New construction · Kendall West

New construction roofing in Kendall West, FL

In Kendall West, just 2.2 percent of homes were built in 2010 or later, so a new roof here is a rare job. Farmland and undeveloped land border the area on the west and north. Any new roof falls under the High-Velocity Hurricane Zone rules, and the county building office issues the permit.

Updated October 2026

A roof deck sheathed in red-brown ZIP System panels with black seam tape, a bucket and a ladder on the deck, homes and a street behind.

Code and permit

Which code and permit office apply to a new Kendall West roof

No city building office exists for Kendall West, which is a census-designated place outside any municipality. Your roof permit comes from the Miami-Dade County building and permits office. The county sits in the High-Velocity Hurricane Zone, which Florida defines as Broward and Miami-Dade counties. That zone carries the strong provisions adopted after Hurricane Andrew.

The filing date decides which edition of the code your plans must meet. The 2023 edition has governed all work from December 31, 2023 onward. Applications filed on or after December 31, 2026 fall under the Ninth Edition, so a Kendall West plan set filed in late December could land under either one.

The county is building. It permitted 2,666 single-family units in 2025, against 2,133 in 2020. Even so, 2.2 percent of Kendall West homes date from 2010 or later, and the median home here was built in 1986, close to the 1980 county median.

Roof materials

Deck, underlayment and product approval

Roof sheathing must be fastened with ring shank nails measuring 2 1/2 inches by 0.131 inch, with a 0.281 inch head. For a shingle or metal roof, the dry-in has three allowed methods: a fully self-adhering membrane over the deck, a joint strip under approved underlayment, or two layers of felt fastened 12 inches apart in the field.

In Miami-Dade, the county Product Control Section reviews and approves or denies roofing systems, and it certifies the labs that test them. The product numbers go on your uniform roofing permit application. A Kendall West inspector can ask to see the full Notice of Acceptance on site, and it is void after its expiration date.

Drip edge goes on over the underlayment at eaves and gables. Fastener spacing tightens to 4 inches on center where wind speed is 110 mph or more. Tile follows the manufacturer's instructions or the Florida High Wind tile manual, and goes over solid sheathing.

Build schedule

Scheduling the roof and the inspections

The inspector visits in a fixed order, starting with the foundation and framing, then the sheathing, the exterior wall coverings and soffit, and the roofing, and ending with the final. Once the sheathing inspection passes, that is the point to schedule your roofer. The roofing inspection then looks at the dry-in, insulation, roof coverings and flashing.

Florida law lets a builder put asphalt or fiberglass shingles on its own new building. Tile, metal and membrane work must go to a contractor holding a roofing certificate or registration. In the High-Velocity Hurricane Zone, a permit that sits 6 months without a start becomes invalid, so match the permit date to the roofer's schedule.

Before the first inspection, get the Notice of Commencement recorded and put a copy on display at the job. The builder must also warrant a new home for 1 year against code-violating defects, and that excludes natural disasters.

Questions

New construction roofing in Kendall West: questions

Who issues a new construction roof permit in Kendall West?

Miami-Dade County Regulatory and Economic Resources issues it, because Kendall West is an unincorporated census-designated place with no city building office. Your plans go through the county, and the roofing product approval or Notice of Acceptance numbers belong on the application. Roofing falls under the High-Velocity Hurricane Zone, which covers Miami-Dade and Broward counties.

Source: Miami-Dade County Regulatory and Economic Resources (RER) - Building & Permits, read Oct 5, 2026

Related: New construction roofing

Which Florida Building Code edition applies to my new roof?

It depends on the filing date. Applications submitted before December 31, 2026 fall under the Eighth Edition, which has applied since December 31, 2023. Any plans turned in on or after December 31, 2026 have to meet the Ninth Edition. Confirm with the Miami-Dade building office which date your Kendall West application counts as filed.

Source: Miami-Dade County Regulatory and Economic Resources (RER) - Building & Permits, read Oct 5, 2026

Related: New construction roofing

Do roofing materials need approval in Miami-Dade?

Yes. Florida requires statewide approval for roofing, and Miami-Dade's Product Control Section approves or denies roofing systems and certifies the testing labs. A Notice of Acceptance is valid only until its expiration date. Keep a full copy at the Kendall West job site, because the building official can ask to see it.

Source: Miami-Dade County RER, Board and Code Administration Division, Product Approval, read Oct 5, 2026

Related: New construction roofing

What is the 25% roof rule in Florida?

Repairs under this rule cannot exceed 25 percent of a given roof section within any 12-month period. Go beyond that figure and the entire roof section has to be either replaced or recovered. You are exempt from that requirement if the roof was originally built, or later repaired or replaced, under the 2007 Florida Building Code or a newer one. A brand-new Kendall West roof built to current code would fall in that exception.

Source: U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25034, via Census Reporter API, read Oct 5, 2026

Related: New construction roofing

Nearby

New construction roofing near Kendall West

Sources for this page(31)
  1. 1.Permit office: Miami-Dade County Regulatory and Economic Resources (RER) - Building & Permits. Miami-Dade County Regulatory and Economic Resources (RER) - Building & Permits. Read Oct 10, 2026.
  2. 2.Florida Building Commission, 'Setting New Standards for Safety: The Florida Building Code' (2004 publication; wind-speed figures in it are outdated and not used). Read Oct 5, 2026.
  3. 3.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25035, via Census Reporter API. Read Oct 5, 2026.
  4. 4.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25024, via Census Reporter API. Read Oct 5, 2026.
  5. 5.U.S. Census Bureau, Building Permits Survey county annual files (co2025a.txt, co2020a.txt). Read Oct 5, 2026.
  6. 6.Share of homes built 2010 or later: 2.2%. U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25034, via Census Reporter API. Read Oct 5, 2026.
  7. 7.Median year homes were built: 1986. U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25035, via Census Reporter API. Read Oct 5, 2026.
  8. 8.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25035, B25034, B25024, via Census Reporter API. Read Oct 5, 2026.
  9. 9.Miami-Dade County RER, Board and Code Administration Division, Product Approval. Read Oct 5, 2026.
  10. 10.Wikipedia, 'Kendall West, Florida' (revision 1374451119). Read Oct 5, 2026.
  11. 11.FBC-Building 2023 Chapter 2 definitions. Read Oct 5, 2026.
  12. 12.FRSA, "New 2023 FBC Eighth Edition is Now in Effect", 2024-02-13. Read Oct 5, 2026.
  13. 13.Miami-Dade County RER notice. Read Oct 5, 2026.
  14. 14.2023 Florida Building Code, Residential, 8th ed., Chapter 8 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
  15. 15.2023 Florida Building Code, Residential, 8th ed., Chapter 9 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
  16. 16.miamidade.gov. Read Oct 5, 2026.
  17. 17.Florida Statutes, section 553.842 (2026). Read Oct 5, 2026.
  18. 18.2023 Florida Building Code, Building, 8th ed., Chapter 1 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
  19. 19.Florida Statutes, section 489.113 (2026). Read Oct 5, 2026.
  20. 20.Florida Statutes, section 553.837 (2026). Read Oct 5, 2026.
  21. 21.2023 Florida Building Code, Building, 8th ed., Chapter 15 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
  22. 22.Miami-Dade County Regulatory and Economic Resources (RER) - Building & Permits, Miami. Read Oct 5, 2026.
  23. 23.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25034, via Census Reporter API, U.S. Census Bureau (via Census Reporter). Read Oct 5, 2026.
  24. 24.Florida Statutes, section 713.135 (2026), Florida Legislature. Read Oct 5, 2026.
  25. 25.Florida Statutes, section 627.7011 (2026), Florida Legislature. Read Oct 4, 2026.
  26. 26.NOAA National Hurricane Center, Tropical Cyclone Report: Hurricane Irma (AL112017), NOAA National Hurricane Center. Read Oct 5, 2026.
  27. 27.NOAA National Hurricane Center, Tropical Cyclone Report: Hurricane Dorian (AL052019), NOAA National Hurricane Center. Read Oct 5, 2026.
  28. 28.NOAA National Hurricane Center, Tropical Cyclone Climatology, NOAA National Hurricane Center. Read Oct 5, 2026.
  29. 29.NOAA NCEI U.S. Climate Normals 1991-2020 (access data service), NOAA National Centers for Environmental Information. Read Oct 5, 2026.
  30. 30.NOAA Atlas 14 Volume 9 version 2, partial-duration 24-hour depth estimates at the Kendall West 2020 Census internal point (25.7068, -80.4379), NOAA Hydrometeorological Design Studies Center. Read Oct 5, 2026.
  31. 31.U.S. Census Bureau, 2020 Census counts (POP100, HU100) via TIGERweb tigerWMS_Census2020 layer 28 (Census Designated Places), U.S. Census Bureau. Read Oct 5, 2026.

South Fork Roofing

New construction roofing in Kendall West

Answer a few questions about the job, or call.

CallFree estimate