Re-roofs · Malabar
Roof replacement in Malabar, FL
The median Malabar home was built in 1993, five years newer than the Brevard County median of 1988. That says something about the house, not the roof on it. A replacement here still needs a permit, a Notice of Commencement and passed inspections.
Updated October 2026

Our workMalabar figures this page uses
- Housing units (ACS 5-year)
- 1,286
- Share of homes built before 1980
- 16.9%
- Share of homes built 2010 or later
- 21.5%
- Owner-occupied share of occupied homes
- 98.8%
Housing age
Home age and your Malabar roof
Of Malabar's 1,286 housing units, 16.9 percent were built before 1980 and 21.5 percent in 2010 or later. The census figure covers homes, so it cannot tell you your roof's age. Check your own papers: the permit record, the closing file, or the date on any past re-roof invoice.
If a past roof was built to the 2007 Florida Building Code or later, only the part you redo must meet today's code. If it was not, the 25 percent rule applies: once more than a quarter of a roof section is redone in any 12 months, the whole section must be replaced.
Age also matters to your insurer. For a roof 15 years or older, the homeowner may have an authorized inspector check it, at the homeowner's expense, before any replacement is required. How your own policy handles roof age is a question for your insurer or agent, who can answer it directly.
Permit steps
Permit and inspections for a Malabar re-roof
Roof permits here go through the Town of Malabar building permit portal. Only the portal link was confirmed, so ask the town building office about its exact steps, fees and forms before you sign a contract.
Before the first inspection, you need to record a Notice of Commencement and post it on the job site. The permit card indicates that leaving out the permit could mean you end up paying a second time for work you already had done. Once issued, a permit becomes invalid if work does not start within 6 months, or if work stops for 6 months.
Roofing work includes the deck attachments and any repair of wood sheathing found during the job. Brevard County publishes address-level wind speed maps by risk category for permitting, so ask the town which design wind speed applies to your lot. Plans filed on or after December 31, 2026 must follow the Ninth Edition of the code.
Who owns here
Mobile homes and owner-occupied roofs
Owners live in 98.8 percent of Malabar's occupied homes, and 98.9 percent of units are single-family detached. Mobile homes are 1.1 percent of units here, against 7.2 percent countywide. Mobile homes follow the federal HUD code, so confirm roof rules with the building office.
Hurricane Irma in 2017 damaged over 7,132 Brevard County homes, with roof and shingle damage from eight tornadoes. Matthew in 2016 mostly hit shingles, soffits and awnings. A new roof is built to the code in force when you apply.
Questions
Roof replacement in Malabar: questions
How old are the homes in Malabar?
The median Malabar home was built in 1993, with a margin of error of 5 years. Countywide the median is 1988. About 16.9 percent of Malabar homes predate 1980, and 21.5 percent date from 2010 or later. Those numbers describe the houses, not the roofs. A home from 1993 may have had its roof replaced since, so check your permit history or ask the town building office.
Source: U.S. Census Bureau, American Community Survey 2020-2024 5-year estimates (acs2024_5yr), via Census Reporter API, table B25034, read Oct 5, 2026
Do I need a permit to replace my roof in Malabar?
Yes, plan on a permit through the Town of Malabar building permit portal. Only the portal link was confirmed, so ask the town building office about requirements. You will also need a recorded Notice of Commencement posted on site before the first inspection. A permit lapses if work has not begun within 6 months of the date it was issued.
Source: Town of Malabar building permit portal, read Oct 5, 2026
What is the 25 percent rule for my roof?
If more than 25 percent of a roof section is repaired or replaced in any 12 months, the whole section must be replaced to current code. The exception covers a roof built, repaired or replaced to the 2007 Florida Building Code or later, where only the redone part must comply. March 1, 2009 was the date the 2007 code took effect.
Source: 2023 Florida Building Code, Building, 8th ed., Chapter 15 (UpCodes viewer, unofficial transcription), read Oct 5, 2026
Can my insurer force me to replace a 15-year-old roof?
Not solely because of its age. Under Fla. Stat. 627.7011(5), an insurer cannot refuse to write or renew a homeowner's policy solely because the roof is younger than 15 years. When your roof is 15 years or older, you can have an authorized inspector check it at your own expense before the insurer demands replacement, and if that inspection shows 5 or more years of useful life left, the insurer may not refuse or non-renew solely because of age. Any inspector the insurer approves counts as authorized, including a licensed home inspector, roofing contractor, engineer or architect. In this area 98.9 percent of housing units are single-family detached homes, so this rule applies to most roofs here. Confirm what applies to you with your insurer or agent.
Source: Florida Statutes, section 627.7011 (2026), read Oct 5, 2026
Sources for this page(32)
- 1.Housing units (ACS 5-year): 1,286. U.S. Census Bureau, American Community Survey 2020-2024 5-year estimates (acs2024_5yr), via Census Reporter API. Read Oct 5, 2026.
- 2.Share of homes built before 1980: 16.9%. U.S. Census Bureau, American Community Survey 2020-2024 5-year estimates (acs2024_5yr), via Census Reporter API. Read Oct 5, 2026.
- 3.Share of homes built 2010 or later: 21.5%. U.S. Census Bureau, American Community Survey 2020-2024 5-year estimates (acs2024_5yr), via Census Reporter API. Read Oct 5, 2026.
- 4.U.S. Census Bureau, American Community Survey 2020-2024 5-year estimates (acs2024_5yr), via Census Reporter API, table B25034. Read Oct 5, 2026.
- 5.U.S. Census Bureau, American Community Survey 2020-2024 5-year estimates (acs2024_5yr), via Census Reporter API, tables B25034/B25035. Read Oct 5, 2026.
- 6.Permit office: Town of Malabar building permit portal. Town of Malabar building permit portal. Read Oct 10, 2026.
- 7.Brevard County, Building Code Wind Speed Maps. Read Oct 5, 2026.
- 8.City of West Melbourne, Building Department. Read Oct 5, 2026.
- 9.Owner-occupied share of occupied homes: 98.8%. U.S. Census Bureau, American Community Survey 2020-2024 5-year estimates (acs2024_5yr), via Census Reporter API. Read Oct 5, 2026.
- 10.Single-family detached share of housing units: 98.9%. U.S. Census Bureau, American Community Survey 2020-2024 5-year estimates (acs2024_5yr), via Census Reporter API. Read Oct 5, 2026.
- 11.Mobile homes, share of housing units: 1.1%. U.S. Census Bureau, American Community Survey 2020-2024 5-year estimates (acs2024_5yr), via Census Reporter API. Read Oct 5, 2026.
- 12.U.S. Census Bureau, American Community Survey 2020-2024 5-year estimates (acs2024_5yr), via Census Reporter API, table B25024. Read Oct 5, 2026.
- 13.Hurricane Irma (2017). NWS Melbourne, Post Tropical Cyclone Report: Hurricane Irma (2017). Read Oct 5, 2026.
- 14.Hurricane Matthew (2016). NWS Melbourne, Post Tropical Cyclone Report: Hurricane Matthew (2016). Read Oct 5, 2026.
- 15.Median year homes were built: 1993. U.S. Census Bureau, American Community Survey 2020-2024 5-year estimates (acs2024_5yr), via Census Reporter API. Read Oct 5, 2026.
- 16.U.S. Census Bureau, American Community Survey 2020-2024 5-year estimates (acs2024_5yr), via Census Reporter API, table B25035. Read Oct 5, 2026.
- 17.2023 Florida Building Code, Building, 8th ed., Chapter 15 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
- 18.Florida Statutes, section 553.844 (2026). Read Oct 5, 2026.
- 19.Florida Statutes, section 627.7011 (2026). Read Oct 5, 2026.
- 20.Florida Statutes, section 553.73 (2026). Read Oct 4, 2026.
- 21.2023 Florida Building Code, Building, 8th ed., Chapter 1 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
- 22.Fla. Stat. 489.105(3)(e). Read Oct 5, 2026.
- 23.Miami-Dade County RER notice. Read Oct 5, 2026.
- 24.FRSA, "New 2023 FBC Eighth Edition is Now in Effect", 2024-02-13. Read Oct 5, 2026.
- 25.Town of Malabar building permit portal, malabarfl.portal.iworq.net. Read Oct 5, 2026.
- 26.Florida Statutes, section 713.135 (2026), Florida Legislature. Read Oct 5, 2026.
- 27.NWS Melbourne, Post Tropical Cyclone Report: Hurricane Irma (2017), National Weather Service. Read Oct 5, 2026.
- 28.NWS Melbourne, Post Tropical Cyclone Report: Hurricane Matthew (2016), National Weather Service. Read Oct 5, 2026.
- 29.NOAA NCEI, U.S. Climate Normals 1991-2020 (annual/seasonal), access-data API, NOAA National Centers for Environmental Information. Read Oct 5, 2026.
- 30.NOAA Atlas 14 Volume 9 version 2, partial-duration intensity estimates at the Malabar 2020 Census internal point (27.9871, -80.5825), NOAA Hydrometeorological Design Studies Center. Read Oct 5, 2026.
- 31.NOAA Atlas 14 Volume 9 version 2, partial-duration 24-hour depth estimates at the Malabar 2020 Census internal point (27.9871, -80.5825), NOAA Hydrometeorological Design Studies Center. Read Oct 5, 2026.
- 32.U.S. Census Bureau, 2020 Census (TIGERweb tigerWMS_Census2020 MapServer: POP100, HU100, AREALAND, AREAWATER), U.S. Census Bureau. Read Oct 5, 2026.
South Fork Roofing
Roof replacement in Malabar
Answer a few questions about the job, or call.
