New construction · Miami Gardens
New construction roofing in Miami Gardens, FL
Only 5.8 percent of Miami Gardens homes were built in 2010 or later, so a new roof here is the exception on most blocks. Any new build sits in Miami-Dade County's High Velocity Hurricane Zone. That means roofing products need approval before they go on your permit.
Updated October 2026

Our workCode and permits
Which code edition your Miami Gardens permit faces
Since December 31, 2023, the 2023 Florida Building Code, Eighth Edition, has been the code in force. Permit applications and plans submitted on or after December 31, 2026 fall under the Ninth Edition. If your plans are close to that date, the filing date decides which book the plan reviewer uses.
Miami Gardens issues permits through City of Miami Gardens Building Services. Your roofing contractor should put the product approval numbers on the application. In the High Velocity zone, that means the Miami-Dade Notice of Acceptance numbers. Keep a full copy of each notice at the job site, because the building official can ask to see it.
Miami-Dade's Product Control Section approves or denies roofing products and certifies the labs that test them. A notice carries an expiration date, so check that yours has not run out before the product is installed.
What the code requires
On a new roof, the deck, the underlayment and the drip edge all go in
Ring shank nails are required for fastening roof sheathing. The standard is 2 1/2 inch by 0.131 inch nails with a 0.281 inch head. Smaller ring shank types are allowed only where the sheathing is 15/32 inch or thinner.
For shingle and metal roofs, you have to use one of three approved dry-in methods. Self-adhering membrane laid across the entire deck is one such option. Another is a strip of membrane or tape, at least 3 3/4 inches wide, over every deck joint, with underlayment on top. Under the third method, you fasten two layers of felt-type underlayment 12 inches apart across the field and 6 inches apart at the laps.
At eaves and gables, the drip edge is installed on top of the underlayment. Fastening is 12 inches apart, or 4 inches apart where design wind speed is 110 mph or more. Gutters with downspouts are required where eaves project less than 6 inches, and downspouts must discharge at least 1 foot from the wall.
Inspections and trades
Scheduling the roof with the build
The code sets the inspection sequence as foundation, framing, sheathing, exterior wall coverings, roofing, and then the final inspection. The roofing inspection covers the dry-in, the insulation, the roof coverings and the flashing. Roofing cannot be signed off until the sheathing inspection has passed.
Miami-Dade County permitted 2,666 single-family units in 2025, up from 2,133 in 2020. Roofers get booked ahead on a market like that, so set the roofing slot when you set the framing schedule.
Only on a new building it built itself may a general contractor put on asphalt shingles with its own crew. A certified or registered roofing contractor handles tile, metal and membrane work. Before the first inspection, you need to record the Notice of Commencement and post it.
Questions
New construction roofing in Miami Gardens: questions
Does a new roof in Miami Gardens need Miami-Dade product approval?
Yes. Miami Gardens is in Miami-Dade County, one of the two counties in the High Velocity Hurricane Zone. Roofing is a mandatory statewide-approval category, and in this zone the permit application carries the product approval or Notice of Acceptance numbers. Miami-Dade's Product Control Section reviews roofing products and certifies the labs that test them. Ask your contractor for the notice number and expiration date before you sign.
Source: Florida Building Commission, 'Setting New Standards for Safety: The Florida Building Code' (2004 publication; wind-speed figures in it are outdated and not used), read Oct 5, 2026
Which Florida Building Code edition applies to a new roof permit in Miami Gardens?
The 2023 Eighth Edition applies today. Applications and plans submitted on or after December 31, 2026 must meet the Ninth (2026) Edition. The submission date, not the start of work, decides it. If your plans are close to that date, ask City of Miami Gardens Building Services which edition your filing date falls under.
Source: City of Miami Gardens - Building Services, read Oct 5, 2026
Can my general contractor install the roof on a new home?
Only in one case. On a new building of its own construction, a general, building or residential contractor can install asphalt or fiberglass shingles as well as wood shingles and shakes. For tile, metal and membrane roofs, you must hire a certified or registered roofing contractor. A general contractor also may not advertise as a roofer without that certification or registration. Keep in mind that the median home in this area was built in 1970, so many roofs here are replacements on older houses, which is a different situation from a new build.
Source: Florida Statutes, section 489.113 (2026), read Oct 5, 2026
What does the builder owe me if a new roof fails in the first year?
Since July 1, 2025, Florida law requires a builder to warrant a newly constructed home for 1 year against defects in equipment, material or workmanship that cause a material Florida Building Code violation. The year runs from the transfer of title or first occupancy, whichever comes first. Natural disasters, settling, defects the owner caused, and normal wear and tear are not covered. Go through your contract carefully, then put your question to the builder in writing.
Source: Florida Statutes, section 553.837 (2026), read Oct 5, 2026
Nearby
New construction roofing near Miami Gardens
Sources for this page(32)
- 1.Permit office: City of Miami Gardens - Building Services. City of Miami Gardens - Building Services. Read Oct 10, 2026.
- 2.Miami-Dade County RER, Board and Code Administration Division, Product Approval. Read Oct 5, 2026.
- 3.U.S. Census Bureau, Building Permits Survey county annual files (co2025a.txt, co2020a.txt). Read Oct 5, 2026.
- 4.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25035, via Census Reporter API. Read Oct 5, 2026.
- 5.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25034, via Census Reporter API. Read Oct 5, 2026.
- 6.Share of homes built 2010 or later: 5.8%. U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25034, via Census Reporter API. Read Oct 5, 2026.
- 7.Florida Building Commission, 'Setting New Standards for Safety: The Florida Building Code' (2004 publication; wind-speed figures in it are outdated and not used). Read Oct 5, 2026.
- 8.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25035, B25034, B25024, via Census Reporter API. Read Oct 5, 2026.
- 9.Median year homes were built: 1970. U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25035, via Census Reporter API. Read Oct 5, 2026.
- 10.FRSA, "New 2023 FBC Eighth Edition is Now in Effect", 2024-02-13. Read Oct 5, 2026.
- 11.Miami-Dade County RER notice. Read Oct 5, 2026.
- 12.Florida Statutes, section 553.842 (2026). Read Oct 5, 2026.
- 13.miamidade.gov. Read Oct 5, 2026.
- 14.2023 Florida Building Code, Residential, 8th ed., Chapter 8 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
- 15.2023 Florida Building Code, Residential, 8th ed., Chapter 9 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
- 16.2023 Florida Building Code, Residential, 8th ed., Chapter 3 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
- 17.2023 Florida Building Code, Building, 8th ed., Chapter 1 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
- 18.Florida Statutes, section 489.113 (2026). Read Oct 5, 2026.
- 19.FBC-Building 2023 Chapter 2 definitions. Read Oct 5, 2026.
- 20.Florida Statutes, section 553.837 (2026). Read Oct 5, 2026.
- 21.City of Miami Gardens - Building Services, City of Miami Gardens. Read Oct 5, 2026.
- 22.Florida Statutes, section 713.135 (2026), Florida Legislature. Read Oct 5, 2026.
- 23.Citizens Property Insurance Corporation, inspections FAQ (updated 2026-03-17), Citizens Property Insurance. Read Oct 4, 2026.
- 24.2023 Florida Building Code, Building, 8th ed., Chapter 15 (UpCodes viewer, unofficial transcription), UpCodes (Florida Building Code transcription). Read Oct 5, 2026.
- 25.NOAA NCEI U.S. Climate Normals 1991-2020 (access data service), NOAA National Centers for Environmental Information. Read Oct 5, 2026.
- 26.NOAA NCEI U.S. Climate Normals 1991-2020 (access data service), NOAA National Centers for Environmental Information. Read Oct 5, 2026.
- 27.NOAA National Hurricane Center, Tropical Cyclone Climatology, NOAA National Hurricane Center. Read Oct 5, 2026.
- 28.NOAA National Hurricane Center, Tropical Cyclone Report: Hurricane Irma (AL112017), NOAA National Hurricane Center. Read Oct 5, 2026.
- 29.NOAA Atlas 14 Volume 9 version 2, partial-duration intensity estimates at the Miami Gardens 2020 Census internal point (25.9487, -80.2436), NOAA Hydrometeorological Design Studies Center. Read Oct 5, 2026.
- 30.NOAA Atlas 14 Volume 9 version 2, partial-duration 24-hour depth estimates at the Miami Gardens 2020 Census internal point (25.9487, -80.2436), NOAA Hydrometeorological Design Studies Center. Read Oct 5, 2026.
- 31.Wikipedia, 'Miami Gardens, Florida' (revision 1374541944), Wikipedia. Read Oct 5, 2026.
- 32.Wikipedia, 'List of municipalities in Florida', Wikipedia. Read Oct 5, 2026.