Skip to content

Re-roofs · Gladeview

Roof replacement in Gladeview, FL

In Gladeview, 55.6 percent of homes were built before 1980, and the median home dates to 1974. Many roofs here have likely been replaced at least once already, and some may be due for another replacement. A Florida re-roof is not just new shingles or tile. It starts with a permit from the county.

Updated October 2026

Drone view looking down on a gray-blend shingle roof with two front gables, a debris container and a pickup in the driveway beyond.

Gladeview figures this page uses

Median year homes were built
1974
Share of homes built 2010 or later
21.8%
Mobile homes, share of housing units
8%
Owner-occupied share of occupied homes
34.7%

Home age

How an aging housing stock affects your roof

Gladeview homes are close to the Miami-Dade County pattern, where 49.6 percent of units predate 1980. Here the median build year is 1974, against 1980 countywide. Homes that old were built before the strong provisions the High Velocity Hurricane Zone brought to this county, so deck attachment deserves a close look.

About 21.8 percent of Gladeview homes went up in 2010 or later, nearly double the county's 11.4 percent. Those newer roofs sit beside very old ones on the same streets. A roof's age is not the same as the home's age, so check your own roof's last permit.

Only 34.7 percent of occupied homes here are owner-occupied, so many replacements are decided by landlords or property managers. Mobile homes make up 8 percent of units here. They follow the federal HUD code, not the Florida Building Code, so confirm the rules for yours with the county.

Permit and inspections

What a re-roof triggers in Miami-Dade County

No city hall handles Gladeview roofs, because the community is unincorporated. The permit comes from the county's Regulatory and Economic Resources office. In the High Velocity Hurricane Zone, any new roof, recover or repair needs an HVHZ Uniform Roofing Permit Application signed by a licensed contractor. The application also carries the owner's notification form and product approval pages.

Before the new covering goes down, the deck must be fastened to code. The code bars a new system over sheathing that is poorly fastened, water soaked or deteriorated. A full tear-off to the deck is required where the roof has two or more existing coverings, or where the old base cannot hold the new one.

Under the 25% rule, repairing or replacing more than 25 percent of a roof section in 12 months means redoing the whole section. A roof that was itself built, repaired or replaced to the 2007 Florida Building Code or later gets relief. Then only the new portion must meet current code, and the county cannot change that by ordinance.

Questions

Roof replacement in Gladeview: questions

Does a 1974 home in Gladeview need a full tear-off?

Not automatically. The median Gladeview home was built in 1974, but the roof on top may be newer. A tear-off to the deck is required where the roof has two or more coverings, is water soaked, or cannot hold the new securement. The county inspector looks at the deck before the new covering goes on. Ask your contractor to show you the deck condition before closing it in.

Source: U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25035, via Census Reporter API, read Oct 5, 2026

Related: Roof replacement

What is the new law in Florida about roofs?

A new edition of the Florida Building Code, the Ninth (2026) Edition, becomes effective December 31, 2026. Permit applications submitted on or after that date must follow it, while earlier filings stay under the Eighth Edition, which took effect December 31, 2023. If your Gladeview permit is filed before the change, the earlier edition governs. Confirm the filing date and edition with Miami-Dade County Regulatory and Economic Resources.

Source: Miami-Dade County Regulatory and Economic Resources (RER) - Building & Permits, read Oct 5, 2026

Related: Roof replacement

Can my insurer force me to replace a roof that is 15 years old?

Florida law gives you a choice. If your roof is 15 years or older, your insurer must allow an authorized inspector, at your expense, to examine it before the insurer can demand a replacement. When the inspection shows 5 or more years of useful life remaining, a roof's age by itself does not justify refusing or non-renewing your coverage. Only 34.7 percent of Gladeview occupied homes are owner-occupied, so renters should ask the owner. For what your own policy says, ask your insurer or agent, who can walk you through it.

Source: U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25003, via Census Reporter API, read Oct 5, 2026

Related: Roof replacement

How long is a Miami-Dade roof permit good for?

A Miami-Dade roof permit is no longer valid if work does not begin within 6 months of issuance, or if it is suspended or abandoned for 6 months. A permit that has received an approved inspection within the past 180 days shows the work is in active progress. In Gladeview, 55.6 percent of homes were built before 1980, so many roofs here are older and a permit can sit through delays like material orders or hidden decking repairs. The county building office issues and tracks the permit for a Gladeview home, so call them before any long delay.

Source: Miami-Dade County Regulatory and Economic Resources (RER) - Building & Permits, read Oct 5, 2026

Related: Roof replacement

Nearby

Roof replacement near Gladeview

Sources for this page(27)
  1. 1.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25035, via Census Reporter API. Read Oct 5, 2026.
  2. 2.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25035, B25034, B25024, via Census Reporter API. Read Oct 5, 2026.
  3. 3.Florida Building Commission, 'Setting New Standards for Safety: The Florida Building Code' (2004 publication; wind-speed figures in it are outdated and not used). Read Oct 5, 2026.
  4. 4.Median year homes were built: 1974. U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25035, via Census Reporter API. Read Oct 5, 2026.
  5. 5.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25034, via Census Reporter API. Read Oct 5, 2026.
  6. 6.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25003, via Census Reporter API. Read Oct 5, 2026.
  7. 7.Share of homes built 2010 or later: 21.8%. U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25034, via Census Reporter API. Read Oct 5, 2026.
  8. 8.Mobile homes, share of housing units: 8%. U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25024, via Census Reporter API. Read Oct 5, 2026.
  9. 9.Owner-occupied share of occupied homes: 34.7% (1,772 of 5,104). U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25003, via Census Reporter API. Read Oct 5, 2026.
  10. 10.Permit office: Miami-Dade County Regulatory and Economic Resources (RER) - Building & Permits. Miami-Dade County Regulatory and Economic Resources (RER) - Building & Permits. Read Oct 10, 2026.
  11. 11.Share of homes built before 1980: 55.6%. U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25034, via Census Reporter API. Read Oct 5, 2026.
  12. 12.2023 Florida Building Code, Building, 8th ed., Chapter 1 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
  13. 13.2023 Florida Building Code, Building, 8th ed., Chapter 15 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
  14. 14.Fla. Stat. 489.105(3)(e). Read Oct 5, 2026.
  15. 15.Florida Statutes, section 553.844 (2026). Read Oct 5, 2026.
  16. 16.FRSA, "New 2023 FBC Eighth Edition is Now in Effect", 2024-02-13. Read Oct 5, 2026.
  17. 17.Miami-Dade County RER notice. Read Oct 5, 2026.
  18. 18.Florida Statutes, section 627.7011 (2026). Read Oct 5, 2026.
  19. 19.Miami-Dade County Regulatory and Economic Resources (RER) - Building & Permits, Miami. Read Oct 5, 2026.
  20. 20.Florida Statutes, section 713.135 (2026), Florida Legislature. Read Oct 5, 2026.
  21. 21.miamidade.gov, miamidade.gov. Read Oct 5, 2026.
  22. 22.NOAA National Hurricane Center, Tropical Cyclone Report: Hurricane Irma (AL112017), NOAA National Hurricane Center. Read Oct 5, 2026.
  23. 23.NOAA National Hurricane Center, Tropical Cyclone Climatology, NOAA National Hurricane Center. Read Oct 5, 2026.
  24. 24.NOAA NCEI U.S. Climate Normals 1991-2020 (access data service), NOAA National Centers for Environmental Information. Read Oct 5, 2026.
  25. 25.NOAA Atlas 14 Volume 9 version 2, partial-duration intensity estimates at the Gladeview 2020 Census internal point (25.8395, -80.2368), NOAA Hydrometeorological Design Studies Center. Read Oct 5, 2026.
  26. 26.NOAA Atlas 14 Volume 9 version 2, partial-duration 24-hour depth estimates at the Gladeview 2020 Census internal point (25.8395, -80.2368), NOAA Hydrometeorological Design Studies Center. Read Oct 5, 2026.
  27. 27.NOAA NCEI U.S. Climate Normals 1991-2020 (access data service), NOAA National Centers for Environmental Information. Read Oct 5, 2026.

South Fork Roofing

Roof replacement in Gladeview

Answer a few questions about the job, or call.

CallFree estimate