Skip to content

New construction · West Perrine

New construction roofing in West Perrine, FL

Only 8.7 percent of West Perrine homes were built in 2010 or later, so a new roof here is a rare job. Miami-Dade County permits it, and the county sits in the High Velocity Hurricane Zone. That sets the product, deck and inspection rules your builder must follow.

Updated October 2026

A roof deck sheathed in red-brown ZIP System panels with black seam tape, a bucket and a ladder on the deck, homes and a street behind.

West Perrine figures this page uses

Housing units (ACS 5-year)
3,565
Median year homes were built
1975
Share of homes built 2010 or later
8.7%

Local growth

New homes in an older West Perrine housing stock

West Perrine counts 3,565 housing units, and the median home dates to 1975. By our arithmetic, new construction is a thin slice here: 8.7 percent of homes against 11.4 percent across Miami-Dade County. Most of the county's building is happening elsewhere. The county permitted 2,666 single-family units in 2025, up from 2,133 in 2020.

That mix affects your schedule. A new roof in West Perrine goes through Miami-Dade County Regulatory and Economic Resources, since West Perrine is unincorporated and the county building office issues the permits. The permit application in the High Velocity Hurricane Zone carries the product approval or Notice of Acceptance numbers for each roofing product, plus the owner's notification.

Code and products

Which code edition and product rules apply

The date your builder files decides the code book. A West Perrine application filed on December 31, 2026 or later is reviewed under the Ninth Edition. One filed earlier is reviewed under the 2023 Eighth Edition. Ask which date your application carries, because roof details can change between editions.

Miami-Dade's Product Control Section approves or denies roofing products and certifies the testing labs. A current Notice of Acceptance must be available for inspection at the job site if the building official asks for it. Check the expiration date on each one, because a notice is not valid after it expires.

Build sequence

Deck, underlayment and inspection order on a new roof

On a West Perrine new build, the roof deck is nailed with ring shank nails measuring 2 1/2 inches. Before shingles or metal go on, the dry-in follows one of three paths. A self-adhering membrane can cover the entire deck. Tape or membrane strips can seal each deck joint under approved underlayment. Two fastened layers of felt-type underlayment is the third path.

  • Foundation
  • Framing, once trusses, bracing and connectors are in
  • Replacing the sheathing can be bundled with the dry-in or priced as its own line item.
  • Exterior wall coverings and soffit in progress
  • Roofing: dry-in, insulation, coverings and flashing
  • Final

Schedule the roofer to follow the sheathing inspection, not to beat it. Keep the permit moving too: it becomes invalid if work does not start within 6 months of issuance.

Questions

New construction roofing in West Perrine: questions

Who issues a new construction roofing permit in West Perrine?

The permit comes from Miami-Dade County Regulatory and Economic Resources, through its Building & Permits division. West Perrine is a census-designated place with no city government of its own, so the county building office handles permits. Because the county is in the High Velocity Hurricane Zone, the application lists the product approval or Notice of Acceptance numbers for the roofing products. Confirm current filing steps with the county building office before your builder submits.

Source: Miami-Dade County Regulatory and Economic Resources (RER) - Building & Permits, read Oct 5, 2026

Related: New construction roofing

Can my general contractor install the shingles on my new West Perrine home?

Only in one case. Under Fla. Stat. 489.113(3)(b), a general, building or residential contractor may install asphalt or fiberglass shingles, or wood shingles and shakes, itself on a new building of its own construction. In Miami-Dade County, which sits in the High Velocity Hurricane Zone, tile, metal and membrane roofs still go to a certified or registered roofing contractor. A general contractor may not advertise as a roofer without that roofing license, so ask who is actually doing the work.

Source: Florida Building Commission, 'Setting New Standards for Safety: The Florida Building Code' (2004 publication; wind-speed figures in it are outdated and not used), read Oct 5, 2026

Related: New construction roofing

Does a new home in West Perrine come with a builder warranty on the roof?

For homes conveyed or first occupied after July 1, 2025, Fla. Stat. 553.837 requires the builder to warrant a newly constructed home for 1 year against defects in equipment, material or workmanship that cause a material violation of the Florida Building Code. Normal wear and tear, settling, defects the owner caused and acts of God such as a natural disaster fall outside what it covers. Read your contract for the exact coverage.

Source: Florida Statutes, section 553.837 (2026), read Oct 5, 2026

Related: New construction roofing

Do new West Perrine homes need gutters?

Often yes. Under the Florida Building Code, gutters with downspouts are required on buildings with eaves projecting less than 6 inches, except at gable end rakes or on a roof above another roof. A downspout should discharge at least 1 foot clear of the sidewall, so the water lands away from the house. With 56.5 percent of West Perrine homes single-family detached, eave depth on your plans decides whether the rule applies to your new home.

Source: U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25024, via Census Reporter API, read Oct 5, 2026

Related: New construction roofing

Nearby

New construction roofing near West Perrine

Sources for this page(31)
  1. 1.Housing units (ACS 5-year): 3,565. U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25001, via Census Reporter API. Read Oct 5, 2026.
  2. 2.Median year homes were built: 1975. U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25035, via Census Reporter API. Read Oct 5, 2026.
  3. 3.Share of homes built 2010 or later: 8.7%. U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25034, via Census Reporter API. Read Oct 5, 2026.
  4. 4.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25035, B25034, B25024, via Census Reporter API. Read Oct 5, 2026.
  5. 5.U.S. Census Bureau, Building Permits Survey county annual files (co2025a.txt, co2020a.txt). Read Oct 5, 2026.
  6. 6.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25035, via Census Reporter API. Read Oct 5, 2026.
  7. 7.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25034, via Census Reporter API. Read Oct 5, 2026.
  8. 8.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25024, via Census Reporter API. Read Oct 5, 2026.
  9. 9.Permit office: Miami-Dade County Regulatory and Economic Resources (RER) - Building & Permits. Miami-Dade County Regulatory and Economic Resources (RER) - Building & Permits. Read Oct 10, 2026.
  10. 10.Miami-Dade County RER, Board and Code Administration Division, Product Approval. Read Oct 5, 2026.
  11. 11.Florida Building Commission, 'Setting New Standards for Safety: The Florida Building Code' (2004 publication; wind-speed figures in it are outdated and not used). Read Oct 5, 2026.
  12. 12.Florida Statutes, section 553.842 (2026). Read Oct 5, 2026.
  13. 13.FBC-Building 2023 Chapter 2 definitions. Read Oct 5, 2026.
  14. 14.FRSA, "New 2023 FBC Eighth Edition is Now in Effect", 2024-02-13. Read Oct 5, 2026.
  15. 15.Miami-Dade County RER notice. Read Oct 5, 2026.
  16. 16.miamidade.gov. Read Oct 5, 2026.
  17. 17.2023 Florida Building Code, Residential, 8th ed., Chapter 8 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
  18. 18.2023 Florida Building Code, Residential, 8th ed., Chapter 9 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
  19. 19.2023 Florida Building Code, Building, 8th ed., Chapter 1 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
  20. 20.Florida Statutes, section 489.113 (2026). Read Oct 5, 2026.
  21. 21.Florida Statutes, section 553.837 (2026). Read Oct 5, 2026.
  22. 22.2023 Florida Building Code, Residential, 8th ed., Chapter 3 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
  23. 23.Miami-Dade County Regulatory and Economic Resources (RER) - Building & Permits, Miami. Read Oct 5, 2026.
  24. 24.Florida Statutes, section 627.7011 (2026), Florida Legislature. Read Oct 4, 2026.
  25. 25.2023 Florida Building Code, Building, 8th ed., Chapter 15 (UpCodes viewer, unofficial transcription), UpCodes (Florida Building Code transcription). Read Oct 5, 2026.
  26. 26.NOAA National Hurricane Center, Tropical Cyclone Report: Hurricane Irma (AL112017), NOAA National Hurricane Center. Read Oct 5, 2026.
  27. 27.NOAA National Hurricane Center, Tropical Cyclone Climatology, NOAA National Hurricane Center. Read Oct 5, 2026.
  28. 28.NOAA NCEI U.S. Climate Normals 1991-2020 (access data service), NOAA National Centers for Environmental Information. Read Oct 5, 2026.
  29. 29.NOAA Atlas 14 Volume 9 version 2, partial-duration 24-hour depth estimates at the West Perrine 2020 Census internal point (25.6061, -80.3639), NOAA Hydrometeorological Design Studies Center. Read Oct 5, 2026.
  30. 30.NOAA Atlas 14 Volume 9 version 2, partial-duration intensity estimates at the West Perrine 2020 Census internal point (25.6061, -80.3639), NOAA Hydrometeorological Design Studies Center. Read Oct 5, 2026.
  31. 31.NOAA NCEI U.S. Climate Normals 1991-2020 (access data service), NOAA National Centers for Environmental Information. Read Oct 5, 2026.

South Fork Roofing

New construction roofing in West Perrine

Answer a few questions about the job, or call.

CallFree estimate