Skip to content

New construction · Three Lakes

New construction roofing in Three Lakes, FL

Only 5.5 percent of Three Lakes homes were built in 2010 or later, so a new roof here usually belongs to one of the few recent builds. Permits come from Miami-Dade County, which sits in the High-Velocity Hurricane Zone. That sets the product approvals and inspections you will face.

Updated October 2026

A roof deck sheathed in red-brown ZIP System panels with black seam tape, a bucket and a ladder on the deck, homes and a street behind.

Permit rules

Which code edition applies and which approvals a new roof in Three Lakes needs

As a census-designated place, Three Lakes has no city hall of its own. The county's Regulatory and Economic Resources office, Building & Permits, handles every roof permit. Eighth Edition rules, effective December 31, 2023, cover earlier filings. An application filed on December 31, 2026 or later falls under the Ninth Edition instead.

Roofing products must carry approval before they go on the house. Miami-Dade's Product Control Section reviews roofing systems, and the permit application lists the approval or NOA numbers. Once its expiration date passes, an NOA no longer counts, and the building official expects a copy kept at the job site.

On a new low-slope roof in the HVHZ, the minimum deck slope is 1/4:12, and loose-laid systems are not permitted. Ask your builder which approved system the plans call for before the permit is filed.

What goes on first

What goes on a new home's deck: underlayment and drip edge

Under the residential code, you nail roof sheathing on a new home with 2 1/2 inch ring shank nails. The dry-in comes next. The code allows three options: a self-adhering membrane over the whole deck, tape or membrane over every deck joint plus approved underlayment, or two layers of felt-type underlayment.

At eaves and gables, the shingle drip edge is laid over the underlayment. Fasteners may be 12 inches apart, but must be 4 inches apart where design wind speed is 110 mph or more. Where eaves project less than 6 inches, you need gutters with downspouts, and each downspout has to empty at least 1 foot away from the wall.

Build sequence

Working the roof into both the inspection sequence and the builder's schedule

Inspections run in the order the code lists them, starting with foundation and framing, then sheathing, exterior wall coverings and roofing, and ending with the final. The roofing inspection covers dry-in, insulation, roof coverings and flashing together. Your roofer cannot close in the roof until sheathing has passed, so schedule around that.

Only on a new building it constructed itself may a general contractor put on asphalt or fiberglass shingles with its own crew. If your roof is tile, metal or membrane, you need to hire a certified or registered roofing contractor. Check the license number before signing.

Since July 1, 2025, a builder must warrant a new home for 1 year against defects that violate the building code. Natural disasters are excluded. Before the first inspection, the Notice of Commencement has to be both recorded and posted.

Questions

New construction roofing in Three Lakes: questions

Which building code edition applies to a new roof permit in Three Lakes?

It depends on the filing date. Any permit application submitted on or after December 31, 2026 has to meet the Ninth Edition of the Florida Building Code. Earlier applications follow the Eighth Edition, effective December 31, 2023. Because Three Lakes is unincorporated, permits there come from Miami-Dade County Regulatory and Economic Resources. Ask the permit office which edition your submittal date puts you under.

Source: Miami-Dade County Regulatory and Economic Resources (RER) - Building & Permits, read Oct 5, 2026

Related: New construction roofing

Are most Three Lakes homes new enough to have modern roofs?

Not necessarily. The median Three Lakes home was built in 1997, newer than the county median of 1980, but only 5.5 percent of homes date from 2010 or later. A home's build year says little about its roof's age or code edition. If you are unsure, ask the county building office about the permit history on your roof.

Source: U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25035, via Census Reporter API, read Oct 5, 2026

Related: New construction roofing

What is the 25 percent roof rule in Florida?

The code limits repair, replacement or recovering to 25 percent of a roof section within 12 months, unless you replace the entire section. You qualify for the exception when the existing roof was built, repaired or replaced under the 2007 Florida Building Code or a later edition. New construction starts under current code, so the rule matters later, when you repair a roof on a Three Lakes home.

Source: Miami-Dade County Regulatory and Economic Resources (RER) - Building & Permits, read Oct 5, 2026

Related: New construction roofing

Can I use a private inspector instead of the county on a new roof?

Yes, under Fla. Stat. 553.791 the owner, or the owner's contractor with written authorization, may choose a private provider at any time for plans review or inspections. The median home in Three Lakes was built in 1997, so many roofs there are reaching an age where replacement permits are common and the choice of inspector can matter. For a Three Lakes build, the county office that issues the permit remains Miami-Dade Regulatory and Economic Resources. Ask it how a private provider's reports are filed with your permit.

Source: Miami-Dade County Regulatory and Economic Resources (RER) - Building & Permits, read Oct 5, 2026

Related: New construction roofing

Sources for this page(32)
  1. 1.Permit office: Miami-Dade County Regulatory and Economic Resources (RER) - Building & Permits. Miami-Dade County Regulatory and Economic Resources (RER) - Building & Permits. Read Oct 10, 2026.
  2. 2.Miami-Dade County RER, Board and Code Administration Division, Product Approval. Read Oct 5, 2026.
  3. 3.Florida Building Commission, 'Setting New Standards for Safety: The Florida Building Code' (2004 publication; wind-speed figures in it are outdated and not used). Read Oct 5, 2026.
  4. 4.U.S. Census Bureau, Building Permits Survey county annual files (co2025a.txt, co2020a.txt). Read Oct 5, 2026.
  5. 5.Share of homes built 2010 or later: 5.5%. U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25034, via Census Reporter API. Read Oct 5, 2026.
  6. 6.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25035, via Census Reporter API. Read Oct 5, 2026.
  7. 7.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25035, B25034, B25024, via Census Reporter API. Read Oct 5, 2026.
  8. 8.Median year homes were built: 1997. U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25035, via Census Reporter API. Read Oct 5, 2026.
  9. 9.FRSA, "New 2023 FBC Eighth Edition is Now in Effect", 2024-02-13. Read Oct 5, 2026.
  10. 10.Miami-Dade County RER notice. Read Oct 5, 2026.
  11. 11.Florida Statutes, section 553.842 (2026). Read Oct 5, 2026.
  12. 12.miamidade.gov. Read Oct 5, 2026.
  13. 13.2023 Florida Building Code, Building, 8th ed., Chapter 15 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
  14. 14.2023 Florida Building Code, Residential, 8th ed., Chapter 8 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
  15. 15.2023 Florida Building Code, Residential, 8th ed., Chapter 9 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
  16. 16.2023 Florida Building Code, Residential, 8th ed., Chapter 3 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
  17. 17.2023 Florida Building Code, Building, 8th ed., Chapter 1 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
  18. 18.Florida Statutes, section 489.113 (2026). Read Oct 5, 2026.
  19. 19.Florida Statutes, section 553.837 (2026). Read Oct 5, 2026.
  20. 20.FBC-Building 2023 Chapter 2 definitions. Read Oct 5, 2026.
  21. 21.Florida Statutes, section 553.791 (2026). Read Oct 5, 2026.
  22. 22.Miami-Dade County Regulatory and Economic Resources (RER) - Building & Permits, Miami. Read Oct 5, 2026.
  23. 23.Florida Statutes, section 713.135 (2026), Florida Legislature. Read Oct 5, 2026.
  24. 24.Florida Statutes, section 627.7011 (2026), Florida Legislature. Read Oct 4, 2026.
  25. 25.NOAA National Hurricane Center, Tropical Cyclone Report: Hurricane Irma (AL112017), NOAA National Hurricane Center. Read Oct 5, 2026.
  26. 26.NOAA National Hurricane Center, Tropical Cyclone Report: Hurricane Dorian (AL052019), NOAA National Hurricane Center. Read Oct 5, 2026.
  27. 27.NOAA National Hurricane Center, Tropical Cyclone Climatology, NOAA National Hurricane Center. Read Oct 5, 2026.
  28. 28.NOAA NCEI U.S. Climate Normals 1991-2020 (access data service), NOAA National Centers for Environmental Information. Read Oct 5, 2026.
  29. 29.U.S. Census Bureau, 2020 Census counts (POP100, HU100) via TIGERweb tigerWMS_Census2020 (AREALAND/AREAWATER), U.S. Census Bureau. Read Oct 5, 2026.
  30. 30.NOAA Atlas 14 Volume 9 version 2, partial-duration intensity estimates at the Three Lakes 2020 Census internal point (25.6427, -80.4000), NOAA Hydrometeorological Design Studies Center. Read Oct 5, 2026.
  31. 31.NOAA Atlas 14 Volume 9 version 2, partial-duration 24-hour depth estimates at the Three Lakes 2020 Census internal point (25.6427, -80.4000), NOAA Hydrometeorological Design Studies Center. Read Oct 5, 2026.
  32. 32.Wikipedia, 'Three Lakes, Florida' (revision 1374945670), Wikipedia. Read Oct 5, 2026.

South Fork Roofing

New construction roofing in Three Lakes

Answer a few questions about the job, or call.

CallFree estimate