Roofing in Gladeview, Florida

The typical Gladeview home was built in 1974, close to the Miami-Dade County median of 1980. That age matters for your roof. Many of these homes are likely on a second or third roof, and Florida insurer rules and the county's High Velocity Hurricane Zone code both affect what you do next.

Updated October 2026

View from a roof ridge over dark gray architectural shingles toward the street, with two workers beside a black pickup and a gray roll-off container at the curb.

At a glance

Gladeview homes at a glance

People (2020 Census)
14,927
Median year homes were built
1974
Share of homes built before 1980
55.6%
Share of homes built 2010 or later
21.8%
Owner-occupied share of occupied homes
34.7%

Census figures; each one is listed in the sources at the end of this page.

Housing age

How old are Gladeview homes and roofs?

Census figures put 55.6 percent of Gladeview homes as built before 1980. At the same time, 21.8 percent were built in 2010 or later, against 11.4 percent countywide. That is nearly double the county's share of newer construction, so one street can hold roofs of very different ages.

Only 49.8 percent of units here are single-family detached homes, and 20.3 percent sit in buildings of 10 or more units. Another 8 percent are mobile homes.

Only 34.7 percent of occupied homes are owner-occupied, compared with 52.2 percent in Miami-Dade County. If you rent from a landlord, ask who holds the roof permit and who decides on repairs.

Insurance rules

What insurers require when a roof is 15 years or older

Under Florida Statute 627.7011(5), an insurer may not refuse or renew a policy solely because a roof is under 15 years old. Once your roof reaches 15 years of age, hiring an authorized inspector to evaluate it on your own is an option. If the inspection shows 5 or more years of useful life left, the insurer may not drop you for age alone.

With 10.8 percent of Gladeview residents 65 or older, many homeowners will face this question at renewal. Your insurer or agent can tell you what your own policy demands. What a policy covers is not something we can tell you.

  • 21.8% of housing units were built in 2010 or later (Miami-Dade County: 11.4%), a newer-construction area.

Permits

Who issues roof permits in Gladeview?

Gladeview is a census-designated place, not a city, so Miami-Dade County Regulatory and Economic Resources issues the permits. Confirm the requirements for your own roof with that county office before any work begins.

The county is one of two in the High Velocity Hurricane Zone. Roofing products here need a Miami-Dade Notice of Acceptance, and the notice is not valid after its expiration date. A Gladeview roof permit filed after December 31, 2026 must follow the Ninth Edition of the Florida Building Code.

The 25 percent rule says that more than 25 percent of a roof section repaired in 12 months means replacing the whole section. The exception covers only a roof built or replaced under the 2007 code or later. Permits also lapse if work does not start within 6 months.

Building permits

Miami-Dade County Regulatory and Economic Resources (RER) - Building & Permits

Official building page

Office names and links only. Fees, forms and timing change; check the official page.

Local weather

Storms and rain your Gladeview roof faces

Roughly 1,000 Miami-Dade homes suffered major damage when Hurricane Irma struck in 2017. Activity peaks near September 10 within a hurricane season that spans June 1 to November 30.

Rain is heavy too. May through October brings 76.6 percent of normal annual rain at Miami International Airport. NOAA estimates for Gladeview put a 100-year, 1-hour rain at 5.26 inches, so flashing and drainage matter.

Questions

Gladeview roofing questions

What is the 15 year roof rule in Florida?

Under Florida Statute 627.7011(5), an insurer cannot refuse or non-renew a homeowner's policy solely on the grounds that the roof is under 15 years old. Once a roof is 15 years or older, you can pay an authorized inspector to check its condition. A finding of 5 or more years of useful life left means the insurer cannot drop you for age alone. This matters for older neighborhoods, since the median year homes were built here is 1974, which means many roofs have been replaced at least once and some are now nearing that 15 year mark. Your insurer or agent can explain how this applies in your case.

Source: Florida Statutes, section 627.7011 (2026), read Oct 4, 2026

Related: Roof replacement

Who issues a roof permit in Gladeview?

Gladeview is an unincorporated census-designated place, so roof permits come from Miami-Dade County Regulatory and Economic Resources. Before you begin, confirm the current steps with the county building office. A permit becomes invalid if work does not start within 6 months of issuance, and it can also lapse if work is suspended for 6 months.

Source: Miami-Dade County Regulatory and Economic Resources (RER) - Building & Permits, read Oct 5, 2026

Related: Roof replacement

What is the 25 percent roof rule in Miami-Dade?

If a repair or replacement touches more than 25 percent of a roof section within any 12-month period, the whole section has to be replaced or recovered. The exception applies only to a roof that was itself built, repaired or replaced to the 2007 Florida Building Code or later. Miami-Dade sits in the High Velocity Hurricane Zone, and HVHZ section 1521.4 carries the same wording.

Source: 2023 Florida Building Code, Building, 8th ed., Chapter 15 (UpCodes viewer, unofficial transcription), read Oct 5, 2026

Related: Roof replacement

Does the new Florida code change my roof permit?

A permit application or plan submitted on or after December 31, 2026 must comply with the Ninth (2026) Edition of the Florida Building Code. Anything filed earlier falls under the 2023 edition that took effect December 31, 2023. Miami-Dade County Regulatory and Economic Resources can tell you which edition applies to your filing date.

Source: FRSA, "New 2023 FBC Eighth Edition is Now in Effect", 2024-02-13, read Oct 5, 2026

Related: Roof replacement

How much of Gladeview rain falls in hurricane season months?

At Miami International Airport, 76.6 percent of normal annual rain, 51.64 of 67.41 inches, falls May through October. For Gladeview, NOAA estimates 8.48 inches in 24 hours in a 10-year storm, so a roof should be checked before the rainy season starts. The county's wettest month is June, with a 1991-2020 normal of 10.51 inches at the airport.

Source: NOAA NCEI U.S. Climate Normals 1991-2020 (access data service), read Oct 5, 2026

Related: Roof repair

Sources for this page(29)
  1. 1.Share of homes built before 1980: 55.6%. U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25034, via Census Reporter API. Read Oct 5, 2026.
  2. 2.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25034, via Census Reporter API. Read Oct 5, 2026.
  3. 3.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25035, B25034, B25024, via Census Reporter API. Read Oct 5, 2026.
  4. 4.Share of homes built 2010 or later: 21.8%. U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25034, via Census Reporter API. Read Oct 5, 2026.
  5. 5.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25035, via Census Reporter API. Read Oct 5, 2026.
  6. 6.Single-family detached share of housing units: 49.8%. U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25024, via Census Reporter API. Read Oct 5, 2026.
  7. 7.Share of homes in buildings with 10+ units: 20.3%. U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25024, via Census Reporter API. Read Oct 5, 2026.
  8. 8.Mobile homes, share of housing units: 8%. U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25024, via Census Reporter API. Read Oct 5, 2026.
  9. 9.Owner-occupied share of occupied homes: 34.7% (1,772 of 5,104). U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25003, via Census Reporter API. Read Oct 5, 2026.
  10. 10.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25003, via Census Reporter API. Read Oct 5, 2026.
  11. 11.Residents 65 and older: 10.8%. U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B01001, via Census Reporter API. Read Oct 5, 2026.
  12. 12.Permit office: Miami-Dade County Regulatory and Economic Resources (RER) - Building & Permits. Miami-Dade County Regulatory and Economic Resources (RER) - Building & Permits. Read Oct 10, 2026.
  13. 13.Florida Building Commission, 'Setting New Standards for Safety: The Florida Building Code' (2004 publication; wind-speed figures in it are outdated and not used). Read Oct 5, 2026.
  14. 14.Hurricane Irma (2017). NOAA National Hurricane Center, Tropical Cyclone Report: Hurricane Irma (AL112017). Read Oct 5, 2026.
  15. 15.NOAA National Hurricane Center, Tropical Cyclone Climatology. Read Oct 5, 2026.
  16. 16.NOAA NCEI U.S. Climate Normals 1991-2020 (access data service). Read Oct 5, 2026.
  17. 17.Median year homes were built: 1974. U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25035, via Census Reporter API. Read Oct 5, 2026.
  18. 18.NOAA NCEI U.S. Climate Normals 1991-2020 (access data service). Read Oct 5, 2026.
  19. 19.People (2020 Census): 14,927. U.S. Census Bureau, 2020 Census counts (POP100, HU100) via TIGERweb tigerWMS_Census2020 layer 28 (Census Designated Places). Read Oct 5, 2026.
  20. 20.2023 Florida Building Code, Building, 8th ed., Chapter 1 (UpCodes viewer, unofficial transcription), UpCodes (Florida Building Code transcription). Read Oct 5, 2026.
  21. 21.Florida Statutes, section 627.7011 (2026), Florida Legislature. Read Oct 4, 2026.
  22. 22.Miami-Dade County Regulatory and Economic Resources (RER) - Building & Permits, Miami. Read Oct 5, 2026.
  23. 23.miamidade.gov, miamidade.gov. Read Oct 5, 2026.
  24. 24.Miami-Dade County RER notice, Miami. Read Oct 5, 2026.
  25. 25.2023 Florida Building Code, Building, 8th ed., Chapter 15 (UpCodes viewer, unofficial transcription), UpCodes (Florida Building Code transcription). Read Oct 5, 2026.
  26. 26.NOAA National Hurricane Center, Tropical Cyclone Report: Hurricane Irma (AL112017), NOAA National Hurricane Center. Read Oct 5, 2026.
  27. 27.NOAA Atlas 14 Volume 9 version 2, partial-duration intensity estimates at the Gladeview 2020 Census internal point (25.8395, -80.2368), NOAA Hydrometeorological Design Studies Center. Read Oct 5, 2026.
  28. 28.FRSA, "New 2023 FBC Eighth Edition is Now in Effect", 2024-02-13, floridaroof.com. Read Oct 5, 2026.
  29. 29.NOAA Atlas 14 Volume 9 version 2, partial-duration 24-hour depth estimates at the Gladeview 2020 Census internal point (25.8395, -80.2368), NOAA Hydrometeorological Design Studies Center. Read Oct 5, 2026.