New construction · Pinewood
New construction roofing in Pinewood, FL
Only 4.4 percent of homes in Pinewood were built in 2010 or later, so new construction is a small part of the housing here. A new roof in this part of Miami-Dade County is permitted by the county, and it must meet the High Velocity Hurricane Zone rules.
Updated October 2026

Permits and code
Which code edition and which office
No city hall handles roofs in Pinewood. The place is unincorporated, so you apply through the Building & Permits office of Miami-Dade County Regulatory and Economic Resources. Confirm the current submittal steps with that office before you schedule any work.
Miami-Dade is one of two counties in the High Velocity Hurricane Zone, which carries stricter roof provisions than most of Florida. Applications filed before December 31, 2026 fall under the Eighth Edition, which took effect at the end of 2023. Filings on or after that date fall under the Ninth Edition.
Permits also expire if the build stalls. Work must start within 6 months of issue, and a gap of 6 months with no work voids the permit. A stalled lot in Pinewood would need a new permit.
What goes on
Deck, underlayment and product approval
Roof sheathing must be nailed with ring shank nails, 2 1/2 inches long. Then the roof is dried in. A shingle or metal roof can use a self-adhering membrane over the whole deck, tape over every deck joint plus underlayment, or two layers of felt underlayment.
Roofing products need approval. Miami-Dade's Product Control Section approves or denies roofing systems, and the permit application in the High Velocity Hurricane Zone lists the product approval numbers. Keep a copy of the Notice of Acceptance on the job site for the inspector.
A new low-slope deck in the zone needs a slope of at least 1/4:12. Loose laid roof systems are not allowed.
Inspections
Scheduling the roof with the build
Inspectors visit in sequence: foundation, framing, sheathing, exterior wall coverings, roofing, final. The roofing visit looks at dry-in, roof coverings and flashing. In Pinewood, with only 4.4 percent of homes built since 2010, the county inspectors see few new roofs, so book each stage early.
For asphalt shingles, a general builder may do the work only on a new building of its own construction. A roofing contractor must hold a state certificate or registration before working on tile, metal or membrane roofs.
Before the first inspection, the Notice of Commencement must be recorded and posted at the site. According to the permit card, leaving it out may leave you paying twice for the same improvements.
Questions
New construction roofing in Pinewood: questions
How new are homes in Pinewood?
Most Pinewood homes are old. The median year built is 1963, against 1980 for Miami-Dade County, and 76.1 percent of units were built before 1980. Only 4.4 percent date from 2010 or later. That means a new build here is uncommon, and neighbors' roofs were likely built under earlier code rules than yours will be.
Source: U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25024, via Census Reporter API, read Oct 5, 2026
Who issues the roof permit for a new house in Pinewood?
Miami-Dade County Regulatory and Economic Resources, Building & Permits, issues permits because Pinewood is an unincorporated census-designated place. A private provider may do plans review or inspections if the owner gives written authorization. Confirm the current steps with the county building office before you apply.
Source: Miami-Dade County Regulatory and Economic Resources (RER) - Building & Permits, read Oct 5, 2026
Does a new roof in Pinewood need an approved product?
Yes. Roofing is a statewide approval category, and Miami-Dade's Product Control Section reviews roofing systems. In the High Velocity Hurricane Zone the permit application carries the approval numbers. Once its expiration date has passed, a Notice of Acceptance no longer counts, and the Building Official needs to be able to see a copy at the job site.
Source: Miami-Dade County RER, Board and Code Administration Division, Product Approval, read Oct 5, 2026
Does a new Pinewood home come with a builder warranty on defects?
Under Florida Statute 553.837, since July 1, 2025 a builder must warrant a newly built home for 1 year against defects in equipment, material or workmanship that violate the Florida Building Code. Wear and tear, settling, defects caused by the owner and natural disasters all fall outside its coverage. Read your contract for the rest.
Source: Florida Statutes, section 553.837 (2026), read Oct 5, 2026
Sources for this page(30)
- 1.Permit office: Miami-Dade County Regulatory and Economic Resources (RER) - Building & Permits. Miami-Dade County Regulatory and Economic Resources (RER) - Building & Permits. Read Oct 10, 2026.
- 2.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25035, via Census Reporter API. Read Oct 5, 2026.
- 3.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25034, via Census Reporter API. Read Oct 5, 2026.
- 4.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25024, via Census Reporter API. Read Oct 5, 2026.
- 5.Florida Building Commission, 'Setting New Standards for Safety: The Florida Building Code' (2004 publication; wind-speed figures in it are outdated and not used). Read Oct 5, 2026.
- 6.Miami-Dade County RER, Board and Code Administration Division, Product Approval. Read Oct 5, 2026.
- 7.Share of homes built 2010 or later: 4.4%. U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25034, via Census Reporter API. Read Oct 5, 2026.
- 8.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25035, B25034, B25024, via Census Reporter API. Read Oct 5, 2026.
- 9.Median year homes were built: 1963. U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25035, via Census Reporter API. Read Oct 5, 2026.
- 10.U.S. Census Bureau, Building Permits Survey county annual files (co2025a.txt, co2020a.txt). Read Oct 5, 2026.
- 11.FRSA, "New 2023 FBC Eighth Edition is Now in Effect", 2024-02-13. Read Oct 5, 2026.
- 12.Miami-Dade County RER notice. Read Oct 5, 2026.
- 13.2023 Florida Building Code, Building, 8th ed., Chapter 1 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
- 14.2023 Florida Building Code, Residential, 8th ed., Chapter 8 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
- 15.2023 Florida Building Code, Residential, 8th ed., Chapter 9 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
- 16.Florida Statutes, section 553.842 (2026). Read Oct 5, 2026.
- 17.miamidade.gov. Read Oct 5, 2026.
- 18.2023 Florida Building Code, Building, 8th ed., Chapter 15 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
- 19.Florida Statutes, section 489.113 (2026). Read Oct 5, 2026.
- 20.Florida Statutes, section 553.791 (2026). Read Oct 5, 2026.
- 21.Florida Statutes, section 553.837 (2026). Read Oct 5, 2026.
- 22.Miami-Dade County Regulatory and Economic Resources (RER) - Building & Permits, Miami. Read Oct 5, 2026.
- 23.Florida Statutes, section 713.135 (2026), Florida Legislature. Read Oct 5, 2026.
- 24.Florida Statutes, section 627.7011 (2026), Florida Legislature. Read Oct 4, 2026.
- 25.NOAA NCEI U.S. Climate Normals 1991-2020 (access data service), NOAA National Centers for Environmental Information. Read Oct 5, 2026.
- 26.NOAA NCEI U.S. Climate Normals 1991-2020 (access data service), NOAA National Centers for Environmental Information. Read Oct 5, 2026.
- 27.NOAA National Hurricane Center, Tropical Cyclone Climatology, NOAA National Hurricane Center. Read Oct 5, 2026.
- 28.NOAA Atlas 14 Volume 9 version 2, partial-duration 24-hour depth estimates at the Pinewood 2020 Census internal point (25.8694, -80.2171), NOAA Hydrometeorological Design Studies Center. Read Oct 5, 2026.
- 29.NOAA National Hurricane Center, Tropical Cyclone Report: Hurricane Irma (AL112017), NOAA National Hurricane Center. Read Oct 5, 2026.
- 30.U.S. Census Bureau, 2020 Census counts (POP100, HU100) via TIGERweb tigerWMS_Census2020 layer 28 (Census Designated Places), U.S. Census Bureau. Read Oct 5, 2026.