New construction · Kendall
New construction roofing in Kendall, FL
Only 4 percent of Kendall homes were built in 2010 or later, so new construction is a small slice of a mostly older housing stock. A new roof here still carries the strictest code in Florida. Miami-Dade County permits it, and the product must be approved first.
Updated October 2026

Our workKendall figures this page uses
- Share of homes built 2010 or later
- 4%
- Housing units (ACS 5-year)
- 32,492
- Median year homes were built
- 1978
Code and approval
Which code edition and product rules apply in Kendall
Miami-Dade County, home to Kendall, is one of only two counties in the High Velocity Hurricane Zone. Those provisions came after Hurricane Andrew badly damaged the area in 1992. The 2023 edition of the Florida Building Code is in force now. Any permit application filed on or after December 31, 2026 falls under the Ninth Edition.
Roofing products need approval before they go on a permit. Miami-Dade's Product Control Section approves or denies roofing systems and certifies the testing labs. In the county, the permit application lists the product approval or Notice of Acceptance numbers. A Notice of Acceptance has an expiration date, and a copy must be on the job site for the building official.
Ask your builder for each roofing product's approval number before the permit is filed. Check the expiration date against your schedule. A lapsed approval can stall a roof that is otherwise ready to go on.
Roof build-up
What goes on a new Kendall roof: the deck, the underlayment and the drip edge
The deck comes first. Under the residential code, ring shank nails 2 1/2 inches long fasten the sheathing on a new home. Fastening is inspected before anything covers it, so nail pattern and nail type matter more than they look.
Three dry-in methods are permitted when the roof will be shingle or metal. The first option is a self-adhering membrane that covers the entire deck. Another is a 3 3/4-inch membrane or tape strip over every deck joint, then underlayment over the whole roof. The third is two layers of felt-type underlayment with cap nails at 12 inches in the field and 6 inches at laps. Metal drip edge goes over the underlayment, nailed at 4 inches on center where wind speeds reach 110 mph or the roof is above 33 feet.
Tile follows the manufacturer's instructions or the Florida High Wind tile manual, and goes only over solid sheathing unless tested otherwise. Low-slope sections in the HVHZ must be at least 1/4:12 on new construction, and loose-laid ballasted systems are not allowed.
Timing
Fitting the roof into the build schedule alongside the inspections
Inspections run in a set order under the code: foundation, framing, sheathing, exterior wall coverings, roofing, then final. At the roofing inspection, the inspector looks at dry-in, insulation, coverings and flashing. Sheathing can be inspected with the dry-in or separately, so ask the permit office how Miami-Dade RER wants it booked.
Permits have clocks. A permit lapses if work does not start within 6 months, or stops for 6 months. Before the first inspection, the Notice of Commencement has to be recorded and posted.
Asphalt shingles can be installed by a builder directly only when the building is its own new construction. Work with tile, metal or membrane must be handled by a certified or registered roofing contractor. Since July 1, 2025, a builder must also warrant a new home for 1 year against code-violating defects.
Questions
New construction roofing in Kendall: questions
Does a new roof in Kendall need a Miami-Dade permit?
Yes. Kendall is an unincorporated census-designated place, so Miami-Dade County Regulatory and Economic Resources issues the permit. The application carries the product approval or Notice of Acceptance numbers for the roofing. Confirm current filing steps with the building office before you schedule the crew, since inspections follow the permit.
Source: Miami-Dade County Regulatory and Economic Resources (RER) - Building & Permits, read Oct 5, 2026
Which Florida Building Code edition applies to a new Kendall roof?
The 2023 Eighth Edition applies now. Plans and permit applications turned in on or after December 31, 2026 have to comply with the Ninth Edition. Because Kendall is in Miami-Dade, the High Velocity Hurricane Zone provisions apply on top of either edition. Your filing date decides which one governs your roof.
Source: Florida Building Commission, 'Setting New Standards for Safety: The Florida Building Code' (2004 publication; wind-speed figures in it are outdated and not used), read Oct 5, 2026
What inspections does a new Kendall home need before the roof is done?
The code order is foundation, framing, sheathing, exterior wall coverings, roofing, then final. Inspectors checking the roof review the dry-in, the insulation, the coverings and the flashing. With 32,492 housing units in Kendall, the county office handles many requests, so book inspections early and confirm the process with Miami-Dade RER.
Source: U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25001, via Census Reporter API, read Oct 5, 2026
Does the builder warranty cover a leaking new roof?
Possibly, within limits. Florida Statute 553.837 requires a builder to warrant a newly built home for 1 year after title transfer or occupancy against defects that materially violate the Florida Building Code. Normal wear and tear is not covered, and neither are natural disasters. In this area the median home was built in 1978, so a roof on a newly built house is the exception, and many owners will be dealing with older structures where this coverage does not apply at all. Read your contract and ask your builder what it covers.
Source: U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25034, via Census Reporter API, read Oct 5, 2026
Nearby
New construction roofing near Kendall
Sources for this page(32)
- 1.Florida Building Commission, 'Setting New Standards for Safety: The Florida Building Code' (2004 publication; wind-speed figures in it are outdated and not used). Read Oct 5, 2026.
- 2.Wikipedia, 'Kendall, Florida' (revision 1374451126). Read Oct 5, 2026.
- 3.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25035, via Census Reporter API. Read Oct 5, 2026.
- 4.Miami-Dade County RER, Board and Code Administration Division, Product Approval. Read Oct 5, 2026.
- 5.Permit office: Miami-Dade County Regulatory and Economic Resources (RER) - Building & Permits. Miami-Dade County Regulatory and Economic Resources (RER) - Building & Permits. Read Oct 10, 2026.
- 6.U.S. Census Bureau, Building Permits Survey county annual files (co2025a.txt, co2020a.txt). Read Oct 5, 2026.
- 7.Share of homes built 2010 or later: 4%. U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25034, via Census Reporter API. Read Oct 5, 2026.
- 8.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25035, B25034, B25024, via Census Reporter API. Read Oct 5, 2026.
- 9.Housing units (ACS 5-year): 32,492. U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25001, via Census Reporter API. Read Oct 5, 2026.
- 10.Median year homes were built: 1978. U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25035, via Census Reporter API. Read Oct 5, 2026.
- 11.FRSA, "New 2023 FBC Eighth Edition is Now in Effect", 2024-02-13. Read Oct 5, 2026.
- 12.Miami-Dade County RER notice. Read Oct 5, 2026.
- 13.FBC-Building 2023 Chapter 2 definitions. Read Oct 5, 2026.
- 14.Florida Statutes, section 553.842 (2026). Read Oct 5, 2026.
- 15.miamidade.gov. Read Oct 5, 2026.
- 16.2023 Florida Building Code, Residential, 8th ed., Chapter 8 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
- 17.2023 Florida Building Code, Building, 8th ed., Chapter 1 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
- 18.2023 Florida Building Code, Residential, 8th ed., Chapter 9 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
- 19.2023 Florida Building Code, Building, 8th ed., Chapter 15 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
- 20.Florida Statutes, section 489.113 (2026). Read Oct 5, 2026.
- 21.Florida Statutes, section 553.837 (2026). Read Oct 5, 2026.
- 22.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25034, via Census Reporter API, U.S. Census Bureau (via Census Reporter). Read Oct 5, 2026.
- 23.Miami-Dade County Regulatory and Economic Resources (RER) - Building & Permits, Miami. Read Oct 5, 2026.
- 24.Florida Statutes, section 713.135 (2026), Florida Legislature. Read Oct 5, 2026.
- 25.NOAA National Hurricane Center, Tropical Cyclone Climatology, NOAA National Hurricane Center. Read Oct 5, 2026.
- 26.NOAA NCEI U.S. Climate Normals 1991-2020 (access data service), NOAA National Centers for Environmental Information. Read Oct 5, 2026.
- 27.NOAA Atlas 14 Volume 9 version 2, partial-duration intensity estimates at the Kendall 2020 Census internal point (25.6673, -80.3528), NOAA Hydrometeorological Design Studies Center. Read Oct 5, 2026.
- 28.NOAA Atlas 14 Volume 9 version 2, partial-duration 24-hour depth estimates at the Kendall 2020 Census internal point (25.6673, -80.3528), NOAA Hydrometeorological Design Studies Center. Read Oct 5, 2026.
- 29.NOAA National Hurricane Center, Tropical Cyclone Report: Hurricane Irma (AL112017), NOAA National Hurricane Center. Read Oct 5, 2026.
- 30.NOAA National Hurricane Center, Tropical Cyclone Report: Hurricane Matthew (AL142016), NOAA National Hurricane Center. Read Oct 5, 2026.
- 31.NOAA National Hurricane Center, Tropical Cyclone Report: Hurricane Dorian (AL052019), NOAA National Hurricane Center. Read Oct 5, 2026.
- 32.Citizens Property Insurance Corporation, inspections FAQ (updated 2026-03-17), Citizens Property Insurance. Read Oct 4, 2026.
South Fork Roofing
New construction roofing in Kendall
Answer a few questions about the job, or call.
