Skip to content

Re-roofs ยท Greenacres

Roof replacement in Greenacres, FL

The median Greenacres home was built in 1987, which means many roofs on local homes are now close to or past the age where a re-roof is a serious question. A roof of that age has usually been through several Florida summers and at least one hurricane season. If you own a home here, the age of the house is the first thing to check, and the roof rules that apply to a replacement are the second.

Updated October 2026

Drone view looking down on a gray-blend shingle roof with two front gables, a debris container and a pickup in the driveway beyond.

Greenacres figures this page uses

Share of homes built before 1980
20.6%
Share of homes built 2010 or later
4.4%
Owner-occupied share of occupied homes
66.5%
Median year homes were built
1987

Housing age

What the housing age means for an older Greenacres roof

About one in five Greenacres homes was built before 1980. That is the group most likely to still carry an original or near-original roof. Only 4.4 percent of homes were built in 2010 or later, so a newer roof is the exception here rather than the rule.

Greenacres sits close to the county median, which was 1986. Owner-occupied homes make up 66.5 percent of occupied units, so most roof decisions here are made by the people who live under them.

Permits and rules

What you need to know about getting a re-roof permit in Greenacres

The City of Greenacres Building Division is the office that handles roof permit approvals in town. Confirm current requirements with that office before the work starts.

Florida's 25 percent rule limits how much of a roof can be repaired or replaced in a 12-month period without redoing the whole system. The exception matters: if the existing roof was built or repaired to the 2007 Florida Building Code or later, only the replaced portion must meet current code.

  • Confirm the permit with the City of Greenacres Building Division before work begins.
  • Ask whether the existing roof meets the 2007 Florida Building Code exception.
  • Ask your insurer whether it needs an inspection of a roof 15 years or older.

Storms and rain

Storms and rain that affect a Greenacres roof

Of Florida's counties, only Miami-Dade and Broward fall inside the High Velocity Hurricane Zone, so Palm Beach County sits outside it. Hurricane Irma's storm surge reached 2 to 4 feet along coastal Palm Beach County, and Hurricane Matthew's tropical-storm-force winds reached coastal areas from Palm Beach County northward.

Questions

Roof replacement in Greenacres: questions

How old are most homes in Greenacres?

The median home in Greenacres was built in 1987, according to the 2024 American Community Survey five-year estimates. About 20.6 percent of homes were built before 1980 and only 4.4 percent in 2010 or later. Many older roofs here are likely past 25 years, so check the age of your roof before deciding on a replacement.

Source: U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25035, via Census Reporter API, read Oct 5, 2026

Related: Roof replacement

What is the 25% roof rule in Florida?

The 25 percent rule says that no more than 25 percent of an existing roof can be repaired, replaced or recovered in any 12-month period unless the whole roof system is replaced. When the current roof was built or fixed under the 2007 Florida Building Code or newer, you typically only need the repaired section to satisfy today's code. Local ordinances have no power to alter this exception. Ask the City of Greenacres Building Division how this exception applies to the specific roof you have.

Source: 2023 Florida Building Code, Building, 8th ed., Chapter 15 (UpCodes viewer, unofficial transcription), read Oct 5, 2026

Related: Roof replacement

Which office issues roof permits in Greenacres?

The City of Greenacres Building Division is the office that handles roof permit approvals in town. Confirm current permit requirements with that office before work begins, including whether the 25 percent rule exception applies to your roof.

Source: City of Greenacres - Building Division, read Oct 5, 2026

Related: Roof replacement

Nearby

Roof replacement near Greenacres

Sources for this page(30)
  1. 1.Share of homes built before 1980: 20.6%. U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25034, via Census Reporter API. Read Oct 5, 2026.
  2. 2.Share of homes built 2010 or later: 4.4%. U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25034, via Census Reporter API. Read Oct 5, 2026.
  3. 3.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25035, B25034, B25024, via Census Reporter API. Read Oct 5, 2026.
  4. 4.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25035, via Census Reporter API. Read Oct 5, 2026.
  5. 5.Owner-occupied share of occupied homes: 66.5% (10,146 of 15,249). U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25003, via Census Reporter API. Read Oct 5, 2026.
  6. 6.Permit office: City of Greenacres - Building Division. City of Greenacres - Building Division. Read Oct 10, 2026.
  7. 7.Florida Building Commission, 'Setting New Standards for Safety: The Florida Building Code' (2004 publication; wind-speed figures in it are outdated and not used). Read Oct 5, 2026.
  8. 8.Hurricane Irma (2017). NOAA National Hurricane Center, Tropical Cyclone Report: Hurricane Irma (AL112017). Read Oct 5, 2026.
  9. 9.Hurricane Matthew (2016). NOAA National Hurricane Center, Tropical Cyclone Report: Hurricane Matthew (AL142016). Read Oct 5, 2026.
  10. 10.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25024, via Census Reporter API. Read Oct 5, 2026.
  11. 11.Median year homes were built: 1987. U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25035, via Census Reporter API. Read Oct 5, 2026.
  12. 12.2023 Florida Building Code, Building, 8th ed., Chapter 15 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026. FBC text read from UpCodes (unofficial transcription): check floridabuilding.org or the ICC viewer before quoting (spec 8.7).
  13. 13.Florida Statutes, section 553.844 (2026). Read Oct 5, 2026.
  14. 14.Florida Statutes, section 627.7011 (2026). Read Oct 4, 2026.
  15. 15.Florida Statutes, section 489.147 (2026). Read Oct 4, 2026.
  16. 16.City of Greenacres - Building Division, City of Greenacres. Read Oct 5, 2026.
  17. 17.NOAA National Hurricane Center, Tropical Cyclone Report: Hurricane Irma (AL112017), NOAA National Hurricane Center. Read Oct 5, 2026.
  18. 18.NOAA National Hurricane Center, Tropical Cyclone Report: Hurricane Matthew (AL142016), NOAA National Hurricane Center. Read Oct 5, 2026.
  19. 19.NOAA National Hurricane Center, Tropical Cyclone Report: Hurricane Dorian (AL052019), NOAA National Hurricane Center. Read Oct 5, 2026.
  20. 20.2023 Florida Building Code, Building, 8th ed., Chapter 1 (UpCodes viewer, unofficial transcription), UpCodes (Florida Building Code transcription). Read Oct 5, 2026.
  21. 21.FRSA, "New 2023 FBC Eighth Edition is Now in Effect", 2024-02-13, floridaroof.com. Read Oct 5, 2026.
  22. 22.Miami-Dade County RER notice, Miami. Read Oct 5, 2026.
  23. 23.NOAA NCEI U.S. Climate Normals 1991-2020 (access data service), NOAA National Centers for Environmental Information. Read Oct 5, 2026.
  24. 24.NOAA NCEI U.S. Climate Normals 1991-2020 (access data service), NOAA National Centers for Environmental Information. Read Oct 5, 2026.
  25. 25.NOAA Atlas 14 Volume 9 version 2, partial-duration 24-hour depth estimates at the Greenacres 2020 Census internal point (26.6276, -80.1372), NOAA Hydrometeorological Design Studies Center. Read Oct 5, 2026.
  26. 26.NOAA National Hurricane Center, Tropical Cyclone Climatology, NOAA National Hurricane Center. Read Oct 5, 2026.
  27. 27.NOAA Atlas 14 Volume 9 version 2, partial-duration intensity estimates at the Greenacres 2020 Census internal point (26.6276, -80.1372), NOAA Hydrometeorological Design Studies Center. Read Oct 5, 2026.
  28. 28.Wikipedia, 'Greenacres, Florida' (revision 1369949483), Wikipedia. Read Oct 5, 2026.
  29. 29.Wikipedia, 'List of municipalities in Florida', Wikipedia. Read Oct 5, 2026.
  30. 30.Florida Statutes, section 713.135 (2026), Florida Legislature. Read Oct 5, 2026.

South Fork Roofing

Roof replacement in Greenacres

Answer a few questions about the job, or call.

CallGet a quote