New construction · Miami Lakes
New construction roofing in Miami Lakes, FL
In Miami Lakes, 13.3 percent of homes were built in 2010 or later, so most roofs here are not new and new builds are the minority. Any new roof still falls under Miami-Dade's High Velocity Hurricane Zone rules, and permit applications on or after December 31, 2026 must meet the Ninth Edition code.
Updated October 2026

Our workLocal growth
How new is Miami Lakes housing, and how fast is it building?
Homes in Miami Lakes are newer than most of the county, with a median build year of 1989 compared with 1980 across Miami-Dade. That makes the town newer than the county, though far from brand new. The census building-permit file lists 206 new single-family homes permitted here in 2025, with part of that count imputed by the Census.
The town was master-planned by Lester Collins on the Graham family's former dairy farm and incorporated in December 2000. Newer lots here tend to be infill, so a builder often schedules the roof around neighboring finished homes and tight access along the curving streets. Roof permits go through the Town of Miami Lakes Building office.
Code and approvals
Which code and product rules apply to a new roof here?
Miami-Dade is one of two counties in the High Velocity Hurricane Zone, so roofing here follows stricter hurricane provisions than most of Florida. Miami-Dade's Product Control Section reviews and approves roofing products and certifies the labs that test them. The uniform roofing permit application carries the product approval or Notice of Commencement-style paperwork numbers, along with the owner's notification.
On a new home, roofing is a mandatory statewide-approval category, and a product may not be marketed as hurricane protection unless it is approved. A Miami-Dade Notice of Acceptance expires on its stated date, and a copy must be at the job site for the building official.
Who installs matters too. A builder may put on asphalt shingles itself only on its own new building. Tile, metal and membrane jobs go to a contractor holding a certified or registered credential.
Build sequence
Deck, underlayment and inspection order
Roof sheathing is nailed with ring shank nails, 2 1/2 inches long by 0.131 inch, under the residential code. Dry-in then follows one of three options: a fully self-adhering membrane, a 3 3/4-inch tape or membrane strip over every deck joint plus underlayment, or two layers of felt-type underlayment.
- Framing inspection comes once the roof framing and bracing are in place
- Sheathing, including fasteners and roof dry-in
- Roofing: dry-in, insulation, coverings, flashing
- Final
Plan the roof inspection into the build schedule, since a permit goes invalid if work stops for 6 months. Gutters with downspouts are required where eaves project under 6 inches, and downspouts discharge at least 1 foot from the wall.
Questions
New construction roofing in Miami Lakes: questions
Which building code applies to a new roof permit in Miami Lakes?
Since December 31, 2023, the Eighth Edition of the 2023 Florida Building Code has been the one in effect. Any permit application and plans submitted on or after December 31, 2026 have to satisfy the Ninth (2026) Edition. Miami Lakes sits in Miami-Dade County, one of two counties in the High Velocity Hurricane Zone, so the HVHZ provisions apply on top of the base code. Confirm the edition for your submittal date with the Town of Miami Lakes Building office.
Source: Florida Building Commission, 'Setting New Standards for Safety: The Florida Building Code' (2004 publication; wind-speed figures in it are outdated and not used), read Oct 5, 2026
Does the 25 percent roof rule apply to a new Miami Lakes home?
The 25 percent rule governs existing roofs. Not more than 25 percent of the roof area or section may be repaired, replaced or recovered in any 12-month period unless the whole roof or section is replaced. An exception covers a roof built, repaired or replaced under the 2007 Florida Building Code or later, where only the repaired part must meet current code. A newly built roof starts under current code.
Source: U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25034, via Census Reporter API, read Oct 5, 2026
Who warrants a new roof on a home built in Miami Lakes?
Since July 1, 2025, Florida Statute 553.837 requires a builder to warrant a newly constructed home for 1 year against defects in equipment, material or workmanship that cause a material violation of the Florida Building Code. Normal wear and tear, settling, defects caused by the owner and acts of God all fall outside its coverage. With 206 new single-family homes permitted here in 2025, this rule reaches many new Miami Lakes buyers.
Source: U.S. Census Bureau, Building Permits Survey, 2025 annual place file (so2025a.txt), read Oct 5, 2026
Can I use a private inspector for my new roof in Miami Lakes?
Yes. Under Florida Statute 553.791, the fee owner, or the owner's contractor with explicit written authorization, may choose at any time to use a private provider for plans review or code inspection. Someone acting as a private provider holds a license as a building code administrator, engineer or architect. Roof permits themselves still go through the Town of Miami Lakes Building office, so confirm how private provider reports are filed there.
Source: Town of Miami Lakes - Building, read Oct 5, 2026
Sources for this page(34)
- 1.Median year homes were built: 1989. U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25035, via Census Reporter API. Read Oct 5, 2026.
- 2.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25035, via Census Reporter API. Read Oct 5, 2026.
- 3.U.S. Census Bureau, Building Permits Survey, 2025 annual place file (so2025a.txt). Read Oct 5, 2026.
- 4.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25035, B25034, B25024, via Census Reporter API. Read Oct 5, 2026.
- 5.U.S. Census Bureau, Building Permits Survey county annual files (co2025a.txt, co2020a.txt). Read Oct 5, 2026.
- 6.Wikipedia, 'Miami Lakes, Florida' (revision 1378572996). Read Oct 5, 2026.
- 7.Permit office: Town of Miami Lakes - Building. Town of Miami Lakes - Building. Read Oct 10, 2026.
- 8.Florida Building Commission, 'Setting New Standards for Safety: The Florida Building Code' (2004 publication; wind-speed figures in it are outdated and not used). Read Oct 5, 2026.
- 9.Miami-Dade County RER, Board and Code Administration Division, Product Approval. Read Oct 5, 2026.
- 10.Share of homes built 2010 or later: 13.3%. U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25034, via Census Reporter API. Read Oct 5, 2026.
- 11.FBC-Building 2023 Chapter 2 definitions. Read Oct 5, 2026.
- 12.Florida Statutes, section 553.842 (2026). Read Oct 5, 2026.
- 13.miamidade.gov. Read Oct 5, 2026.
- 14.Florida Statutes, section 489.113 (2026). Read Oct 5, 2026.
- 15.2023 Florida Building Code, Residential, 8th ed., Chapter 8 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
- 16.2023 Florida Building Code, Residential, 8th ed., Chapter 9 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
- 17.2023 Florida Building Code, Building, 8th ed., Chapter 1 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
- 18.2023 Florida Building Code, Residential, 8th ed., Chapter 3 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
- 19.Miami-Dade County RER notice. Read Oct 5, 2026.
- 20.FRSA, "New 2023 FBC Eighth Edition is Now in Effect", 2024-02-13. Read Oct 5, 2026.
- 21.2023 Florida Building Code, Building, 8th ed., Chapter 15 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
- 22.Florida Statutes, section 553.837 (2026). Read Oct 5, 2026.
- 23.Florida Statutes, section 553.791 (2026). Read Oct 5, 2026.
- 24.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25034, via Census Reporter API, U.S. Census Bureau (via Census Reporter). Read Oct 5, 2026.
- 25.Town of Miami Lakes - Building, Town of Miami Lakes. Read Oct 5, 2026.
- 26.Wikipedia, 'List of municipalities in Florida', Wikipedia. Read Oct 5, 2026.
- 27.Florida Statutes, section 627.7011 (2026), Florida Legislature. Read Oct 4, 2026.
- 28.Florida Statutes, section 713.135 (2026), Florida Legislature. Read Oct 5, 2026.
- 29.NOAA NCEI U.S. Climate Normals 1991-2020 (access data service), NOAA National Centers for Environmental Information. Read Oct 5, 2026.
- 30.NOAA National Hurricane Center, Tropical Cyclone Climatology, NOAA National Hurricane Center. Read Oct 5, 2026.
- 31.NOAA National Hurricane Center, Tropical Cyclone Report: Hurricane Irma (AL112017), NOAA National Hurricane Center. Read Oct 5, 2026.
- 32.NOAA Atlas 14 Volume 9 version 2, partial-duration 24-hour depth estimates at the Miami Lakes 2020 Census internal point (25.9127, -80.3204), NOAA Hydrometeorological Design Studies Center. Read Oct 5, 2026.
- 33.NOAA Atlas 14 Volume 9 version 2, partial-duration intensity estimates at the Miami Lakes 2020 Census internal point (25.9127, -80.3204), NOAA Hydrometeorological Design Studies Center. Read Oct 5, 2026.
- 34.Florida Building Commission, Florida Building Commission. Read Oct 5, 2026.
South Fork Roofing
New construction roofing in Miami Lakes
Answer a few questions about the job, or call.
