Commercial roofs ยท Bayshore Gardens
Commercial roofing in Bayshore Gardens, FL
In Bayshore Gardens, 28.9 percent of homes are in buildings with five or more units, so many roofs here belong to associations and landlords. Manatee County's Building Division issues the permit for unincorporated areas like this one. A property manager's first jobs are confirming that permit and getting bids priced for the same roof system.
Updated October 2026

Building stock
Multi-unit buildings and the district's mid-century homes
Bayshore Gardens was platted after a 1955 land purchase, and by April 1958 it had 400 homes designed by Sidney Wilkinson. The census counts 10,063 housing units today. Since 2014, students and residents have inventoried the mid-century homes for a designation that is still pending.
If your building sits among those mid-century homes, the pending designation could matter to a reroof. No rule we have found says it limits roof work today. Ask the Manatee County Building Division before you set a scope.
Code and permits
Permits, the 25 percent rule and low-slope drainage
Bayshore Gardens is not a city, so the county building office issues the permit. The High-Velocity Hurricane Zone covers only Broward and Miami-Dade, so its stricter reroofing sections do not apply to your building.
The Florida Building Code limits repair, replacement or recovery to 25 percent of the roof area in any 12-month period. Past that, the whole roof or roof section must be replaced or recovered. An exception applies if the existing roof was built or replaced under the 2007 code or later.
New low-slope roofs need a minimum slope of one-fourth unit in 12. Water should leave the roof within 48 hours of rain. Manatee County's normal rainfall is 49.05 inches a year, with about 60 percent falling June through September, so ponding gets tested every summer.
Comparing bids
How to compare roofing bids on a multi-unit building
- Ask each bidder for the roof system and the product approval number, then check it in the Florida Building Commission lookup.
- Confirm the bid names who pulls the permit and records the Notice of Commencement before the first inspection.
- Ask how the bid handles wet or deteriorated decking, since a recover is barred over a roof with two or more existing coverings.
- Check that secondary overflow drains or scuppers are included where the parapet could trap water.
Florida law says a general contractor without a roofing trade registration must subcontract roofing work. Ask each bidder who will actually do the roof work on your building.
Questions
Commercial roofing in Bayshore Gardens: questions
What is the 25% roof rule in Florida?
If you repair, replace or recover more than 25 percent of a roof or roof section within 12 months, the code requires the whole roof or section to be replaced or recovered. An exception applies when the existing roof was built, repaired or replaced under the 2007 Florida Building Code or later. Then only the new work must meet current code. For a Bayshore Gardens building, confirm how the county applies it before you split a job into phases.
Source: 2023 Florida Building Code, Building, 8th ed., Chapter 15 (UpCodes viewer, unofficial transcription), read Oct 5, 2026
Who permits a commercial roof in Bayshore Gardens?
Manatee County Development Services, Building Division, issues roof permits here because Bayshore Gardens is an unincorporated community. Roof permits are not handled by a city office. Before work starts, the permit card requires a recorded Notice of Commencement, posted on site before the first inspection. A permit can lapse if work does not start within six months of issuance.
Source: Manatee County Development Services - Building Division (unincorporated Manatee County), read Oct 5, 2026
Does the High-Velocity Hurricane Zone apply in Bayshore Gardens?
No. The zone consists of Broward and Miami-Dade counties only. Bayshore Gardens sits in Manatee County, so the HVHZ roofing sections do not govern a roof here. The regular Florida Building Code does, including wind-load design for roof coverings and tested edge metal on low-slope roofs. The Eighth Edition took effect December 31, 2023, and the Ninth Edition takes effect December 31, 2026.
Source: FBC-Building 2023 Chapter 2 definitions, read Oct 5, 2026
How flat can a commercial roof be in Florida?
A new low-slope roof needs a minimum slope of one-fourth unit in 12, which is 2 percent, for built-up, modified bitumen, single-ply, sprayed foam and liquid-applied systems. Florida's code defines positive drainage as water leaving the roof within 48 hours of rain. Manatee County gets 49.05 inches of rain in a normal year, so ponding is worth raising with every bidder.
Source: FBC-B 2023 Ch. 15, read Oct 5, 2026
Sources for this page(23)
- 1.Wikipedia, "Bayshore Gardens, Florida" (secondary source). Read Oct 5, 2026.
- 2.Housing units (ACS 5-year): 10,063. U.S. Census Bureau, ACS 2024 5-year (2020-2024), table B25001, via Census Reporter API. Read Oct 5, 2026.
- 3.Permit office: Manatee County Development Services - Building Division (unincorporated Manatee County). Manatee County Development Services - Building Division (unincorporated Manatee County). Read Oct 10, 2026.
- 4.NOAA NCEI U.S. Climate Normals 1991-2020, station USW00012871 SARASOTA BRADENTON AP. Read Oct 5, 2026.
- 5.Share of homes in buildings with 5+ units: 28.9%. U.S. Census Bureau, ACS 2024 5-year (2020-2024), table B25024, via Census Reporter API. Read Oct 5, 2026.
- 6.FBC-Building 2023 Chapter 2 definitions. Read Oct 5, 2026. FBC text read from UpCodes (unofficial transcription): check floridabuilding.org or the ICC viewer before quoting (spec 8.7).
- 7.2023 Florida Building Code, Building, 8th ed., Chapter 15 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026. FBC text read from UpCodes (unofficial transcription): check floridabuilding.org or the ICC viewer before quoting (spec 8.7).
- 8.FBC-B 2023 Ch. 15. Read Oct 5, 2026. FBC text read from UpCodes (unofficial transcription): check floridabuilding.org or the ICC viewer before quoting (spec 8.7). Source URL inherited from C-14 (the research cites it "as C-14").
- 9.Florida Building Commission. Read Oct 5, 2026.
- 10.2023 Florida Building Code, Plumbing, 8th ed., Chapter 11 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026. FBC text read from UpCodes (unofficial transcription): check floridabuilding.org or the ICC viewer before quoting (spec 8.7).
- 11.Florida Statutes, section 489.113 (2026). Read Oct 5, 2026.
- 12.2023 Florida Building Code, Building, 8th ed., Chapter 1 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026. FBC text read from UpCodes (unofficial transcription): check floridabuilding.org or the ICC viewer before quoting (spec 8.7). Source URL inherited from C-3 (the research cites it "as C-3").
- 13.FRSA, "New 2023 FBC Eighth Edition is Now in Effect", 2024-02-13. Read Oct 5, 2026.
- 14.Miami-Dade County RER notice. Read Oct 5, 2026.
- 15.U.S. Census Bureau, ACS 2024 5-year (2020-2024), table B25024, via Census Reporter API, U.S. Census Bureau (via Census Reporter). Read Oct 5, 2026.
- 16.Manatee County Development Services - Building Division (unincorporated Manatee County), Manatee County Development Services. Read Oct 5, 2026.
- 17.Florida Statutes, section 713.135 (2026), Florida Legislature. Read Oct 5, 2026.
- 18.U.S. Census Bureau, ACS 2024 5-year (2020-2024), table B25034, via Census Reporter API, U.S. Census Bureau (via Census Reporter). Read Oct 5, 2026.
- 19.Citizens Property Insurance Corporation, inspections FAQ (updated 2026-03-17), Citizens Property Insurance. Read Oct 4, 2026.
- 20.NOAA Atlas 14 Volume 9 version 2, partial-duration intensity estimates at the Bayshore Gardens 2020 Census internal point (27.4330, -82.5781), NOAA Hydrometeorological Design Studies Center. Read Oct 5, 2026.
- 21.NOAA National Hurricane Center, Tropical Cyclone Report: Hurricane Hermine, NOAA National Hurricane Center. Read Oct 5, 2026.
- 22.NOAA National Hurricane Center, Tropical Cyclone Report: Hurricane Irma, NOAA National Hurricane Center. Read Oct 5, 2026.
- 23.NOAA National Hurricane Center, Tropical Cyclone Report: Hurricane Eta, NOAA National Hurricane Center. Read Oct 5, 2026.
South Fork Roofing
Commercial roofing in Bayshore Gardens
Answer a few questions about the job, or call.