Commercial roofs · Gladeview
Commercial roofing in Gladeview, FL
In Gladeview, 20.3 percent of homes are in buildings with 10 or more units. Most of those buildings have flat or low-slope roofs. Miami-Dade County, not a town office, issues the permits, and the High-Velocity Hurricane Zone rules apply to every one of them.
Updated October 2026

Building stock
Gladeview's multi-unit buildings and who owns them
Gladeview has 5,654 housing units, and only 34.7 percent of occupied homes are owner-occupied, against 52.2 percent countywide. That suggests many of the larger buildings are run by landlords or property managers, who answer for the roof and not the tenants.
The age mix is split. The median home dates to 1974, yet 21.8 percent of units went up in 2010 or later. A 2012 apartment block and a 1970s walk-up need different roof assessments, so do not assume one scope fits a portfolio.
HVHZ code
Miami-Dade rules for flat and low-slope roofs
Gladeview has no town building department of its own, because it is unincorporated. Miami-Dade County Regulatory and Economic Resources handles the paperwork. Inside the High-Velocity Hurricane Zone, every roofing job needs an HVHZ Uniform Roofing Permit Application, signed by a licensed contractor. That includes repair and maintenance.
Products need Miami-Dade approval. The county's Product Control Section reviews roofing systems, and a Notice of Acceptance stops being valid on its printed expiration date. The building official can ask to see the full NOA on site. Get the NOA number and expiry for every system in each proposal.
New low-slope decks need at least 1/4:12 slope in the HVHZ, and loose-laid ballasted systems are not allowed. On a reroof, the contractor must tell you in writing about ponding risk and recommend a structural review if ponding is possible.
Bid checklist
Comparing bids as a property manager
- Permit type: the HVHZ application, filed with Miami-Dade, not a generic form.
- Product approval: NOA numbers and expiration dates for each system named.
- Tear-off or recover: a recover is barred over wet roofing or a roof with two or more existing coverings.
- Drainage: secondary overflow drains or scuppers where the parapet can trap water.
- Inspections: HVHZ work is inspected before the attachment is concealed, and again at final.
Across Miami-Dade, about 1,000 homes took major damage when Hurricane Irma struck in 2017. Roofs there are judged against county wind rules, so a bid that skips the wind-load and edge-metal details is incomplete.
Questions
Commercial roofing in Gladeview: questions
Who permits a commercial roof in Gladeview?
Miami-Dade County Regulatory and Economic Resources, Building & Permits, issues roof permits in Gladeview because it is unincorporated. In the High-Velocity Hurricane Zone, even repair and maintenance need an HVHZ Uniform Roofing Permit Application signed by a licensed contractor. Call the county building office to confirm the current forms before work starts.
Source: Miami-Dade County Regulatory and Economic Resources (RER) - Building & Permits, read Oct 5, 2026
Does the 25 percent roof rule apply to my apartment building?
Yes. Florida's rule says no more than 25 percent of a roof or roof section may be repaired or replaced in 12 months unless the whole roof or section is replaced. The relief applies only when that roof was itself built, repaired or replaced under the 2007 code or later. In Gladeview, 20.3 percent of homes are in 10+ unit buildings.
Source: U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25024, via Census Reporter API, read Oct 5, 2026
Can a new commercial roof go over the old one in Gladeview?
Sometimes, but not always. A recover is barred where the existing roof is water soaked, has two or more coverings, or cannot meet the code's securement rules. Miami-Dade also forbids new roofing over deteriorated or poorly fastened sheathing in the HVHZ. With a median build year of 1974 here, a tear-off inspection often settles it.
Source: U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25035, via Census Reporter API, read Oct 5, 2026
What should a commercial roofing bid list for a Gladeview building?
The bid should name each roofing system with its Miami-Dade Notice of Acceptance number and expiration date. It should also state the HVHZ permit, the tear-off or recover decision, and drainage with overflow provisions. Miami-Dade's Product Control Section approves roofing products, and only 34.7 percent of Gladeview homes are owner-occupied, so managers usually need written scopes to share with owners.
Source: U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25003, via Census Reporter API, read Oct 5, 2026
Sources for this page(25)
- 1.Housing units (ACS 5-year): 5,654. U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25001, via Census Reporter API. Read Oct 5, 2026.
- 2.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25003, via Census Reporter API. Read Oct 5, 2026.
- 3.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25035, B25034, B25024, via Census Reporter API. Read Oct 5, 2026.
- 4.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25035, via Census Reporter API. Read Oct 5, 2026.
- 5.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25034, via Census Reporter API. Read Oct 5, 2026.
- 6.Permit office: Miami-Dade County Regulatory and Economic Resources (RER) - Building & Permits. Miami-Dade County Regulatory and Economic Resources (RER) - Building & Permits. Read Oct 10, 2026.
- 7.Miami-Dade County RER, Board and Code Administration Division, Product Approval. Read Oct 5, 2026.
- 8.Hurricane Irma (2017). NOAA National Hurricane Center, Tropical Cyclone Report: Hurricane Irma (AL112017). Read Oct 5, 2026.
- 9.Share of homes in buildings with 10+ units: 20.3%. U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25024, via Census Reporter API. Read Oct 5, 2026.
- 10.Florida Building Commission, 'Setting New Standards for Safety: The Florida Building Code' (2004 publication; wind-speed figures in it are outdated and not used). Read Oct 5, 2026.
- 11.FBC-Building 2023 Chapter 2 definitions. Read Oct 5, 2026.
- 12.2023 Florida Building Code, Building, 8th ed., Chapter 15 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
- 13.miamidade.gov. Read Oct 5, 2026.
- 14.2023 Florida Building Code, Plumbing, 8th ed., Chapter 11 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
- 15.Miami-Dade County Regulatory and Economic Resources (RER) - Building & Permits, Miami. Read Oct 5, 2026.
- 16.NOAA National Hurricane Center, Tropical Cyclone Report: Hurricane Irma (AL112017), NOAA National Hurricane Center. Read Oct 5, 2026.
- 17.2023 Florida Building Code, Building, 8th ed., Chapter 1 (UpCodes viewer, unofficial transcription), UpCodes (Florida Building Code transcription). Read Oct 5, 2026.
- 18.Florida Statutes, section 627.7011 (2026), Florida Legislature. Read Oct 4, 2026.
- 19.Miami-Dade County RER notice, Miami. Read Oct 5, 2026.
- 20.NOAA National Hurricane Center, Tropical Cyclone Climatology, NOAA National Hurricane Center. Read Oct 5, 2026.
- 21.NOAA NCEI U.S. Climate Normals 1991-2020 (access data service), NOAA National Centers for Environmental Information. Read Oct 5, 2026.
- 22.NOAA Atlas 14 Volume 9 version 2, partial-duration intensity estimates at the Gladeview 2020 Census internal point (25.8395, -80.2368), NOAA Hydrometeorological Design Studies Center. Read Oct 5, 2026.
- 23.FRSA, "New 2023 FBC Eighth Edition is Now in Effect", 2024-02-13, floridaroof.com. Read Oct 5, 2026.
- 24.NOAA Atlas 14 Volume 9 version 2, partial-duration 24-hour depth estimates at the Gladeview 2020 Census internal point (25.8395, -80.2368), NOAA Hydrometeorological Design Studies Center. Read Oct 5, 2026.
- 25.NOAA NCEI U.S. Climate Normals 1991-2020 (access data service), NOAA National Centers for Environmental Information. Read Oct 5, 2026.
South Fork Roofing
Commercial roofing in Gladeview
Answer a few questions about the job, or call.
