Skip to content

Re-roofs · Pinewood

Roof replacement in Pinewood, FL

In Pinewood, 76.1 percent of homes were built before 1980, against 49.6 percent across Miami-Dade County. That suggests many roofs here have been redone at least once, and some are older than any insurer likes. A replacement triggers a county permit, two inspections and code upgrades.

Updated October 2026

Drone view looking down on a gray-blend shingle roof with two front gables, a debris container and a pickup in the driveway beyond.

Pinewood figures this page uses

Median year homes were built
1963
Share of homes built 2010 or later
4.4%
Single-family detached share of housing units
43.3%
Mobile homes, share of housing units
6.3%

Home age

What older homes mean for your roof

Homes in Pinewood have a median build year of 1963, compared with 1980 for the county as a whole. Just 4.4 percent of the homes in this area were built in 2010 or after. That suggests few roofs in town started life under recent wind rules, and an older house often has an older deck under the covering.

Age also matters to your insurer. If your roof is 15 years old or more, Florida law allows you to pay for an authorized inspector to check it. If the inspection shows 5 or more years of useful life left, the insurer cannot refuse or non-renew you solely because of age. Citizens asks for documented remaining life on soft roofs past 25 years.

Only 43.3 percent of Pinewood housing units are single-family detached, and 6.3 percent are mobile homes. Mobile homes follow the HUD code, so confirm the roof rules for yours with the county building office.

Permit and inspections

What a Pinewood re-roof requires

Pinewood is an unincorporated area, so Miami-Dade County Regulatory and Economic Resources (RER), Building & Permits, issues your roof permit. The county sits in the strict hurricane provisions South Florida adopted after Hurricane Andrew. Every roofing job needs a Uniform Roofing Permit Application signed by a licensed contractor, with product approval pages and the owner notification attached.

The deck comes first. A new roof system cannot go over sheathing that has soaked up water, broken down, or been fastened in a way that falls short of code. A roofing contractor's scope includes required deck attachments and replacing bad sheathing. If the old roof has two or more layers, it must come off to the deck.

Before work starts, the owner must record a Notice of Commencement, and the permit card warns that skipping it may mean paying twice. A permit also lapses when work has not started within 6 months after the permit is issued.

Timing

Which code edition applies to your permit

The edition in force on the day you apply sets the rules for your Pinewood job. The Eighth Edition has applied since December 31, 2023, and the Ninth takes over for applications filed on or after December 31, 2026. A county permit clerk can tell you which one covers your filing date.

Questions

Roof replacement in Pinewood: questions

What is the 25% roof rule in Florida?

No more than 25 percent of a roof section may be repaired, replaced or recovered in any 12-month period unless the entire section meets current code. You qualify for relief when the current roof was built, repaired or replaced under the 2007 Florida Building Code or a later edition. With a median build year of 1963 in Pinewood, many roofs here may not qualify for that relief, so ask the Miami-Dade County permit office about yours.

Source: 2023 Florida Building Code, Building, 8th ed., Chapter 15 (UpCodes viewer, unofficial transcription), read Oct 5, 2026

Related: Roof replacement

Who issues a roof permit in Pinewood?

Miami-Dade County Regulatory and Economic Resources (RER), Building & Permits, issues roof permits in Pinewood, because it is an unincorporated area. The county follows the strict hurricane provisions adopted after Hurricane Andrew, so the application is the Uniform Roofing Permit Application, signed by a licensed contractor. It carries the owner notification and product approval pages. Check the latest steps with the county building office before you proceed.

Source: Miami-Dade County Regulatory and Economic Resources (RER) - Building & Permits, read Oct 5, 2026

Related: Roof replacement

Does my roof's age affect my insurance in Pinewood?

It can. Here 76.1 percent of homes predate 1980, so many owners face this question. Florida law lets the owner of a roof that is 15 years or older hire an authorized inspector to examine it, at the owner's expense. When an inspection finds 5 or more years of useful life left on your roof, the insurer cannot deny coverage or decline to renew on the basis of age alone. Your insurer or agent can say what that means for your policy.

Source: U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25034, via Census Reporter API, read Oct 5, 2026

Related: Roof replacement

Do I need to tear off my old roof?

Sometimes. In Miami-Dade County, a full tear-off to the deck is required if the existing roof has two or more layers, is water soaked, or is wood shake, slate, clay or cement tile. A new system also cannot go over sheathing that is not properly fastened. With Pinewood's median home built in 1963, an inspection of the deck is wise.

Source: 2023 Florida Building Code, Building, 8th ed., Chapter 15 (UpCodes viewer, unofficial transcription), read Oct 5, 2026

Related: Roof replacement

Nearby

Roof replacement near Pinewood

Sources for this page(28)
  1. 1.Median year homes were built: 1963. U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25035, via Census Reporter API. Read Oct 5, 2026.
  2. 2.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25035, via Census Reporter API. Read Oct 5, 2026.
  3. 3.Share of homes built 2010 or later: 4.4%. U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25034, via Census Reporter API. Read Oct 5, 2026.
  4. 4.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25035, B25034, B25024, via Census Reporter API. Read Oct 5, 2026.
  5. 5.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25034, via Census Reporter API. Read Oct 5, 2026.
  6. 6.Single-family detached share of housing units: 43.3%. U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25024, via Census Reporter API. Read Oct 5, 2026.
  7. 7.Mobile homes, share of housing units: 6.3%. U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25024, via Census Reporter API. Read Oct 5, 2026.
  8. 8.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25024, via Census Reporter API. Read Oct 5, 2026.
  9. 9.Permit office: Miami-Dade County Regulatory and Economic Resources (RER) - Building & Permits. Miami-Dade County Regulatory and Economic Resources (RER) - Building & Permits. Read Oct 10, 2026.
  10. 10.Florida Building Commission, 'Setting New Standards for Safety: The Florida Building Code' (2004 publication; wind-speed figures in it are outdated and not used). Read Oct 5, 2026.
  11. 11.Share of homes built before 1980: 76.1%. U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25034, via Census Reporter API. Read Oct 5, 2026.
  12. 12.Florida Statutes, section 627.7011 (2026). Read Oct 4, 2026.
  13. 13.Citizens Property Insurance Corporation, inspections FAQ (updated 2026-03-17). Read Oct 4, 2026.
  14. 14.2023 Florida Building Code, Building, 8th ed., Chapter 15 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
  15. 15.Fla. Stat. 489.105(3)(e). Read Oct 5, 2026.
  16. 16.2023 Florida Building Code, Building, 8th ed., Chapter 1 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
  17. 17.Florida Statutes, section 553.844 (2026). Read Oct 5, 2026.
  18. 18.FRSA, "New 2023 FBC Eighth Edition is Now in Effect", 2024-02-13. Read Oct 5, 2026.
  19. 19.Miami-Dade County RER notice. Read Oct 5, 2026.
  20. 20.Miami-Dade County Regulatory and Economic Resources (RER) - Building & Permits, Miami. Read Oct 5, 2026.
  21. 21.Florida Statutes, section 713.135 (2026), Florida Legislature. Read Oct 5, 2026.
  22. 22.miamidade.gov, miamidade.gov. Read Oct 5, 2026.
  23. 23.NOAA NCEI U.S. Climate Normals 1991-2020 (access data service), NOAA National Centers for Environmental Information. Read Oct 5, 2026.
  24. 24.NOAA NCEI U.S. Climate Normals 1991-2020 (access data service), NOAA National Centers for Environmental Information. Read Oct 5, 2026.
  25. 25.NOAA National Hurricane Center, Tropical Cyclone Climatology, NOAA National Hurricane Center. Read Oct 5, 2026.
  26. 26.NOAA Atlas 14 Volume 9 version 2, partial-duration 24-hour depth estimates at the Pinewood 2020 Census internal point (25.8694, -80.2171), NOAA Hydrometeorological Design Studies Center. Read Oct 5, 2026.
  27. 27.NOAA National Hurricane Center, Tropical Cyclone Report: Hurricane Irma (AL112017), NOAA National Hurricane Center. Read Oct 5, 2026.
  28. 28.U.S. Census Bureau, 2020 Census counts (POP100, HU100) via TIGERweb tigerWMS_Census2020 layer 28 (Census Designated Places), U.S. Census Bureau. Read Oct 5, 2026.

South Fork Roofing

Roof replacement in Pinewood

Answer a few questions about the job, or call.

CallFree estimate