Commercial roofs · Pinewood
Commercial roofing in Pinewood, FL
In Pinewood, 25.4 percent of homes sit in buildings with 10 or more units, so many commercial and association roofs here are multi-unit systems. Your bid comparison should start there, with the building type and the permit rules that come with it.
Updated October 2026

Building stock
Why Pinewood building stock changes a commercial roof bid
Pinewood's housing is older than the Miami-Dade County norm. The median home was built in 1963, while the county median is 1980. About 76.1 percent of units predate 1980. For a property manager, that means older low-slope roofs on multi-unit buildings are likely to have layered covers or deck problems that a bid must address.
Your bid should state whether the scope includes deck inspection. Under the Florida Building Code, a roof cannot be recovered when the deck is water soaked or deteriorated, and a tear-off to the deck is required when there are already two or more coverings. Ask each bidder how they will find that out before pricing.
Permits and code
Permits and code rules that apply in Pinewood
Miami-Dade County is one of the two counties inside the High-Velocity Hurricane Zone, and Pinewood operates there. That zone carries stronger roofing provisions than the rest of Florida. Here, every roofing job needs an HVHZ Uniform Roofing Permit Application completed by a licensed contractor, and the county building office issues these permits for this unincorporated community.
- Confirm the permit application is an HVHZ Uniform Roofing Permit Application.
- Ask for product approval and the Miami-Dade Notice of Acceptance number for each roof component.
- Check that each product approval carries an expiration date that has not passed.
Questions
Commercial roofing in Pinewood: questions
Who issues roof permits in Pinewood?
The Miami-Dade County Regulatory and Economic Resources department issues roof permits for Pinewood, which is an unincorporated community. Because Pinewood is in the High-Velocity Hurricane Zone, the permit must be an HVHZ Uniform Roofing Permit Application completed by a licensed contractor. Confirm the current process on the county building page before you schedule work.
Source: Miami-Dade County Regulatory and Economic Resources (RER) - Building & Permits, read Oct 5, 2026
What is the 25% roof rule in Florida?
The rule says that no more than 25 percent of the total roof area can be repaired, replaced or recovered in any 12-month period unless the entire roof system is replaced or recovered. When your existing roof was built or repaired under the 2007 Florida Building Code or a newer edition, only the section that was repaired has to satisfy current code. Your building office or contractor should confirm how this applies to your building.
Source: 2023 Florida Building Code, Building, 8th ed., Chapter 15 (UpCodes viewer, unofficial transcription), read Oct 5, 2026
What is the new law in Florida about roofs?
The Ninth Edition of the Florida Building Code takes effect on December 31, 2026. If you submit a permit application or a set of plans on or after that date, the new edition's requirements will apply to it. If you plan a Pinewood roof project near that date, ask your contractor which edition the permit will fall under.
Source: Miami-Dade County RER notice, read Oct 5, 2026
Sources for this page(20)
- 1.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25035, via Census Reporter API. Read Oct 5, 2026.
- 2.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25034, via Census Reporter API. Read Oct 5, 2026.
- 3.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25035, B25034, B25024, via Census Reporter API. Read Oct 5, 2026.
- 4.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25024, via Census Reporter API. Read Oct 5, 2026.
- 5.Florida Building Commission, 'Setting New Standards for Safety: The Florida Building Code' (2004 publication; wind-speed figures in it are outdated and not used). Read Oct 5, 2026.
- 6.Permit office: Miami-Dade County Regulatory and Economic Resources (RER) - Building & Permits. Miami-Dade County Regulatory and Economic Resources (RER) - Building & Permits. Read Oct 10, 2026.
- 7.Miami-Dade County RER, Board and Code Administration Division, Product Approval. Read Oct 5, 2026.
- 8.Share of homes in buildings with 10+ units: 25.4%. U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25024, via Census Reporter API. Read Oct 5, 2026.
- 9.2023 Florida Building Code, Building, 8th ed., Chapter 15 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026. FBC text read from UpCodes (unofficial transcription): check floridabuilding.org or the ICC viewer before quoting (spec 8.7). Source URL inherited from C-14 (the research cites it "as C-14").
- 10.miamidade.gov. Read Oct 5, 2026.
- 11.Miami-Dade County RER notice. Read Oct 5, 2026.
- 12.Miami-Dade County Regulatory and Economic Resources (RER) - Building & Permits, Miami. Read Oct 5, 2026.
- 13.Citizens Property Insurance Corporation, inspections FAQ (updated 2026-03-17), Citizens Property Insurance. Read Oct 4, 2026.
- 14.2023 Florida Building Code, Building, 8th ed., Chapter 1 (UpCodes viewer, unofficial transcription), UpCodes (Florida Building Code transcription). Read Oct 5, 2026.
- 15.NOAA National Hurricane Center, Tropical Cyclone Climatology, NOAA National Hurricane Center. Read Oct 5, 2026.
- 16.NOAA National Hurricane Center, Tropical Cyclone Report: Hurricane Irma (AL112017), NOAA National Hurricane Center. Read Oct 5, 2026.
- 17.NOAA NCEI U.S. Climate Normals 1991-2020 (access data service), NOAA National Centers for Environmental Information. Read Oct 5, 2026.
- 18.NOAA Atlas 14 Volume 9 version 2, partial-duration intensity estimates at the Pinewood 2020 Census internal point (25.8694, -80.2171), NOAA Hydrometeorological Design Studies Center. Read Oct 5, 2026.
- 19.NOAA Atlas 14 Volume 9 version 2, partial-duration 24-hour depth estimates at the Pinewood 2020 Census internal point (25.8694, -80.2171), NOAA Hydrometeorological Design Studies Center. Read Oct 5, 2026.
- 20.FRSA, "New 2023 FBC Eighth Edition is Now in Effect", 2024-02-13, floridaroof.com. Read Oct 5, 2026.
South Fork Roofing
Commercial roofing in Pinewood
Answer a few questions about the job, or call.
