New construction · Greenacres
New construction roofing in Greenacres, FL
In Greenacres, only 4.4 percent of homes were built in 2010 or later, so a new roof here is a small share of the housing stock. An application filed on or after December 31, 2026 is reviewed under the Ninth Edition of the Florida Building Code. Earlier filings follow the 2023 edition.
Updated October 2026

Code edition
What code edition will your Greenacres permit face?
The median Greenacres home dates to 1987, about level with the county figure of 1986. That tells you little about code, because a new build is judged by the edition in force on the day its permit application is filed. The 2023 edition has applied since the last day of 2023. Plans filed on or after December 31, 2026 move to the Ninth Edition. If your Greenacres plans land near that date, ask the city's Building Division which edition governs.
Palm Beach County is outside the High-Velocity Hurricane Zone, which covers Broward and Miami-Dade only. A Greenacres roof therefore follows the standard Florida Building Code, not the stricter zone rules. Roofing products still need statewide product approval, and the number belongs on your permit paperwork.
Build details
Decking, dry-in and edge metal for a Greenacres build
Roof sheathing is nailed with ring shank nails, and the residential code names a 2 1/2 inch by 0.131 inch nail for most decks. Before shingles or metal go on, the deck must be dried in one of three ways. You can cover it with self-adhering membrane, tape every deck joint and then underlay the whole roof, or lay two layers of felt-type underlayment.
On shingle roofs, the edge metal sits on top of the underlayment along eaves and gables. Its nails are spaced at most 12 inches apart, or 4 inches where design wind speed or roof height calls for it. If you choose tile for a Greenacres home, solid sheathing is the base, and the installer follows the maker's instructions or the Florida High Wind tile manual.
Gutters are required where eaves project less than 6 inches. Downspouts must empty at least 1 foot from the wall.
Inspections
Fitting the roof into the Greenacres build schedule
Inspections run from foundation through framing and sheathing to the roofing check, then final. The sheathing check can be combined with dry-in or requested separately. The roofing check looks at dry-in, coverings and flashing, so your roofer has to be ready the moment the deck passes. Permit questions go to the Greenacres Building Division.
Only asphalt or wood shingles on a builder's own new building can be done by that builder without a roofing license. Tile, metal and membrane work needs a certified or registered roofing contractor. An owner can also name a private provider for plans review or inspections, and a contractor may do so with the owner's written authorization.
Questions
New construction roofing in Greenacres: questions
What is the 25% roof rule in Florida?
Within any 12-month period, repairing, replacing or recovering more than 25 percent of a roof section triggers replacement of the entire section to current code. An exception applies to a roof built, repaired or replaced under the 2007 Florida Building Code or later, where only the repaired part must meet code. It rarely matters on a new roof in Greenacres, but it applies to later repairs.
Source: U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25034, via Census Reporter API, read Oct 5, 2026
Does Greenacres follow the High-Velocity Hurricane Zone rules?
No. The High-Velocity Hurricane Zone covers Broward and Miami-Dade counties only, and Palm Beach County sits outside it. A new Greenacres roof follows the standard Florida Building Code and needs statewide product approval for roofing materials. Confirm the details with the Greenacres Building Division before you order materials.
Source: Florida Building Commission, 'Setting New Standards for Safety: The Florida Building Code' (2004 publication; wind-speed figures in it are outdated and not used), read Oct 5, 2026
Does a new Greenacres home come with a builder warranty?
Since July 1, 2025, Florida has required a builder to warrant a newly built home for 1 year against defects in equipment, material or workmanship that cause a material Florida Building Code violation. The clock starts at the earlier of title transfer or move-in. A homebuyer in Greenacres should ask the builder how a roof leak report is handled.
Source: U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25034, via Census Reporter API, read Oct 5, 2026
Who permits a new roof in Greenacres?
Roof permits in Greenacres go through the Greenacres Building Division. Palm Beach County also offers a Self-Issued Reroof Application online, but that is for qualifying residential reroofs, not new construction. For a new build, confirm the permit path with the city office.
Source: City of Greenacres - Building Division, read Oct 5, 2026
Sources for this page(34)
- 1.Median year homes were built: 1987. U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25035, via Census Reporter API. Read Oct 5, 2026.
- 2.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25035, via Census Reporter API. Read Oct 5, 2026.
- 3.Permit office: City of Greenacres - Building Division. City of Greenacres - Building Division. Read Oct 10, 2026.
- 4.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25035, B25034, B25024, via Census Reporter API. Read Oct 5, 2026.
- 5.Florida Building Commission, 'Setting New Standards for Safety: The Florida Building Code' (2004 publication; wind-speed figures in it are outdated and not used). Read Oct 5, 2026.
- 6.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25024, via Census Reporter API. Read Oct 5, 2026.
- 7.Hurricane Matthew (2016). NOAA National Hurricane Center, Tropical Cyclone Report: Hurricane Matthew (AL142016). Read Oct 5, 2026.
- 8.Share of homes built 2010 or later: 4.4%. U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25034, via Census Reporter API. Read Oct 5, 2026.
- 9.U.S. Census Bureau, Building Permits Survey county annual files (co2025a.txt, co2020a.txt). Read Oct 5, 2026.
- 10.Palm Beach County PZB - Building Division, Self-Issued Reroof Applications. Read Oct 5, 2026.
- 11.FRSA, "New 2023 FBC Eighth Edition is Now in Effect", 2024-02-13. Read Oct 5, 2026.
- 12.Miami-Dade County RER notice. Read Oct 5, 2026.
- 13.FBC-Building 2023 Chapter 2 definitions. Read Oct 5, 2026.
- 14.Florida Statutes, section 553.842 (2026). Read Oct 5, 2026.
- 15.2023 Florida Building Code, Residential, 8th ed., Chapter 8 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
- 16.2023 Florida Building Code, Residential, 8th ed., Chapter 9 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
- 17.2023 Florida Building Code, Residential, 8th ed., Chapter 3 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
- 18.2023 Florida Building Code, Building, 8th ed., Chapter 1 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
- 19.Florida Statutes, section 489.113 (2026). Read Oct 5, 2026.
- 20.Florida Statutes, section 553.791 (2026). Read Oct 5, 2026.
- 21.2023 Florida Building Code, Building, 8th ed., Chapter 15 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
- 22.Florida Statutes, section 553.837 (2026). Read Oct 5, 2026.
- 23.City of Greenacres - Building Division, City of Greenacres. Read Oct 5, 2026.
- 24.NOAA National Hurricane Center, Tropical Cyclone Report: Hurricane Matthew (AL142016), NOAA National Hurricane Center. Read Oct 5, 2026.
- 25.NOAA National Hurricane Center, Tropical Cyclone Report: Hurricane Dorian (AL052019), NOAA National Hurricane Center. Read Oct 5, 2026.
- 26.Florida Statutes, section 627.7011 (2026), Florida Legislature. Read Oct 4, 2026.
- 27.NOAA NCEI U.S. Climate Normals 1991-2020 (access data service), NOAA National Centers for Environmental Information. Read Oct 5, 2026.
- 28.NOAA NCEI U.S. Climate Normals 1991-2020 (access data service), NOAA National Centers for Environmental Information. Read Oct 5, 2026.
- 29.NOAA Atlas 14 Volume 9 version 2, partial-duration 24-hour depth estimates at the Greenacres 2020 Census internal point (26.6276, -80.1372), NOAA Hydrometeorological Design Studies Center. Read Oct 5, 2026.
- 30.NOAA National Hurricane Center, Tropical Cyclone Climatology, NOAA National Hurricane Center. Read Oct 5, 2026.
- 31.NOAA Atlas 14 Volume 9 version 2, partial-duration intensity estimates at the Greenacres 2020 Census internal point (26.6276, -80.1372), NOAA Hydrometeorological Design Studies Center. Read Oct 5, 2026.
- 32.Wikipedia, 'Greenacres, Florida' (revision 1369949483), Wikipedia. Read Oct 5, 2026.
- 33.Wikipedia, 'List of municipalities in Florida', Wikipedia. Read Oct 5, 2026.
- 34.Florida Statutes, section 713.135 (2026), Florida Legislature. Read Oct 5, 2026.
South Fork Roofing
New construction roofing in Greenacres
Answer a few questions about the job, or call.
