New construction ยท Biscayne Gardens
New construction roofing in Biscayne Gardens, FL
Only 2.5 percent of homes in Biscayne Gardens were built in 2010 or later, according to Census estimates. That means most new roofing work here is a replacement on an older house, not a roof on a fresh build. New construction still happens, though. The county permitted 2,666 single-family units in 2025, and that figure rose from 2,133 in 2020.
Updated October 2026

Code timing
Which code edition your new permit will face
Biscayne Gardens is unincorporated, so the Miami-Dade County building office issues the roof permit. As of now, the Eighth Edition of the 2023 Florida Building Code governs the work. The Ninth Edition takes effect December 31, 2026, and any application submitted on or after that date must follow it. A builder that files in early 2026 and stalls past that date may face the newer rules.
Miami-Dade sits in the High-Velocity Hurricane Zone, so the stricter provisions apply to any new roof here. Low-slope roofs must meet a minimum deck slope of one-quarter inch per foot, and loose-laid ballasted systems are not allowed.
Materials and sign-off
Before any new roof goes on, the deck, the underlayment and the product approval each have to meet a set of standards
The inspector will look for one of three dry-in methods before the roof covering goes on. The simplest is a fully self-adhering polymer-modified bitumen underlayment over the whole deck. The other two use taped joints under an approved underlayment, or two layers of felt fastened to a set spacing with ring or deformed shank caps.
Every roofing product must carry a Miami-Dade Notice of Acceptance number on the permit application. Check the number against the county's Product Control listing before the materials arrive, and keep a copy of the NOA on site for the building official to see.
- Schedule the roof after framing and roof sheathing pass the framing inspection.
- Confirm the drip edge fastening spacing matches the wind speed for your lot.
- Verify gutters and downspouts discharge at least 1 foot from the wall.
Questions
New construction roofing in Biscayne Gardens: questions
Do I need a new permit for a roof on a new home in Biscayne Gardens?
Yes. Roofing work requires a permit from the Miami-Dade County building office, which handles Biscayne Gardens because it is unincorporated. The permit must cite the product approval numbers for the roofing system. The inspection sequence puts the roofing inspection after framing and sheathing, so the roof cannot be covered until those earlier inspections pass. Confirm the current application steps with the building office before filing.
Source: Miami-Dade County Regulatory and Economic Resources (RER) - Building & Permits, read Oct 5, 2026
Which building code applies to a new roof in Biscayne Gardens?
Right now, the Eighth Edition of the 2023 Florida Building Code is the one that applies. Any application filed on or after December 31, 2026 has to meet the Ninth Edition. Miami-Dade is in the High-Velocity Hurricane Zone, so the stricter provisions govern roof decks, underlayment and fastening. Ask the building office which edition applies to your filing date.
Source: FRSA, "New 2023 FBC Eighth Edition is Now in Effect", 2024-02-13, read Oct 5, 2026
Can a general contractor install shingles on a new house in Biscayne Gardens?
Asphalt or fiberglass shingles may be put on by a general contractor only when that contractor built the structure. Many homes in Biscayne Gardens were built around 1965, so a roof replacement on an older home is typically handled by a roofing specialist. Tile, metal and membrane roofing must go to a roofing contractor certified or registered under Florida law. Ask the contractor for the roofing certificate or registration number and check it with the state before work begins.
Source: Florida Statutes, section 489.113 (2026), read Oct 5, 2026
What warranty does a builder owe on the roof of a new home in Florida?
Under Florida Statute 553.837, a builder must cover construction defects in equipment, material or workmanship that cause a material violation of the Florida Building Code, for one year after the owner receives title or occupies the home, whichever comes first. Coverage does not extend to ordinary wear, settling, defects caused by the owner, or natural disasters. Many homes in the area were built around 1965, so newer construction stands apart from much of the older housing stock. Go over your purchase agreement, and request a written explanation of the builder's coverage.
Source: Florida Statutes, section 553.837 (2026), read Oct 5, 2026
Nearby
New construction roofing near Biscayne Gardens
Sources for this page(30)
- 1.Permit office: Miami-Dade County Regulatory and Economic Resources (RER) - Building & Permits. Miami-Dade County Regulatory and Economic Resources (RER) - Building & Permits. Read Oct 10, 2026.
- 2.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25035, via Census Reporter API. Read Oct 5, 2026.
- 3.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25034, via Census Reporter API. Read Oct 5, 2026.
- 4.Florida Building Commission, 'Setting New Standards for Safety: The Florida Building Code' (2004 publication; wind-speed figures in it are outdated and not used). Read Oct 5, 2026.
- 5.Miami-Dade County RER, Board and Code Administration Division, Product Approval. Read Oct 5, 2026.
- 6.Share of homes built 2010 or later: 2.5%. U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25034, via Census Reporter API. Read Oct 5, 2026.
- 7.U.S. Census Bureau, Building Permits Survey county annual files (co2025a.txt, co2020a.txt). Read Oct 5, 2026.
- 8.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25035, B25034, B25024, via Census Reporter API. Read Oct 5, 2026.
- 9.Median year homes were built: 1965. U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25035, via Census Reporter API. Read Oct 5, 2026.
- 10.FRSA, "New 2023 FBC Eighth Edition is Now in Effect", 2024-02-13. Read Oct 5, 2026.
- 11.Miami-Dade County RER notice. Read Oct 5, 2026.
- 12.FBC-Building 2023 Chapter 2 definitions. Read Oct 5, 2026. FBC text read from UpCodes (unofficial transcription): check floridabuilding.org or the ICC viewer before quoting (spec 8.7).
- 13.2023 Florida Building Code, Building, 8th ed., Chapter 15 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026. FBC text read from UpCodes (unofficial transcription): check floridabuilding.org or the ICC viewer before quoting (spec 8.7). Source URL inherited from C-14 (the research cites it "as C-14").
- 14.2023 Florida Building Code, Residential, 8th ed., Chapter 9 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026. FBC text read from UpCodes (unofficial transcription): check floridabuilding.org or the ICC viewer before quoting (spec 8.7). Source URL inherited from COM-29 (the research cites it "as COM-29").
- 15.2023 Florida Building Code, Residential, 8th ed., Chapter 8 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026. FBC text read from UpCodes (unofficial transcription): check floridabuilding.org or the ICC viewer before quoting (spec 8.7).
- 16.Florida Statutes, section 553.842 (2026). Read Oct 5, 2026.
- 17.miamidade.gov. Read Oct 5, 2026.
- 18.2023 Florida Building Code, Building, 8th ed., Chapter 1 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026. FBC text read from UpCodes (unofficial transcription): check floridabuilding.org or the ICC viewer before quoting (spec 8.7). Source URL inherited from C-3 (the research cites it "as C-3").
- 19.2023 Florida Building Code, Residential, 8th ed., Chapter 3 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026. FBC text read from UpCodes (unofficial transcription): check floridabuilding.org or the ICC viewer before quoting (spec 8.7).
- 20.Florida Statutes, section 489.113 (2026). Read Oct 5, 2026.
- 21.Florida Statutes, section 553.837 (2026). Read Oct 5, 2026.
- 22.Miami-Dade County Regulatory and Economic Resources (RER) - Building & Permits, Miami. Read Oct 5, 2026.
- 23.Florida Statutes, section 627.7011 (2026), Florida Legislature. Read Oct 5, 2026.
- 24.NOAA National Hurricane Center, Tropical Cyclone Report: Hurricane Irma (AL112017), NOAA National Hurricane Center. Read Oct 5, 2026.
- 25.NOAA NCEI U.S. Climate Normals 1991-2020 (access data service), NOAA National Centers for Environmental Information. Read Oct 5, 2026.
- 26.NOAA NCEI U.S. Climate Normals 1991-2020 (access data service), NOAA National Centers for Environmental Information. Read Oct 5, 2026.
- 27.NOAA National Hurricane Center, Tropical Cyclone Climatology, NOAA National Hurricane Center. Read Oct 5, 2026.
- 28.NOAA Atlas 14 Volume 9 version 2, partial-duration intensity estimates at the Biscayne Gardens 2020 Census internal point (25.9130, -80.2007), NOAA Hydrometeorological Design Studies Center. Read Oct 5, 2026.
- 29.NOAA Atlas 14 Volume 9 version 2, partial-duration 24-hour depth estimates at the Biscayne Gardens 2020 Census internal point (25.9130, -80.2007), NOAA Hydrometeorological Design Studies Center. Read Oct 5, 2026.
- 30.Wikipedia, 'Biscayne Gardens, Florida' (revision 1374140430), Wikipedia. Read Oct 5, 2026.
South Fork Roofing
New construction roofing in Biscayne Gardens
Answer a few questions about the job, or call.