 12 inches apart. Where design wind speed reaches 110 mph, that spacing drops to 4 inches. Roofing is a mandatory statewide product-approval category, so each product on your permit needs a Florida approval number. The Florida Building Commission search finds them by manufacturer or FL number.
Orange County, where Alafaya is located, falls outside the High-Velocity Hurricane Zone. That zone is only Broward and Miami-Dade. Hurricane Matthew in 2016 still produced a 61 mph peak gust at Orlando International. Your plans carry the uplift and wind-borne debris details the Florida Building Code sets for the county.
Inspections
Scheduling the roof with the build
Inspections run in a set order: foundation, framing, sheathing, exterior wall coverings, roofing, final. During the roofing inspection, the inspector checks the dry-in, the insulation, the coverings and the flashing. Your permit lapses if work has not started within 6 months of issue, or if 180 days pass without an approved inspection.
A builder may lay asphalt shingles on its own new building. Tile, metal and membrane go to a roofing contractor holding state certification or registration. Before the first inspection, the Notice of Commencement has to be recorded and posted on site. A builder must also warrant a new home for one year against code-violating defects.
Questions
New construction roofing in Alafaya: questions
Who permits a new roof in Alafaya?
The Orange County Division of Building Safety permits new roofs in Alafaya, because it is an unincorporated area with no city building office. Permit applications and inspection requests are filed through the county's Fast Track portal. Enforcement of the Florida Building Code and Orange County's construction regulations falls to the division. Your roofing contractor or builder normally files the permit.
Source: Orange County Division of Building Safety, read Oct 5, 2026
Which Florida Building Code will my new Alafaya roof follow?
It depends on your application date. The 2023 Eighth Edition took effect on December 31, 2023. Any application or plan you submit on or after December 31, 2026 falls under the Ninth Edition. Ask the Orange County Division of Building Safety which edition applies to your filing date.
Source: Orange County Government, Division of Building Safety, read Oct 5, 2026
Is a metal roof a good idea in Florida?
Metal is an allowed roof covering on a new Florida home. It follows the same three dry-in options used for shingles, needs statewide product approval, and must be installed by a certified or registered roofing contractor. Alafaya's newer homes, with a 2002 median build year, were built under the Florida Building Code, so metal fits that framework.
Source: U.S. Census Bureau, American Community Survey 2020-2024 5-year estimates (acs2024_5yr), via Census Reporter API, table B25035, read Oct 5, 2026
Do new Alafaya homes need gutters?
Where eaves project less than 6 inches, you need gutters with downspouts, though gable end rakes and eaves over another roof are exempt. Each downspout needs to empty at least 1 foot away from the sidewall. Check your plans with the Orange County Division of Building Safety.
Source: Orange County Division of Building Safety, read Oct 5, 2026
Sources for this page(33)
- 1.Permit office: Orange County Division of Building Safety. Orange County Division of Building Safety. Read Oct 10, 2026.
- 2.Orange County Government, Division of Building Safety. Read Oct 5, 2026.
- 3.Median year homes were built: 2002. U.S. Census Bureau, American Community Survey 2020-2024 5-year estimates (acs2024_5yr), via Census Reporter API. Read Oct 5, 2026.
- 4.U.S. Census Bureau, American Community Survey 2020-2024 5-year estimates (acs2024_5yr), via Census Reporter API, table B25035. Read Oct 5, 2026.
- 5.U.S. Census Bureau, American Community Survey 2020-2024 5-year estimates (acs2024_5yr), via Census Reporter API, tables B25034/B25035. Read Oct 5, 2026.
- 6.Hurricane Matthew (2016). NWS Melbourne, Post Tropical Cyclone Report: Hurricane Matthew (2016). Read Oct 5, 2026.
- 7.Share of homes built 2010 or later: 12%. U.S. Census Bureau, American Community Survey 2020-2024 5-year estimates (acs2024_5yr), via Census Reporter API. Read Oct 5, 2026.
- 8.U.S. Census Bureau, American Community Survey 2020-2024 5-year estimates (acs2024_5yr), via Census Reporter API, table B25034. Read Oct 5, 2026.
- 9.2023 Florida Building Code, Building, 8th ed., Chapter 1 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
- 10.FRSA, "New 2023 FBC Eighth Edition is Now in Effect", 2024-02-13. Read Oct 5, 2026.
- 11.Miami-Dade County RER notice. Read Oct 5, 2026.
- 12.2023 Florida Building Code, Residential, 8th ed., Chapter 8 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
- 13.2023 Florida Building Code, Residential, 8th ed., Chapter 9 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
- 14.Florida Statutes, section 553.842 (2026). Read Oct 5, 2026.
- 15.Florida Building Commission. Read Oct 5, 2026.
- 16.FBC-Building 2023 Chapter 2 definitions. Read Oct 5, 2026.
- 17.2023 Florida Building Code, Building, 8th ed., Chapter 2 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
- 18.Florida Statutes, section 489.113 (2026). Read Oct 5, 2026.
- 19.Florida Statutes, section 553.837 (2026). Read Oct 5, 2026.
- 20.2023 Florida Building Code, Residential, 8th ed., Chapter 3 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
- 21.Orange County Division of Building Safety, ocfl.net. Read Oct 5, 2026.
- 22.NWS Melbourne, Post Tropical Cyclone Report: Hurricane Matthew (2016), National Weather Service. Read Oct 5, 2026.
- 23.Florida Statutes, section 713.135 (2026), Florida Legislature. Read Oct 5, 2026.
- 24.U.S. Census Bureau, American Community Survey 2020-2024 5-year estimates (acs2024_5yr), via Census Reporter API, U.S. Census Bureau (via Census Reporter). Read Oct 5, 2026.
- 25.U.S. Census Bureau, American Community Survey 2020-2024 5-year estimates (acs2024_5yr), via Census Reporter API, table B25024, U.S. Census Bureau (via Census Reporter). Read Oct 5, 2026.
- 26.Citizens Property Insurance Corporation, inspections FAQ (updated 2026-03-17), Citizens Property Insurance. Read Oct 4, 2026.
- 27.2023 Florida Building Code, Building, 8th ed., Chapter 15 (UpCodes viewer, unofficial transcription), UpCodes (Florida Building Code transcription). Read Oct 5, 2026.
- 28.NOAA NCEI, U.S. Climate Normals 1991-2020 (annual/seasonal), access-data API, NOAA National Centers for Environmental Information. Read Oct 5, 2026.
- 29.NOAA Atlas 14 Volume 9 version 2, partial-duration intensity estimates at the Alafaya 2020 Census internal point (28.5284, -81.1857), NOAA Hydrometeorological Design Studies Center. Read Oct 5, 2026.
- 30.NOAA Atlas 14 Volume 9 version 2, partial-duration 24-hour depth estimates at the Alafaya 2020 Census internal point (28.5284, -81.1857), NOAA Hydrometeorological Design Studies Center. Read Oct 5, 2026.
- 31.NWS Melbourne, Post Tropical Cyclone Report: Hurricane Irma (2017), National Weather Service. Read Oct 5, 2026.
- 32.NWS Melbourne, Post Tropical Cyclone Report: Hurricane Ian (2022), National Weather Service. Read Oct 5, 2026.
- 33.NWS Melbourne, Lightning Information Center, National Weather Service. Read Oct 5, 2026.
South Fork Roofing
New construction roofing in Alafaya
Answer a few questions about the job, or call.
