Skip to content

New construction · Edgewood

New construction roofing in Edgewood, FL

Only 6.9 percent of Edgewood homes were built in 2010 or later, so new roofs here are mostly on infill lots or teardown rebuilds. A new-build roof is permitted through the city's partnership with the Orange County Building Department. It also has to follow the code edition in force on your application date.

Updated October 2026

A roof deck sheathed in red-brown ZIP System panels with black seam tape, a bucket and a ladder on the deck, homes and a street behind.

Code edition

Which code edition your Edgewood permit faces

Edgewood is small and mostly built out. By the city's housing mix, 57.0 percent of homes predate 1980, against 26.1 percent across Orange County. A new roof here usually sits on a rare new lot, so the rules for fresh construction matter more than they would in a fast-growing subdivision town.

Your application date sets the edition. Since December 31, 2023, the Eighth Edition (2023) of the Florida Building Code has governed new submittals. Any permit application or plan submitted on or after December 31, 2026 must meet the Ninth Edition instead. If your Edgewood plans are close to that date, ask the permit office which edition applies.

Roofing is a statewide product-approval category. Shingles, tile, metal and underlayment all need approval numbers that the building office can match to your permit. The Florida Building Commission has a public search by approval number or manufacturer. Miami-Dade NOA rules do not govern Edgewood, since the high-velocity hurricane zone covers only Broward and Miami-Dade counties.

Build details

Sheathing, dry-in and drip edge for a new roof

On a new Edgewood home, the roof deck is fastened with ring shank nails sized 2 1/2 inches by 0.131 inch. Under the code, a shingle or metal roof can be dried in using any of three methods. In the first, self-adhering membrane covers the entire deck. The second method seals each deck joint with tape at least 3 3/4 inches wide and then lays underlayment across the full roof. The third uses two layers of felt underlayment, nailed 12 inches apart in the field and 6 inches at laps.

Along the eaves and gables, the underlayment goes down first and the drip edge is laid over it. Nails run at most 12 inches apart, or 4 inches apart where design wind speed reaches 110 mph or the mean roof height exceeds 33 feet. Gutters with downspouts are required where eaves project less than 6 inches, and downspouts must discharge at least 1 foot from the sidewall.

Scheduling

Fitting the roof into the building schedule and its inspections

Orange County runs all new permit applications and inspection requests through its online Fast Track portal. The code lists inspections in order: foundation, framing, sheathing, exterior wall covering, roofing, then final. The roofing inspection looks at dry-in, insulation, coverings and flashing. Book the roofer so the deck passes sheathing before any underlayment goes down.

Who installs matters. A builder may put on asphalt shingles itself, but only on its own new building. Tile, metal and membrane work must go to a roofer holding a state certificate or registration. A permit also lapses if work does not start within 6 months of issue or stops for 6 months, so line up the roof date before you pull it.

The owner, or the owner's contractor with written authorization, may use a private provider for plan review or inspections. Whichever route you take in Edgewood, the Notice of Commencement must be recorded and posted on the job site before the first inspection, or you risk paying twice for the work.

Questions

New construction roofing in Edgewood: questions

Where do I get a roof permit for a new home in Edgewood?

Your first contact should be the City of Edgewood Building & Permitting office. Permit processing is handled through a partnership between the city and the Orange County Building Department. Orange County takes new applications and inspection requests through its Fast Track portal. The county division enforces the Florida Building Code, so confirm with the city office which steps it handles and which the county handles before you submit plans.

Source: City of Edgewood, Building & Permitting, read Oct 5, 2026

Related: New construction roofing

Which Florida Building Code edition applies to a new Edgewood roof?

The edition in force on the day you submit your application controls. Edgewood falls under Orange County's building division, which enforces the Florida Building Code. The 2023 edition applies now. Any application or plan set submitted on or after December 31, 2026 has to meet the Ninth Edition. Only 6.9 percent of Edgewood homes date from 2010 or later, so most plans here are infill. Ask the permit office about timing if yours is near that line.

Source: FRSA, "New 2023 FBC Eighth Edition is Now in Effect", 2024-02-13, read Oct 5, 2026

Related: New construction roofing

Does a new home in Edgewood come with a builder warranty on defects?

Florida Statute 553.837, in effect since July 1, 2025, makes a builder warrant a newly built home for 1 year against equipment, material or workmanship defects that cause a material Florida Building Code violation. Normal wear, settling, defects caused by the owner and natural disasters fall outside that coverage. Edgewood permits run through the Orange County Building Department partnership, and its inspection records show what passed. Read your purchase contract and ask the builder in writing what it covers.

Source: Florida Statutes, section 553.837 (2026), read Oct 5, 2026

Related: New construction roofing

Can my general contractor shingle my new Edgewood house?

Yes, in one case. On a new building it constructed itself, a general, building or residential contractor is permitted to put on asphalt or fiberglass shingles without a separate roofing license. Tile, metal and membrane roofs must go to a roofer with a state certificate or registration. A general contractor who lacks that license also cannot advertise as a roofer. Edgewood permits go through the Orange County Building Department partnership, so the permit office can confirm who is pulling the roof permit.

Source: Florida Statutes, section 489.113 (2026), read Oct 5, 2026

Related: New construction roofing

Nearby

New construction roofing near Edgewood

Sources for this page(30)
  1. 1.U.S. Census Bureau, American Community Survey 2020-2024 5-year estimates (acs2024_5yr), via Census Reporter API, table B25034. Read Oct 5, 2026.
  2. 2.U.S. Census Bureau, American Community Survey 2020-2024 5-year estimates (acs2024_5yr), via Census Reporter API, tables B25034/B25035. Read Oct 5, 2026.
  3. 3.Share of homes built 2010 or later: 6.9%. U.S. Census Bureau, American Community Survey 2020-2024 5-year estimates (acs2024_5yr), via Census Reporter API. Read Oct 5, 2026.
  4. 4.City of Edgewood, Building & Permitting. Read Oct 5, 2026.
  5. 5.Orange County Government, Division of Building Safety. Read Oct 5, 2026.
  6. 6.Permit office: City of Edgewood Building & Permitting (partnered with the Orange County Building Department). City of Edgewood Building & Permitting (partnered with the Orange County Building Department). Read Oct 10, 2026.
  7. 7.FRSA, "New 2023 FBC Eighth Edition is Now in Effect", 2024-02-13. Read Oct 5, 2026.
  8. 8.Miami-Dade County RER notice. Read Oct 5, 2026.
  9. 9.Florida Statutes, section 553.842 (2026). Read Oct 5, 2026.
  10. 10.Florida Building Commission. Read Oct 5, 2026.
  11. 11.FBC-Building 2023 Chapter 2 definitions. Read Oct 5, 2026.
  12. 12.2023 Florida Building Code, Residential, 8th ed., Chapter 8 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
  13. 13.2023 Florida Building Code, Residential, 8th ed., Chapter 9 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
  14. 14.2023 Florida Building Code, Residential, 8th ed., Chapter 3 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
  15. 15.2023 Florida Building Code, Building, 8th ed., Chapter 1 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
  16. 16.Florida Statutes, section 489.113 (2026). Read Oct 5, 2026.
  17. 17.Florida Statutes, section 553.791 (2026). Read Oct 5, 2026.
  18. 18.Florida Statutes, section 553.837 (2026). Read Oct 5, 2026.
  19. 19.U.S. Census Bureau, American Community Survey 2020-2024 5-year estimates (acs2024_5yr), via Census Reporter API, U.S. Census Bureau (via Census Reporter). Read Oct 5, 2026.
  20. 20.Florida Statutes, section 713.135 (2026), Florida Legislature. Read Oct 5, 2026.
  21. 21.City of Edgewood Building & Permitting (partnered with the Orange County Building Department), City of Edgewood Building & Permitting. Read Oct 5, 2026.
  22. 22.Florida Statutes, section 627.7011 (2026), Florida Legislature. Read Oct 4, 2026.
  23. 23.2023 Florida Building Code, Building, 8th ed., Chapter 15 (UpCodes viewer, unofficial transcription), UpCodes (Florida Building Code transcription). Read Oct 5, 2026.
  24. 24.U.S. Census Bureau, 2020 Census (TIGERweb tigerWMS_Census2020 MapServer: POP100, HU100, AREALAND, AREAWATER), U.S. Census Bureau. Read Oct 5, 2026.
  25. 25.U.S. Census Bureau, 2020 Census (TIGERweb tigerWMS_Census2020 MapServer: POP100, HU100, AREALAND, AREAWATER), U.S. Census Bureau. Read Oct 5, 2026.
  26. 26.NWS Melbourne, Post Tropical Cyclone Report: Hurricane Matthew (2016), National Weather Service. Read Oct 5, 2026.
  27. 27.NWS Melbourne, Post Tropical Cyclone Report: Hurricane Irma (2017), National Weather Service. Read Oct 5, 2026.
  28. 28.NOAA Atlas 14 Volume 9 version 2, partial-duration intensity estimates at the Edgewood 2020 Census internal point (28.4815, -81.3701), NOAA Hydrometeorological Design Studies Center. Read Oct 5, 2026.
  29. 29.NOAA Atlas 14 Volume 9 version 2, partial-duration 24-hour depth estimates at the Edgewood 2020 Census internal point (28.4815, -81.3701), NOAA Hydrometeorological Design Studies Center. Read Oct 5, 2026.
  30. 30.NOAA NCEI, U.S. Climate Normals 1991-2020 (annual/seasonal), access-data API, NOAA National Centers for Environmental Information. Read Oct 5, 2026.

South Fork Roofing

New construction roofing in Edgewood

Answer a few questions about the job, or call.

CallFree estimate