Skip to content

New construction · Longboat Key

New construction roofing in Longboat Key, FL

Only 2.9 percent of Longboat Key homes were built in 2010 or later. The median home dates to 1980. A new roof here usually means a rebuild or an infill lot on the barrier island, and the Town's Building Division handles the permit.

Updated October 2026

Two-storey white historic house with a green-trimmed entrance, palm trees, and a green lawn in daylight.
A roof deck sheathed in red-brown ZIP System panels with black seam tape, a bucket and a ladder on the deck, homes and a street behind.Our work
Photo: Longboat Key FL Jordan House01 by Ebyabe, CC BY-SA 3.0, cropped

Code edition

The code edition that applies to your new roof permit

For a Longboat Key rebuild, the edition depends on the day you file with the Town. Applications in by December 30, 2026 fall under the Eighth Edition, which took effect at the end of 2023. Anything submitted from December 31, 2026 onward is reviewed against the Ninth. If your plans are still in design, the filing date decides which book the Town uses.

Roofing is a mandatory statewide product-approval category, so every shingle, tile or metal system on your permit needs a Florida Building Commission approval number. Look it up by FL number or manufacturer on the Commission's public search. The Miami-Dade NOA belongs to that county's own system, not to your Sarasota County or Manatee County permit.

Roof assembly

On a new build, three layers go on in order: the deck, then the underlayment, then the drip edge

Sheathing is nailed with ring shank nails, 2 1/2 inches by 0.131 inch, in the pattern the code sets. Inspectors check this before anything covers the deck. Longboat Key saw a 6.68 ft storm tide in Helene and 5.04 ft in Milton, so a rebuilt roof is judged against a real wind and water record.

  • Option one is self-adhering polymer-modified bitumen underlayment laid over the entire deck.
  • Option two: a 3 3/4-inch strip of that membrane or AAMA 711 Level 3 tape over every deck joint, then approved underlayment over the whole roof.
  • Option three uses two layers of felt-type underlayment, with nails spaced 12 inches apart in the field and 6 inches apart at the laps.

At eaves and gables, you lay the shingle drip edge over the underlayment. Fasteners run 12 inches apart, or 4 inches apart where design wind speed is 110 mph or more or the roof is higher than 33 feet.

Inspections

How to time the roof with the build, and where the inspections fit

Your roof goes between framing and final on the inspection list. Sheathing is checked first, then the roofing inspection looks at dry-in, roof coverings and flashing. Sarasota County offers virtual re-roof inspections, but those are for re-roofs. On the Manatee County side of the island, ask the Town how your inspections will run.

Every Longboat Key building permit must carry a FEMA Substantial Damage/Improvement form, so include it in your first submittal. Record the Notice of Commencement and post it on site before the first inspection, or you may end up paying twice.

Florida law lets a builder put asphalt shingles on its own new building. For a tile, metal or membrane roof on your island lot, expect the work to go to a separately registered roofing contractor.

Questions

New construction roofing in Longboat Key: questions

Which code edition applies to a new roof permit on Longboat Key?

It depends on the filing date. Permit applications submitted on or after December 31, 2026 must meet the Ninth Edition, while earlier filings fall under the 2023 Eighth Edition. The Town of Longboat Key Building Division reviews your plans, so confirm with that office which edition your submittal date puts you under before you finalize the roof design.

Source: Town of Longboat Key - Building Division (Planning, Zoning & Building), read Oct 5, 2026

Related: New construction roofing

Do I need a Notice of Commencement for a new roof here?

Usually yes. The code requires it recorded and posted on the job site before the first inspection. According to the permit card, skipping this step may leave you paying twice for the work. Under Fla. Stat. 713.135(1)(e), the office asks for a copy before the first inspection when the direct contract is above a set amount. Longboat Key also requires the FEMA Substantial Damage/Improvement form with every permit.

Source: Florida Statutes, section 713.135 (2026), read Oct 5, 2026

Related: New construction roofing

What warranty does a builder owe on a new home's roof?

Under Fla. Stat. 553.837, effective July 1, 2025, a builder has to stand behind a new home for 1 year when defects in equipment, material or workmanship cause a material Florida Building Code violation. Whichever happens first, title passing or first occupancy, starts the one-year clock. The warranty leaves out normal wear and tear, along with acts of God such as a natural disaster.

Source: Florida Statutes, section 553.837 (2026), read Oct 5, 2026

Related: New construction roofing

Do new Longboat Key homes need gutters?

Often yes. Under Florida Building Code, Residential R318.5, buildings whose eaves project less than 6 inches need gutters with downspouts, apart from gable end rakes and roofs sitting above another roof. On a narrow island lot, plan where the water lands, since the code wants it at least 1 foot from the sidewall. Longboat Key also participates in the Community Rating System, so drainage details matter at review.

Source: 2023 Florida Building Code, Residential, 8th ed., R318.5 (UpCodes viewer, unofficial transcription); FBC-Building 1503.7, read Oct 5, 2026

Related: New construction roofing

Nearby

New construction roofing near Longboat Key

Sources for this page(30)
  1. 1.Permit office: Town of Longboat Key - Building Division (Planning, Zoning & Building). Town of Longboat Key - Building Division (Planning, Zoning & Building). Read Oct 10, 2026.
  2. 2.NOAA National Hurricane Center, Tropical Cyclone Report: Hurricane Helene. Read Oct 5, 2026.
  3. 3.NOAA National Hurricane Center, Tropical Cyclone Report: Hurricane Milton. Read Oct 5, 2026.
  4. 4.Town of Longboat Key, Building Division (official). Read Oct 5, 2026.
  5. 5.Town of Longboat Key (official). Read Oct 5, 2026.
  6. 6.Sarasota County Planning and Development Services - Building (official; Internet Archive snapshot 2026-04-19). Read Oct 5, 2026.
  7. 7.Wikipedia, "Longboat Key, Florida" (secondary source). Read Oct 5, 2026.
  8. 8.Computed from the 2020 Census Block Assignment File and 2020 block counts. Read Oct 5, 2026.
  9. 9.Town of Longboat Key, Post Hurricane Helene & Milton Building Permitting Information (official). Read Oct 5, 2026.
  10. 10.Share of homes built 2010 or later: 2.9%. U.S. Census Bureau, ACS 2024 5-year (2020-2024), table B25034, via Census Reporter API. Read Oct 5, 2026.
  11. 11.Median year homes were built: 1980. U.S. Census Bureau, ACS 2024 5-year (2020-2024), table B25035, via Census Reporter API. Read Oct 5, 2026.
  12. 12.FRSA, "New 2023 FBC Eighth Edition is Now in Effect", 2024-02-13. Read Oct 5, 2026.
  13. 13.Miami-Dade County RER notice. Read Oct 5, 2026.
  14. 14.Florida Statutes, section 553.842 (2026). Read Oct 5, 2026.
  15. 15.Florida Building Commission. Read Oct 5, 2026.
  16. 16.2023 Florida Building Code, Residential, 8th ed., Chapter 8 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
  17. 17.2023 Florida Building Code, Residential, 8th ed., Chapter 9 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
  18. 18.2023 Florida Building Code, Building, 8th ed., Chapter 1 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
  19. 19.Florida Statutes, section 489.113 (2026). Read Oct 5, 2026.
  20. 20.Florida Statutes, section 553.837 (2026). Read Oct 5, 2026.
  21. 21.2023 Florida Building Code, Residential, 8th ed., R318.5 (UpCodes viewer, unofficial transcription); FBC-Building 1503.7. Read Oct 5, 2026.
  22. 22.Town of Longboat Key - Building Division (Planning, Zoning & Building), Town of Longboat Key. Read Oct 5, 2026.
  23. 23.Florida Statutes, section 713.135 (2026), Florida Legislature. Read Oct 5, 2026.
  24. 24.U.S. Census Bureau, ACS 2024 5-year (2020-2024), table B25034, via Census Reporter API, U.S. Census Bureau (via Census Reporter). Read Oct 5, 2026.
  25. 25.U.S. Census Bureau, ACS 2024 5-year (2020-2024), table B25035, via Census Reporter API, U.S. Census Bureau (via Census Reporter). Read Oct 5, 2026.
  26. 26.Florida Statutes, section 627.7011 (2026), Florida Legislature. Read Oct 4, 2026.
  27. 27.2023 Florida Building Code, Building, 8th ed., Chapter 15 (UpCodes viewer, unofficial transcription), UpCodes (Florida Building Code transcription). Read Oct 5, 2026.
  28. 28.Wikipedia, "Sarasota County, Florida" and "Sarasota, Florida" (secondary), Wikipedia. Read Oct 5, 2026.
  29. 29.NOAA NCEI U.S. Climate Normals 1991-2020, stations USW00012871 and USC00089176 VENICE, NOAA National Centers for Environmental Information. Read Oct 5, 2026.
  30. 30.NOAA Atlas 14 Volume 9 version 2, partial-duration 24-hour depth estimates at the Longboat Key 2020 Census internal point (27.4005, -82.6442), NOAA Hydrometeorological Design Studies Center. Read Oct 5, 2026.

South Fork Roofing

New construction roofing in Longboat Key

Answer a few questions about the job, or call.

CallFree estimate