Inspections ยท Malabar

Roof inspections in Malabar, FL

Mobile homes are 1.1 percent of Malabar's housing units, so nearly every roof here follows the Florida Building Code and the insurer rules for site-built houses. The median home dates to 1993. That suggests many original roofs are past 15 years, the age when insurers start asking questions.

Updated October 2026

A single-story house sits amid standing floodwater with tall pines and palms under an overcast sky.
Top-down drone view of a gray-blend shingle roof with ridges, valleys and roof vents, lawn on both sides and a white fence at the left edge.Our work
Photo: FEMA - Flooded neighborhood in Central Florida by Barry Bahler, Public domain, cropped

Malabar figures this page uses

Median year homes were built
1993
Share of homes built before 1980
16.9%
Owner-occupied share of occupied homes
98.8%
Mobile homes, share of housing units
1.1%

Housing age

Which Malabar roofs are old enough to need a look

Malabar's median home was built in 1993, five years newer than the countywide median of 1988. Another 21.5 percent of housing units went up in 2010 or later. Those newer roofs are mostly under 15 years old. Under Fla. Stat. 627.7011(5)(b), an insurer may not refuse or renew a policy solely because a roof is under 15 years old.

The older group is smaller but real: 16.9 percent of Malabar homes predate 1980. A roof that old has probably been replaced at least once, and the permit date matters more than the house date. Citizens Property Insurance asks for five years of remaining useful life on shingle roofs older than 25 years. Ask your insurer which line applies to your policy.

With a 98.8 percent owner-occupied share, almost every inspection here is ordered by the person who owns the roof. No landlord is in the middle.

Insurer rules

Insurer rules for roofs 15 years and older

If your Malabar roof has passed 15 years, your insurer must let you hire an authorized inspector, and you pay for it. A result showing 5 or more years of useful life bars the insurer from refusing or dropping you over roof age alone. The inspector must be on your insurer's accepted list and can be a home inspector, roofing contractor, engineer or architect.

The roof part of a 4-point report lists the material, age, remaining life, last roofing permit and whether a replacement was full or partial. It also names damage: curling, granule loss, exposed felt, soft decking and attic leaks. Citizens asks for this report once a property passes 20 years, which could apply to the 16.9 percent of Malabar homes built before 1980.

A wind mitigation inspection is a separate visit. Form OIR-B1-1802 looks at deck attachment and roof-to-wall connections in the attic, plus the code era of the home. The signer must come in person, and the finished form carries a five-year window if the structure does not change.

Timing

When to order a roof inspection in Malabar

  • Before you buy: age, remaining life and permit history are on the 4-point roof section.
  • Before you list: a current inspection answers a buyer's insurance question early.
  • After your insurer sends a roof-age letter: you have the right to the inspection in the 15-year rule.
  • After a storm: Brevard County saw roof shingle damage in Hurricane Matthew and roof damage from eight tornadoes in Irma.

Roof permit questions go to the Town of Malabar building permit portal. Only the portal link was confirmed, so call the building office to confirm what a repair needs. The county's address-level wind speed maps by risk category are the tool permit reviewers use for design wind speed.

Questions

Roof inspections in Malabar: questions

My Malabar roof is 15 years old. Does my insurer have to let me get it inspected?

Yes. Under Fla. Stat. 627.7011(5)(c), an insurer must allow you to hire an authorized inspector at your own expense before requiring replacement. If the inspection shows 5 or more years of useful life remaining, the insurer may not refuse or non-renew solely because of roof age. Malabar's median home was built in 1993, so many roofs here may reach this age. Your insurer or agent can tell you whom they recognize.

Source: U.S. Census Bureau, American Community Survey 2020-2024 5-year estimates (acs2024_5yr), via Census Reporter API, table B25035, read Oct 5, 2026

Related: Roof inspections

What does the roof section of a 4-point inspection cover?

It records the material, age, remaining useful life, last roofing permit date, full or partial replacement and overall condition. It also lists damage such as cracking, cupping, missing tabs, soft decking and attic leaks. Citizens requires a 4-point inspection on properties more than 20 years old, and 16.9 percent of Malabar homes were built before 1980.

Source: U.S. Census Bureau, American Community Survey 2020-2024 5-year estimates (acs2024_5yr), via Census Reporter API, read Oct 5, 2026

Related: Roof inspections

Does a wind mitigation inspection replace a roof inspection?

No. The wind mitigation form, OIR-B1-1802, records building code era, roof covering, deck attachment, roof-to-wall connections, roof shape and opening protection. It does not replace the roof age and condition review. With 21.5 percent of Malabar housing built in 2010 or later, many homes may have newer features worth documenting.

Source: U.S. Census Bureau, American Community Survey 2020-2024 5-year estimates (acs2024_5yr), via Census Reporter API, table B25034, read Oct 5, 2026

Related: Roof inspections

Do mobile home roofs in Malabar follow the same inspection rules?

Not exactly. Mobile homes are 1.1 percent of Malabar housing, and Senate staff note that the 15-year roof rule does not apply to mobile home policies. For mobile home applications on properties more than 20 years old, Citizens does ask that a 4-point inspection be submitted. Confirm the rules for your home with your insurer and the Town of Malabar building office.

Source: U.S. Census Bureau, American Community Survey 2020-2024 5-year estimates (acs2024_5yr), via Census Reporter API, read Oct 5, 2026

Related: Roof inspections

Sources for this page(32)
  1. 1.U.S. Census Bureau, American Community Survey 2020-2024 5-year estimates (acs2024_5yr), via Census Reporter API, table B25035. Read Oct 5, 2026.
  2. 2.U.S. Census Bureau, American Community Survey 2020-2024 5-year estimates (acs2024_5yr), via Census Reporter API, table B25034. Read Oct 5, 2026.
  3. 3.Median year homes were built: 1993. U.S. Census Bureau, American Community Survey 2020-2024 5-year estimates (acs2024_5yr), via Census Reporter API. Read Oct 5, 2026.
  4. 4.U.S. Census Bureau, American Community Survey 2020-2024 5-year estimates (acs2024_5yr), via Census Reporter API, tables B25034/B25035. Read Oct 5, 2026.
  5. 5.Share of homes built before 1980: 16.9%. U.S. Census Bureau, American Community Survey 2020-2024 5-year estimates (acs2024_5yr), via Census Reporter API. Read Oct 5, 2026.
  6. 6.Owner-occupied share of occupied homes: 98.8%. U.S. Census Bureau, American Community Survey 2020-2024 5-year estimates (acs2024_5yr), via Census Reporter API. Read Oct 5, 2026.
  7. 7.Hurricane Matthew (2016). NWS Melbourne, Post Tropical Cyclone Report: Hurricane Matthew (2016). Read Oct 5, 2026.
  8. 8.Hurricane Irma (2017). NWS Melbourne, Post Tropical Cyclone Report: Hurricane Irma (2017). Read Oct 5, 2026.
  9. 9.Brevard County, Building Code Wind Speed Maps. Read Oct 5, 2026.
  10. 10.Permit office: Town of Malabar building permit portal. Town of Malabar building permit portal. Read Oct 10, 2026.
  11. 11.Mobile homes, share of housing units: 1.1%. U.S. Census Bureau, American Community Survey 2020-2024 5-year estimates (acs2024_5yr), via Census Reporter API. Read Oct 5, 2026.
  12. 12.Florida Statutes, section 627.7011 (2026). Read Oct 4, 2026.
  13. 13.Citizens Property Insurance Corporation, inspections FAQ (updated 2026-03-17). Read Oct 4, 2026.
  14. 14.Insp4pt 03 25. Read Oct 4, 2026.
  15. 15.Citizens 4-Point Inspection Form, Sample Form Insp4pt 03 25. Read Oct 4, 2026.
  16. 16.Citizens Property Insurance Corporation. Read Oct 4, 2026.
  17. 17.Florida Office of Insurance Regulation, Uniform Mitigation Verification Inspection Form OIR-B1-1802 (Rev. 04/26). Read Oct 4, 2026.
  18. 18.Florida Statutes, section 627.711 (2026). Read Oct 5, 2026.
  19. 19.OIR form. Read Oct 4, 2026.
  20. 20.U.S. Census Bureau, American Community Survey 2020-2024 5-year estimates (acs2024_5yr), via Census Reporter API, U.S. Census Bureau (via Census Reporter). Read Oct 5, 2026.
  21. 21.NWS Melbourne, Post Tropical Cyclone Report: Hurricane Matthew (2016), National Weather Service. Read Oct 5, 2026.
  22. 22.NWS Melbourne, Post Tropical Cyclone Report: Hurricane Irma (2017), National Weather Service. Read Oct 5, 2026.
  23. 23.Town of Malabar building permit portal, malabarfl.portal.iworq.net. Read Oct 5, 2026.
  24. 24.2023 Florida Building Code, Building, 8th ed., Chapter 15 (UpCodes viewer, unofficial transcription), UpCodes (Florida Building Code transcription). Read Oct 5, 2026.
  25. 25.FRSA, "New 2023 FBC Eighth Edition is Now in Effect", 2024-02-13, floridaroof.com. Read Oct 5, 2026.
  26. 26.2023 Florida Building Code, Building, 8th ed., Chapter 1 (UpCodes viewer, unofficial transcription), UpCodes (Florida Building Code transcription). Read Oct 5, 2026.
  27. 27.NWS Melbourne, Post Tropical Cyclone Report: Hurricane Dorian (2019), National Weather Service. Read Oct 5, 2026.
  28. 28.U.S. Census Bureau, 2020 Census (TIGERweb tigerWMS_Census2020 MapServer: POP100, HU100, AREALAND, AREAWATER), U.S. Census Bureau. Read Oct 5, 2026.
  29. 29.NOAA NCEI, U.S. Climate Normals 1991-2020 (annual/seasonal), access-data API, NOAA National Centers for Environmental Information. Read Oct 5, 2026.
  30. 30.NOAA Atlas 14 Volume 9 version 2, partial-duration 24-hour depth estimates at the Malabar 2020 Census internal point (27.9871, -80.5825), NOAA Hydrometeorological Design Studies Center. Read Oct 5, 2026.
  31. 31.U.S. Census Bureau, 2020 Census (TIGERweb tigerWMS_Census2020 MapServer: POP100, HU100, AREALAND, AREAWATER), U.S. Census Bureau. Read Oct 5, 2026.
  32. 32.NOAA Atlas 14 Volume 9 version 2, partial-duration intensity estimates at the Malabar 2020 Census internal point (27.9871, -80.5825), NOAA Hydrometeorological Design Studies Center. Read Oct 5, 2026.