Only 5.5 percent of homes in South Miami Heights were built in 2010 or later, so a new roof here is a rarity. Miami-Dade County issues the permit, and the county sits in the High Velocity Hurricane Zone. Expect strict deck, underlayment and product rules.

Updated October 2026

A roof deck sheathed in red-brown ZIP System panels with black seam tape, a bucket and a ladder on the deck, homes and a street behind.

Code edition

Edition of the building code that governs a new roof in this area

The Eighth Edition of the Florida Building Code became effective on December 31, 2023. The Ninth Edition applies to any permit application or plans submitted on or after December 31, 2026. Where your submittal falls against that date decides which book your roof is built under.

Miami-Dade County shares its High Velocity Hurricane Zone listing with Broward County only. South Miami Heights is unincorporated, so the county building office, not a city, issues your roof permit and sends the inspectors.

Miami-Dade County permitted 2,666 single-family units in 2025, against 2,133 in 2020. That is 533 more. The county is building more, but this area's housing is still old: the median home here dates to 1978.

Roof assembly

Deck, underlayment and product approval

Ring shank nails of 2 1/2 inches by 0.131 inch are what fasten the sheathing on a new home's roof. Your inspector looks at those fasteners before the roof covering goes on. The dry-in step then follows one of three code options for shingle and metal roofs.

  • A self-adhering polymer-modified bitumen underlayment should go over the entire deck.
  • Tape every deck joint with a strip at least 3 3/4 inches wide, then cover the roof with approved underlayment.
  • Lay two layers of felt-type underlayment, fastened 12 inches apart in the field and 6 inches apart at laps.

Statewide, roofing falls into the category of products that must carry a mandatory approval. In Miami-Dade, the Product Control Section approves or denies roofing products, and the roofing permit application carries the approval or Notice of Acceptance numbers. A copy of the full Notice of Acceptance must be on the job site for the building official.

Inspections

Scheduling the roof with the build

The code sets the sequence for inspections, beginning with the foundation and moving through framing, sheathing, exterior wall coverings and roofing, with the final inspection coming last. At the roofing inspection, the inspector looks at the dry-in, the insulation, the roof coverings and the flashing. Book the roofer so the deck is ready the day framing and sheathing pass.

Once 6 months pass after issuance without work beginning, or work halts for 6 months, the permit is no longer valid. Before the first inspection, a Notice of Commencement has to be recorded and also posted. If you own the lot, you pay twice if it is missed.

Installing asphalt shingles without a roofing contractor is allowed for a builder only when the building is its own new construction. A certified or registered roofing contractor is the one who handles tile, metal and membrane. In South Miami Heights, 62.1 percent of occupied homes are owner-occupied, so many buyers deal with this directly.

Questions

New construction roofing in South Miami Heights: questions

How many homes in South Miami Heights are new construction?

Only 5.5 percent of homes here were built in 2010 or later. Miami-Dade County as a whole stands at 11.4 percent. The median home in South Miami Heights was built in 1978, close to the county median of 1980. New builds are a small share of the housing stock, so a new roof is the exception.

Source: U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25003, via Census Reporter API, read Oct 5, 2026

Related: New construction roofing

Who permits a new roof in South Miami Heights?

Miami-Dade County Regulatory and Economic Resources issues the permit, because South Miami Heights is unincorporated. Roofing products need approval, and in the High Velocity Hurricane Zone the application lists the approval or Notice of Acceptance numbers. Confirm current forms with the county building office before you apply.

Source: Miami-Dade County Regulatory and Economic Resources (RER) - Building & Permits, read Oct 5, 2026

Related: New construction roofing

Does a new home come with a builder warranty on the roof?

Since July 1, 2025, Florida Statute 553.837 requires a builder to warrant a new home for 1 year against defects that cause a material Building Code violation. Normal wear and tear, settling, defects the owner caused, and acts of God such as a natural disaster are left out. Read your sales contract for what it adds.

Source: Florida Statutes, section 553.837 (2026), read Oct 5, 2026

Related: New construction roofing

Do new homes here need gutters?

When eaves project less than 6 inches, the code calls for gutters with downspouts, apart from gable end rakes or eaves above another roof. Water from the downspouts must land a foot or more away from the wall. With 65.2 percent of South Miami Heights homes single-family detached, many new roofs fall under this rule.

Source: U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25024, via Census Reporter API, read Oct 5, 2026

Related: New construction roofing

Nearby

New construction roofing near South Miami Heights

Sources for this page(31)
  1. 1.Florida Building Commission, 'Setting New Standards for Safety: The Florida Building Code' (2004 publication; wind-speed figures in it are outdated and not used). Read Oct 5, 2026.
  2. 2.Permit office: Miami-Dade County Regulatory and Economic Resources (RER) - Building & Permits. Miami-Dade County Regulatory and Economic Resources (RER) - Building & Permits. Read Oct 10, 2026.
  3. 3.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25035, via Census Reporter API. Read Oct 5, 2026.
  4. 4.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25024, via Census Reporter API. Read Oct 5, 2026.
  5. 5.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25003, via Census Reporter API. Read Oct 5, 2026.
  6. 6.U.S. Census Bureau, Building Permits Survey county annual files (co2025a.txt, co2020a.txt). Read Oct 5, 2026.
  7. 7.Median year homes were built: 1978. U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25035, via Census Reporter API. Read Oct 5, 2026.
  8. 8.Miami-Dade County RER, Board and Code Administration Division, Product Approval. Read Oct 5, 2026.
  9. 9.Share of homes built 2010 or later: 5.5%. U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25034, via Census Reporter API. Read Oct 5, 2026.
  10. 10.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25035, B25034, B25024, via Census Reporter API. Read Oct 5, 2026.
  11. 11.FRSA, "New 2023 FBC Eighth Edition is Now in Effect", 2024-02-13. Read Oct 5, 2026.
  12. 12.Miami-Dade County RER notice. Read Oct 5, 2026.
  13. 13.FBC-Building 2023 Chapter 2 definitions. Read Oct 5, 2026.
  14. 14.2023 Florida Building Code, Residential, 8th ed., Chapter 8 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
  15. 15.2023 Florida Building Code, Residential, 8th ed., Chapter 9 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
  16. 16.Florida Statutes, section 553.842 (2026). Read Oct 5, 2026.
  17. 17.miamidade.gov. Read Oct 5, 2026.
  18. 18.2023 Florida Building Code, Building, 8th ed., Chapter 1 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
  19. 19.Florida Statutes, section 489.113 (2026). Read Oct 5, 2026.
  20. 20.Florida Statutes, section 553.837 (2026). Read Oct 5, 2026.
  21. 21.2023 Florida Building Code, Residential, 8th ed., Chapter 3 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
  22. 22.Miami-Dade County Regulatory and Economic Resources (RER) - Building & Permits, Miami. Read Oct 5, 2026.
  23. 23.Florida Statutes, section 713.135 (2026), Florida Legislature. Read Oct 5, 2026.
  24. 24.Florida Statutes, section 627.7011 (2026), Florida Legislature. Read Oct 4, 2026.
  25. 25.2023 Florida Building Code, Building, 8th ed., Chapter 15 (UpCodes viewer, unofficial transcription), UpCodes (Florida Building Code transcription). Read Oct 5, 2026.
  26. 26.NOAA National Hurricane Center, Tropical Cyclone Report: Hurricane Irma (AL112017), NOAA National Hurricane Center. Read Oct 5, 2026.
  27. 27.NOAA National Hurricane Center, Tropical Cyclone Climatology, NOAA National Hurricane Center. Read Oct 5, 2026.
  28. 28.NOAA NCEI U.S. Climate Normals 1991-2020 (access data service), NOAA National Centers for Environmental Information. Read Oct 5, 2026.
  29. 29.NOAA NCEI U.S. Climate Normals 1991-2020 (access data service), NOAA National Centers for Environmental Information. Read Oct 5, 2026.
  30. 30.NOAA Atlas 14 Volume 9 version 2, partial-duration intensity estimates at the South Miami Heights 2020 Census internal point (25.5883, -80.3868), NOAA Hydrometeorological Design Studies Center. Read Oct 5, 2026.
  31. 31.NOAA Atlas 14 Volume 9 version 2, partial-duration 24-hour depth estimates at the South Miami Heights 2020 Census internal point (25.5883, -80.3868), NOAA Hydrometeorological Design Studies Center. Read Oct 5, 2026.

South Fork Roofing

New construction roofing in South Miami Heights

Answer a few questions about the job, or call.

CallFree estimate