New construction · Southchase
New construction roofing in Southchase, FL
Only 1.6 percent of Southchase homes were built in 2010 or later, so a new roof here is rare, and the permit rules matter more than most owners expect. Orange County's building office issues the permit. The code edition depends on the date you file, and the roof must pass its own inspection.
Updated October 2026

Local building picture
Southchase's age and the building code that governs it are worth pinning down before any roof work starts
The median Southchase home was built in 1997, against 1994 countywide. Only 4.4 percent of homes here predate 1980, while 26.1 percent do countywide. By our arithmetic, Orange County has 17.7 points more homes from 2010 or later than Southchase does. Little new building is happening in this area, so most roofing work here is on older houses.
A new home permit filed before December 31, 2026 falls under the Eighth Edition of the Florida Building Code, which took effect December 31, 2023. Anything filed on or after that date follows the Ninth Edition. Orange County's Division of Building Safety enforces it, and applications and inspection requests go through its online Fast Track portal.
Deck and dry-in
Requirements for the roof deck and the underlayment
Ring shank nails fasten the roof sheathing on a newly built home. The residential code names the 2 1/2 inch by 0.131 inch size for most sheathing. After that, the dry-in is completed by one of three methods. The first method covers the entire deck with a self-adhering membrane. Another is a 3 3/4 inch strip over every deck joint, with underlayment over the top. The third is two layers of felt-type underlayment with set nailing spacing.
At the eaves and gables, the shingle drip edge is installed on top of the underlayment. Nails are spaced at most 12 inches apart, or 4 inches where the design wind speed is 110 mph or more. Roofing is also a statewide product approval category, so the shingles, tile or metal you choose must carry a Florida approval. The Florida Building Commission search tool lets you look it up by number.
Permits and inspections
Scheduling the roof around inspections
On a Southchase new build, the roofing inspection comes after framing, sheathing and exterior wall coverings, and before the final. It checks dry-in, insulation, coverings and flashing. A permit becomes invalid when work has not begun within 6 months, or when work halts for 6 months. Orange County's permit card also warns that skipping the Notice of Commencement can mean paying twice, so get it recorded and posted at the site early.
A builder in Florida may install asphalt shingles on its own new building with no roofing license. Other roof types, such as tile, metal and membrane, go to a roofing contractor holding state certification or registration. Look up that license on the state's contractor search before you sign anything.
Questions
New construction roofing in Southchase: questions
Which building code applies to a new roof permit in Southchase?
It depends on the filing date. Permits submitted before December 31, 2026 follow the 2023 Florida Building Code, Eighth Edition. Permits submitted on or after that date must follow the Ninth Edition. Southchase is unincorporated, so Orange County's Division of Building Safety issues the permit, and requests go through its Fast Track portal.
Source: Orange County Division of Building Safety, read Oct 5, 2026
What is the 25% roof rule in Florida?
It applies to existing buildings. Once more than 25 percent of a roof section has been repaired, replaced or recovered inside a 12-month window, current code requires the whole section to be replaced. A roof that was itself built, repaired or replaced under the 2007 code or later gets a narrower rule: only the repaired part must meet current code. Since the median Southchase home dates to 1997, confirm your roof's history with the county building office.
Source: U.S. Census Bureau, American Community Survey 2020-2024 5-year estimates (acs2024_5yr), via Census Reporter API, table B25035, read Oct 5, 2026
Does a new Florida home come with a builder warranty on defects?
Yes, as of July 1, 2025, a newly built Florida home must carry a builder warranty of 1 year covering defects in equipment, material or workmanship that cause a material Florida Building Code violation. Excluded from that coverage are natural disasters, settling, defects the owner caused, and normal wear and tear. Homes in this area were built around a median year of 1997, so many are well past that first year and are not covered by it. Read your sales contract and ask the builder how a roof claim is filed.
Source: Florida Statutes, section 553.837 (2026), read Oct 5, 2026
Who can install the roof on a new house in Orange County?
A builder may put on asphalt shingles itself, but only on a new building of its own construction. Tile, metal and membrane roofs need a roofing contractor with state certification or registration. A general contractor who advertises as a roofer without that license breaks Florida law. Orange County's Division of Building Safety handles the permit either way.
Source: Orange County Government, Division of Building Safety, read Oct 5, 2026
Nearby
New construction roofing near Southchase
Sources for this page(27)
- 1.U.S. Census Bureau, American Community Survey 2020-2024 5-year estimates (acs2024_5yr), via Census Reporter API, table B25035. Read Oct 5, 2026.
- 2.U.S. Census Bureau, American Community Survey 2020-2024 5-year estimates (acs2024_5yr), via Census Reporter API, table B25034. Read Oct 5, 2026.
- 3.U.S. Census Bureau, American Community Survey 2020-2024 5-year estimates (acs2024_5yr), via Census Reporter API, tables B25034/B25035. Read Oct 5, 2026.
- 4.Median year homes were built: 1997. U.S. Census Bureau, American Community Survey 2020-2024 5-year estimates (acs2024_5yr), via Census Reporter API. Read Oct 5, 2026.
- 5.Orange County Government, Division of Building Safety. Read Oct 5, 2026.
- 6.Permit office: Orange County Division of Building Safety. Orange County Division of Building Safety. Read Oct 10, 2026.
- 7.Share of homes built 2010 or later: 1.6%. U.S. Census Bureau, American Community Survey 2020-2024 5-year estimates (acs2024_5yr), via Census Reporter API. Read Oct 5, 2026.
- 8.FRSA, "New 2023 FBC Eighth Edition is Now in Effect", 2024-02-13. Read Oct 5, 2026.
- 9.Miami-Dade County RER notice. Read Oct 5, 2026.
- 10.2023 Florida Building Code, Residential, 8th ed., Chapter 8 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
- 11.2023 Florida Building Code, Residential, 8th ed., Chapter 9 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
- 12.Florida Statutes, section 553.842 (2026). Read Oct 5, 2026.
- 13.Florida Building Commission. Read Oct 5, 2026.
- 14.2023 Florida Building Code, Building, 8th ed., Chapter 1 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
- 15.Florida Statutes, section 489.113 (2026). Read Oct 5, 2026.
- 16.2023 Florida Building Code, Building, 8th ed., Chapter 15 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
- 17.Florida Statutes, section 553.837 (2026). Read Oct 5, 2026.
- 18.Florida Statutes, section 713.135 (2026), Florida Legislature. Read Oct 5, 2026.
- 19.Orange County Division of Building Safety, ocfl.net. Read Oct 5, 2026.
- 20.U.S. Census Bureau, American Community Survey 2020-2024 5-year estimates (acs2024_5yr), via Census Reporter API, U.S. Census Bureau (via Census Reporter). Read Oct 5, 2026.
- 21.Florida Statutes, section 627.7011 (2026), Florida Legislature. Read Oct 4, 2026.
- 22.NOAA NCEI, U.S. Climate Normals 1991-2020 (annual/seasonal), access-data API, NOAA National Centers for Environmental Information. Read Oct 5, 2026.
- 23.NWS Melbourne, Post Tropical Cyclone Report: Hurricane Matthew (2016), National Weather Service. Read Oct 5, 2026.
- 24.NWS Melbourne, Post Tropical Cyclone Report: Hurricane Irma (2017), National Weather Service. Read Oct 5, 2026.
- 25.NOAA Atlas 14 Volume 9 version 2, partial-duration intensity estimates at the Southchase 2020 Census internal point (28.3792, -81.3903), NOAA Hydrometeorological Design Studies Center. Read Oct 5, 2026.
- 26.NOAA Atlas 14 Volume 9 version 2, partial-duration 24-hour depth estimates at the Southchase 2020 Census internal point (28.3792, -81.3903), NOAA Hydrometeorological Design Studies Center. Read Oct 5, 2026.
- 27.NWS Melbourne, Lightning Information Center, National Weather Service. Read Oct 5, 2026.
South Fork Roofing
New construction roofing in Southchase
Answer a few questions about the job, or call.
