New construction · The Hammocks
New construction roofing in The Hammocks, FL
In The Hammocks, 11.3 percent of homes were built in 2010 or later, so most roofs here are not new. A new roof on a new build still faces Miami-Dade's High Velocity Hurricane Zone rules, and plans filed after December 31, 2026 fall under the Ninth Edition code.
Updated October 2026

Our workCode edition
Which code edition governs a new roof here
The median home in The Hammocks dates to 1991, newer than the county median of 1980. That suggests little vacant land is left, so many new roofs here come with infill builds or teardown replacements. Your permit date decides the code, not your start date.
Plans submitted before December 31, 2026 are reviewed under the Eighth Edition, which has been in force since the last days of 2023. Anything filed on or after that date meets the Ninth Edition. If your submittal lands near the cutoff, ask the county building office which edition applies to you.
Because The Hammocks is a census-designated place outside any city, the county's Regulatory and Economic Resources office handles your permit. Miami-Dade sits in the HVHZ, which adds roofing provisions found in few other Florida counties.
Roof assembly
Deck nailing, underlayment and product approval
Residential code calls for ring shank nails, 2 1/2 inches long, to fasten roof sheathing. For a shingle or metal roof, the dry-in is one of three options. The first option covers the whole deck with a fully self-adhering membrane. Another is a strip of membrane or tape over every deck joint under a second approved underlayment. The third is two fastened layers of felt-type underlayment.
Roofing products need statewide approval, and Miami-Dade's Product Control Section approves or denies them locally. In the HVHZ your permit application lists the approval or Notice of Acceptance numbers. The building official can ask to see the full notice at the site, and notices expire, so check the date on yours.
HVHZ rules also limit low-slope systems on new construction. No loose laid ballasted system is allowed, and the deck slope must be at least 1/4:12. Tile set in mortar or adhesive needs at least 2:12.
Build sequence
Scheduling the roof around inspections
The code sets the inspection sequence as foundation first, then framing, sheathing, exterior wall coverings, roofing, and the final. Dry-in, roof coverings and flashing all fall under the roofing inspection. The sheathing inspection can come first as part of a dry-in check, so do not cover the deck early.
A general contractor may put asphalt shingles on its own new building. Tile, metal and membrane work must go to a roofing contractor holding the roofing certificate or registration. Record the Notice of Commencement and post it at the site before the first inspection, or the owner may end up paying twice.
Questions
New construction roofing in The Hammocks: questions
Does a new home in The Hammocks come with a roof warranty?
Under Fla. Stat. 553.837, a builder must warrant a newly constructed home for 1 year against defects in equipment, material or workmanship that cause a material Florida Building Code violation. The year starts at the earlier of title transfer or first occupancy. Wear and tear, settling, owner-caused defects and acts of God are excluded. In The Hammocks, 11.3 percent of homes were built in 2010 or later, so this rule reaches only the newest ones. Read your sales contract for anything it adds.
Source: U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25034, via Census Reporter API, read Oct 5, 2026
What is the 25% roof rule in Florida?
Repair, replace or recover more than 25 percent of a roof section in 12 months, and the entire section must meet current code. The exception covers a roof built or replaced under the 2007 Florida Building Code or later, where only the repaired part must comply. A roof on a recent Hammocks build would likely qualify, while an original 1991 roof would not. The county building office, which issues permits here, can confirm how it applies.
Source: U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25035, via Census Reporter API, read Oct 5, 2026
Can I use a private inspector on my new roof in The Hammocks?
Often yes. Under Fla. Stat. 553.791, the owner, or the owner's contractor with written authorization, may choose a private provider for plans review or code inspections. Whoever provides this must be a licensed building code administrator, engineer or architect. Miami-Dade County Regulatory and Economic Resources still issues the permit in The Hammocks, so confirm with that office how private provider reports are submitted.
Source: Miami-Dade County Regulatory and Economic Resources (RER) - Building & Permits, read Oct 5, 2026
Do new gutters have to be installed on a new home here?
Buildings whose eaves project less than 6 inches need gutters with downspouts, though gable end rakes and a roof above another roof are exempt. At least 1 foot of distance is required between where each downspout empties and the sidewall. In The Hammocks, 50.7 percent of homes are single-family detached, and many of those have short eaves, so check your plans for this rule.
Source: U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25024, via Census Reporter API, read Oct 5, 2026
Sources for this page(33)
- 1.Median year homes were built: 1991. U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25035, via Census Reporter API. Read Oct 5, 2026.
- 2.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25035, via Census Reporter API. Read Oct 5, 2026.
- 3.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25035, B25034, B25024, via Census Reporter API. Read Oct 5, 2026.
- 4.Permit office: Miami-Dade County Regulatory and Economic Resources (RER) - Building & Permits. Miami-Dade County Regulatory and Economic Resources (RER) - Building & Permits. Read Oct 10, 2026.
- 5.Florida Building Commission, 'Setting New Standards for Safety: The Florida Building Code' (2004 publication; wind-speed figures in it are outdated and not used). Read Oct 5, 2026.
- 6.Miami-Dade County RER, Board and Code Administration Division, Product Approval. Read Oct 5, 2026.
- 7.Share of homes built 2010 or later: 11.3%. U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25034, via Census Reporter API. Read Oct 5, 2026.
- 8.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25024, via Census Reporter API. Read Oct 5, 2026.
- 9.FRSA, "New 2023 FBC Eighth Edition is Now in Effect", 2024-02-13. Read Oct 5, 2026.
- 10.Miami-Dade County RER notice. Read Oct 5, 2026.
- 11.FBC-Building 2023 Chapter 2 definitions. Read Oct 5, 2026.
- 12.2023 Florida Building Code, Residential, 8th ed., Chapter 8 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
- 13.2023 Florida Building Code, Residential, 8th ed., Chapter 9 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
- 14.Florida Statutes, section 553.842 (2026). Read Oct 5, 2026.
- 15.miamidade.gov. Read Oct 5, 2026.
- 16.2023 Florida Building Code, Building, 8th ed., Chapter 15 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
- 17.2023 Florida Building Code, Building, 8th ed., Chapter 1 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
- 18.Florida Statutes, section 489.113 (2026). Read Oct 5, 2026.
- 19.Florida Statutes, section 553.837 (2026). Read Oct 5, 2026.
- 20.Florida Statutes, section 553.791 (2026). Read Oct 5, 2026.
- 21.2023 Florida Building Code, Residential, 8th ed., Chapter 3 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
- 22.2023 Florida Building Code, Residential, 8th ed., R318.5 (UpCodes viewer, unofficial transcription); FBC-Building 1503.7. Read Oct 5, 2026.
- 23.Miami-Dade County Regulatory and Economic Resources (RER) - Building & Permits, Miami. Read Oct 5, 2026.
- 24.Florida Statutes, section 713.135 (2026), Florida Legislature. Read Oct 5, 2026.
- 25.NOAA NCEI U.S. Climate Normals 1991-2020 (access data service), NOAA National Centers for Environmental Information. Read Oct 5, 2026.
- 26.Citizens Property Insurance Corporation, inspections FAQ (updated 2026-03-17), Citizens Property Insurance. Read Oct 4, 2026.
- 27.NOAA NCEI U.S. Climate Normals 1991-2020 (access data service), NOAA National Centers for Environmental Information. Read Oct 5, 2026.
- 28.NOAA National Hurricane Center, Tropical Cyclone Climatology, NOAA National Hurricane Center. Read Oct 5, 2026.
- 29.NOAA Atlas 14 Volume 9 version 2, partial-duration intensity estimates at The Hammocks 2020 Census internal point (25.6704, -80.4489), NOAA Hydrometeorological Design Studies Center. Read Oct 5, 2026.
- 30.NOAA Atlas 14 Volume 9 version 2, partial-duration 24-hour depth estimates at The Hammocks 2020 Census internal point (25.6704, -80.4489), NOAA Hydrometeorological Design Studies Center. Read Oct 5, 2026.
- 31.NOAA National Hurricane Center, Tropical Cyclone Report: Hurricane Irma (AL112017), NOAA National Hurricane Center. Read Oct 5, 2026.
- 32.NOAA National Hurricane Center, Tropical Cyclone Report: Hurricane Dorian (AL052019), NOAA National Hurricane Center. Read Oct 5, 2026.
- 33.Wikipedia, 'The Hammocks, Florida' (revision 1374945370), Wikipedia. Read Oct 5, 2026.