Skip to content

Miami-Dade County ยท Town

Roofing in Miami Lakes, Florida

Homes in Miami Lakes were typically constructed around 1989, while the countywide figure for Miami-Dade is 1980. That is newer housing than most of the county. It also means many original roofs here are likely past the 15-year mark that triggers insurer inspection rules. Permits come from the Town of Miami Lakes Building office, and the county's hurricane zone rules apply.

Updated October 2026

A white Town of Miami Lakes entrance sign stands beside tall palm trees under a blue sky.
Photo: Miami Lakes Drive Entrance Feature by Town of Miami Lakes, CC BY-SA 4.0, cropped

At a glance

Miami Lakes homes at a glance

People (2020 Census)
30,467
Median year homes were built
1989
Share of homes built before 1980
31.4%
Share of homes built 2010 or later
13.3%
Owner-occupied share of occupied homes
59.8%

Census figures; each one is listed in the sources at the end of this page.

Housing age

Because most houses here date from about 1989, roof age is a practical concern to plan around

The town was master-planned by Lester Collins on a former dairy farm and incorporated in December 2000. Even so, 31.4 percent of homes here were built before 1980, while 13.3 percent date from 2010 or later. Housing in this town is a mix of generations, so roof ages vary street by street.

A roof that is 15 years or older gets different treatment from your insurer. Under Florida law the insurer must let you hire an authorized inspector, at your expense, before requiring replacement. It may not refuse or non-renew you solely for age if that inspection shows 5 or more years of useful life left.

Single-family detached homes are exactly 50 percent of units here, and 22.8 percent of homes sit in buildings of 10 or more units. Condo and townhome roofs usually belong to an association, so ask your board who decides repairs. The town counts no mobile homes.

Repair limits

The 25 percent rule for Miami Lakes roof repairs

Florida's rule says you may not repair, replace or recover more than 25 percent of a roof section in any 12-month period unless the whole section is redone. Miami-Dade sits in the High Velocity Hurricane Zone, and the same wording appears in its section 1521.4.

One exception matters. If that roof itself was built, repaired or replaced under the 2007 Florida Building Code or later, only the repaired part must meet current code. Judge the roof's own work date, not your home's build year. A local government may not amend that exception.

  • Master-planned by Lester Collins on the Graham family's former dairy farm, with curving tree-shaded streets and many curving lakes; incorporated in December 2000.
  • Census building-permit data list 206 new single-family homes and 0 units in 5+ unit buildings permitted here in 2025; the file shows 0 months reported, so part of the count is Census-imputed.

Local rules

Permits and product approvals in Miami Lakes

Roof permits are handled by the Town of Miami Lakes Building office. In this county, roofing products are shown by a Miami-Dade Notice of Acceptance, and a copy must be available at the job site for the Building Official. A product sold as hurricane protection must have state approval.

Once a permit is issued, it goes invalid if work does not start within 6 months. Before the first inspection, a Notice of Commencement must be recorded and posted. Note that the permit card cautions you could end up paying a second time if you bypass it. Ask the building office if you are unsure.

Building permits

Town of Miami Lakes - Building

Official building page

Office names and links only. Fees, forms and timing change; check the official page.

Weather

Storms and rain your Miami Lakes roof faces

Miami International Airport receives 76.6 percent of its typical yearly rainfall between May and October, with June the heaviest month at 10.51 inches. The hurricane season runs June 1 to November 30, peaking September 10.

In 2017, Irma left roughly 1,000 homes across Miami-Dade with serious damage. Rain data for this town show a 100-year storm dropping 14.5 inches in 24 hours, and a 10-year storm brings 3.36 inches in one hour. Flashing and drainage details matter.

Questions

Miami Lakes roofing questions

What is the 25% roof rule in Florida?

Within any 12-month span, you may repair, replace or recover no more than 25 percent of a roof section, unless you replace or recover that whole section. That limit does not hold if your roof was built or fixed under the 2007 Florida Building Code or a newer edition. In Miami-Dade County, the High Velocity Hurricane Zone repeats the same rule. Confirm your roof's work history with the Town of Miami Lakes Building office.

Source: 2023 Florida Building Code, Building, 8th ed., Chapter 15 (UpCodes viewer, unofficial transcription), read Oct 5, 2026

Related: Roof replacement

Who issues roof permits in Miami Lakes?

For roof permits, contact the Town of Miami Lakes Building office. A permit becomes invalid if work does not start within 6 months of issue, or if work is suspended for 6 months. Record the Notice of Commencement and display it at the job site before the first inspection takes place. Check the town's Building page for current forms and fees.

Source: Town of Miami Lakes - Building, read Oct 5, 2026

Related: Roof replacement

My Miami Lakes roof is over 15 years old. Can my insurer drop me?

Replacement is not required on age alone when an inspection finds at least 5 years of useful life remaining. On a roof that is 15 years old or more, your insurer has to allow you to bring in an authorized inspector, paid by you, before it can demand replacement. With a median home build year of 1989 in this town, many owners may reach this point. Check the details of your coverage with your insurance company or agent.

Source: Florida Statutes, section 627.7011 (2026), read Oct 4, 2026

Related: Roof inspections

What roofing product approval does Miami-Dade County require?

Miami-Dade uses a Notice of Acceptance, which expires on a stated date and must be kept at the job site for the Building Official. The county is one of two in the High Velocity Hurricane Zone, a designation that reflects how exposed its housing stock is to strong winds. Many homes in the area were built around 1989, so older roofs often face the tightest review. Statewide approval is also required for roofing products, and you can search it by FL number in the Florida Building Commission lookup.

Source: Florida Building Commission, 'Setting New Standards for Safety: The Florida Building Code' (2004 publication; wind-speed figures in it are outdated and not used), read Oct 5, 2026

Related: Roof replacement

When is hurricane season, and when should I check my roof?

The Atlantic hurricane season runs June 1 to November 30, and activity peaks around September 10. Miami International Airport gets 76.6 percent of its yearly rain from May through October, so check for loose or damaged areas before late spring. The 2017 storm Irma seriously harmed close to 1,000 houses in Miami-Dade.

Source: NOAA National Hurricane Center, Tropical Cyclone Climatology, read Oct 5, 2026

Related: Roof repair

Nearby

Near Miami Lakes

Sources for this page(30)
  1. 1.Wikipedia, 'Miami Lakes, Florida' (revision 1378572996). Read Oct 5, 2026.
  2. 2.Share of homes built before 1980: 31.4%. U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25034, via Census Reporter API. Read Oct 5, 2026.
  3. 3.Share of homes built 2010 or later: 13.3%. U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25034, via Census Reporter API. Read Oct 5, 2026.
  4. 4.Year incorporated: 2000. Wikipedia, 'List of municipalities in Florida'. Read Oct 5, 2026.
  5. 5.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25035, via Census Reporter API. Read Oct 5, 2026.
  6. 6.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25035, B25034, B25024, via Census Reporter API. Read Oct 5, 2026.
  7. 7.Single-family detached share of housing units: 50%. U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25024, via Census Reporter API. Read Oct 5, 2026.
  8. 8.Share of homes in buildings with 10+ units: 22.8%. U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25024, via Census Reporter API. Read Oct 5, 2026.
  9. 9.Mobile homes, share of housing units: 0%. U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25024, via Census Reporter API. Read Oct 5, 2026.
  10. 10.Florida Building Commission, 'Setting New Standards for Safety: The Florida Building Code' (2004 publication; wind-speed figures in it are outdated and not used). Read Oct 5, 2026.
  11. 11.Permit office: Town of Miami Lakes - Building. Town of Miami Lakes - Building. Read Oct 10, 2026.
  12. 12.NOAA NCEI U.S. Climate Normals 1991-2020 (access data service). Read Oct 5, 2026.
  13. 13.NOAA National Hurricane Center, Tropical Cyclone Climatology. Read Oct 5, 2026.
  14. 14.Hurricane Irma (2017). NOAA National Hurricane Center, Tropical Cyclone Report: Hurricane Irma (AL112017). Read Oct 5, 2026.
  15. 15.Median year homes were built: 1989. U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25035, via Census Reporter API. Read Oct 5, 2026.
  16. 16.People (2020 Census): 30,467. U.S. Census Bureau, 2020 Census counts (POP100, HU100) via TIGERweb tigerWMS_Census2020 layer 26 (Incorporated Places). Read Oct 5, 2026.
  17. 17.Owner-occupied share of occupied homes: 59.8% (6,602 of 11,032). U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25003, via Census Reporter API. Read Oct 5, 2026.
  18. 18.U.S. Census Bureau, Building Permits Survey, 2025 annual place file (so2025a.txt). Read Oct 5, 2026.
  19. 19.Wikipedia, 'List of municipalities in Florida', Wikipedia. Read Oct 5, 2026.
  20. 20.Florida Statutes, section 627.7011 (2026), Florida Legislature. Read Oct 4, 2026.
  21. 21.2023 Florida Building Code, Building, 8th ed., Chapter 15 (UpCodes viewer, unofficial transcription), UpCodes (Florida Building Code transcription). Read Oct 5, 2026.
  22. 22.Town of Miami Lakes - Building, Town of Miami Lakes. Read Oct 5, 2026.
  23. 23.miamidade.gov, miamidade.gov. Read Oct 5, 2026.
  24. 24.Florida Statutes, section 553.842 (2026), Florida Legislature. Read Oct 5, 2026.
  25. 25.2023 Florida Building Code, Building, 8th ed., Chapter 1 (UpCodes viewer, unofficial transcription), UpCodes (Florida Building Code transcription). Read Oct 5, 2026.
  26. 26.Florida Statutes, section 713.135 (2026), Florida Legislature. Read Oct 5, 2026.
  27. 27.NOAA National Hurricane Center, Tropical Cyclone Report: Hurricane Irma (AL112017), NOAA National Hurricane Center. Read Oct 5, 2026.
  28. 28.NOAA Atlas 14 Volume 9 version 2, partial-duration 24-hour depth estimates at the Miami Lakes 2020 Census internal point (25.9127, -80.3204), NOAA Hydrometeorological Design Studies Center. Read Oct 5, 2026.
  29. 29.NOAA Atlas 14 Volume 9 version 2, partial-duration intensity estimates at the Miami Lakes 2020 Census internal point (25.9127, -80.3204), NOAA Hydrometeorological Design Studies Center. Read Oct 5, 2026.
  30. 30.Florida Building Commission, Florida Building Commission. Read Oct 5, 2026.

South Fork Roofing

Roofing in Miami Lakes: tell us about yours.

Answer a few questions about your roof, or call.

CallGet a quote