Skip to content

New construction · North Miami

New construction roofing in North Miami, FL

Only 5.2 percent of North Miami homes were built in 2010 or later, so a new roof here is a rare job. Miami-Dade County sits in the High Velocity Hurricane Zone. Your new roof needs approved products, a permit from the North Miami Building Department and a string of inspections.

Updated October 2026

Gray concrete modernist government building with palm trees and a traffic signal arm in the foreground.
A roof deck sheathed in red-brown ZIP System panels with black seam tape, a bucket and a ladder on the deck, homes and a street behind.Our work
Photo: North Miami FL city hall01 by Ebyabe, CC BY-SA 3.0, cropped

North Miami figures this page uses

Housing units (ACS 5-year)
21,956
Median year homes were built
1967
Share of homes built 2010 or later
5.2%

Local context

New homes in an older city

North Miami has 21,956 housing units, and the median home was built in 1967. County homes run newer, with a median of 1980. In a city where 79.4 percent of units predate 1980, a ground-up roof is uncommon, and most roofing work here is replacement.

Across Miami-Dade County, 2,666 single-family units were permitted in 2025, up from 2,133 in 2020. Permits for new buildings with 5 or more units reached 13,292 that year. Your roof competes for crew time with a busy county, so book the roofer early.

Rules for new roofs

Code edition and product approval

Two code editions matter for a North Miami build. The Eighth Edition took effect on the last day of 2023. The Ninth Edition governs any application filed on or after December 31, 2026. If your plans land near that date, ask the building department which edition your submittal falls under.

Roofing is a mandatory statewide-approval product category. Miami-Dade's Product Control Section reviews roofing systems and issues Notices of Acceptance. The uniform roofing permit application carries those approval numbers, and a copy of the entire notice must be available at the job site for the building official.

Low-slope roofs in the HVHZ have their own rules. Loose laid ballasted systems are not permitted, and new construction needs a minimum deck slope of 1/4:12. Standing seam metal panels must pass the ASTM E2140 leakage test to a slope of 1:12.

Build sequence

Deck, underlayment and inspections

Roof sheathing on a new home must be fastened with ring shank nails measuring 2 1/2 inches by 0.131 inch, with a 0.281 inch head. For shingle or metal roofs, the dry-in follows one of three methods. One is full-deck self-adhering membrane. Another is tape over every deck joint, then underlayment. The third is two layers of felt underlayment with cap nails.

  • Framing inspection, with trusses and connectors in place
  • Sheathing inspection, covering deck fasteners and dry-in
  • Roofing inspection: dry-in, coverings and flashing
  • Final inspection

Who installs matters. A builder may put on asphalt shingles itself only on a new building of its own construction. Anything else, such as tile, metal or membrane, goes to a roofing contractor holding state certification or registration. The Notice of Commencement must be recorded and posted before your first North Miami inspection.

Questions

New construction roofing in North Miami: questions

Which code edition applies to a new roof permit in North Miami?

The timing hinges on the date you submit your permit application. The 2023 code, the Eighth Edition, is in force now. Applications filed on or after December 31, 2026 must meet the Ninth Edition instead. North Miami also sits in Miami-Dade County, which is in the High Velocity Hurricane Zone, so the HVHZ provisions apply on top of the base code. Confirm the edition with the City of North Miami Building Department before you submit plans.

Source: FRSA, "New 2023 FBC Eighth Edition is Now in Effect", 2024-02-13, read Oct 5, 2026

Related: New construction roofing

Does a new home in North Miami need an approved roofing product?

Yes. Statewide product approval is mandatory for roofing. In Miami-Dade County, the Product Control Section approves or denies roofing systems and certifies the labs that test them. The roofing permit application carries the product approval or Notice of Acceptance numbers. A notice is not valid after its expiration date, so check that the one listed for your roof is current.

Source: Miami-Dade County RER, Board and Code Administration Division, Product Approval, read Oct 5, 2026

Related: New construction roofing

What builder warranty applies to a new North Miami home?

Florida law, in effect since July 1, 2025, makes the builder warrant a new home for 1 year against defects in equipment, material or workmanship that cause a material code violation. The clock starts at the first of title transfer or initial occupancy. Wear and tear, settling, owner-caused defects and natural disasters fall outside it. With only 5.2 percent of North Miami homes built since 2010, few buyers here will see this rule, so read your contract closely.

Source: Florida Statutes, section 553.837 (2026), read Oct 5, 2026

Related: New construction roofing

Do new homes in North Miami need gutters?

Often, yes. The residential code requires gutters with downspouts on buildings whose eaves project less than 6 inches. Gable end rakes and roofs above another roof are exceptions. Each downspout needs to release water no less than 1 foot away from the sidewall. Ask the building department whether your plans meet this rule for the eave design you chose.

Source: 2023 Florida Building Code, Residential, 8th ed., Chapter 3 (UpCodes viewer, unofficial transcription), read Oct 5, 2026

Related: New construction roofing

Sources for this page(33)
  1. 1.Housing units (ACS 5-year): 21,956. U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25001, via Census Reporter API. Read Oct 5, 2026.
  2. 2.Median year homes were built: 1967. U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25035, via Census Reporter API. Read Oct 5, 2026.
  3. 3.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25035, via Census Reporter API. Read Oct 5, 2026.
  4. 4.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25034, via Census Reporter API. Read Oct 5, 2026.
  5. 5.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25035, B25034, B25024, via Census Reporter API. Read Oct 5, 2026.
  6. 6.U.S. Census Bureau, Building Permits Survey county annual files (co2025a.txt, co2020a.txt). Read Oct 5, 2026.
  7. 7.Permit office: City of North Miami - Building Department. City of North Miami - Building Department. Read Oct 10, 2026.
  8. 8.Miami-Dade County RER, Board and Code Administration Division, Product Approval. Read Oct 5, 2026.
  9. 9.Florida Building Commission, 'Setting New Standards for Safety: The Florida Building Code' (2004 publication; wind-speed figures in it are outdated and not used). Read Oct 5, 2026.
  10. 10.Share of homes built 2010 or later: 5.2%. U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25034, via Census Reporter API. Read Oct 5, 2026.
  11. 11.FRSA, "New 2023 FBC Eighth Edition is Now in Effect", 2024-02-13. Read Oct 5, 2026.
  12. 12.Miami-Dade County RER notice. Read Oct 5, 2026.
  13. 13.Florida Statutes, section 553.842 (2026). Read Oct 5, 2026.
  14. 14.miamidade.gov. Read Oct 5, 2026.
  15. 15.2023 Florida Building Code, Building, 8th ed., Chapter 15 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
  16. 16.2023 Florida Building Code, Residential, 8th ed., Chapter 8 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
  17. 17.2023 Florida Building Code, Residential, 8th ed., Chapter 9 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
  18. 18.2023 Florida Building Code, Building, 8th ed., Chapter 1 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
  19. 19.Florida Statutes, section 489.113 (2026). Read Oct 5, 2026.
  20. 20.FBC-Building 2023 Chapter 2 definitions. Read Oct 5, 2026.
  21. 21.Florida Statutes, section 553.837 (2026). Read Oct 5, 2026.
  22. 22.2023 Florida Building Code, Residential, 8th ed., Chapter 3 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
  23. 23.2023 Florida Building Code, Residential, 8th ed., R318.5 (UpCodes viewer, unofficial transcription); FBC-Building 1503.7. Read Oct 5, 2026.
  24. 24.City of North Miami - Building Department, City of North Miami. Read Oct 5, 2026.
  25. 25.Florida Statutes, section 713.135 (2026), Florida Legislature. Read Oct 5, 2026.
  26. 26.Citizens Property Insurance Corporation, inspections FAQ (updated 2026-03-17), Citizens Property Insurance. Read Oct 4, 2026.
  27. 27.Fla. Stat. 489.105(3)(e), Florida Legislature. Read Oct 5, 2026.
  28. 28.NOAA NCEI U.S. Climate Normals 1991-2020 (access data service), NOAA National Centers for Environmental Information. Read Oct 5, 2026.
  29. 29.NOAA NCEI U.S. Climate Normals 1991-2020 (access data service), NOAA National Centers for Environmental Information. Read Oct 5, 2026.
  30. 30.NOAA Atlas 14 Volume 9 version 2, partial-duration intensity estimates at the North Miami 2020 Census internal point (25.9008, -80.1685), NOAA Hydrometeorological Design Studies Center. Read Oct 5, 2026.
  31. 31.NOAA National Hurricane Center, Tropical Cyclone Climatology, NOAA National Hurricane Center. Read Oct 5, 2026.
  32. 32.NOAA National Hurricane Center, Tropical Cyclone Report: Hurricane Irma (AL112017), NOAA National Hurricane Center. Read Oct 5, 2026.
  33. 33.Wikipedia, 'North Miami, Florida' (revision 1378595981), Wikipedia. Read Oct 5, 2026.

South Fork Roofing

New construction roofing in North Miami

Answer a few questions about the job, or call.

CallFree estimate