New construction · Cape Canaveral
New construction roofing in Cape Canaveral, FL
Only 3.7 percent of Cape Canaveral homes were built in 2010 or later, against 10.9 percent countywide. New roofs are the exception here, and each one is permitted under the code edition in force when the application is filed. Plan the roof, the permit and the inspections together.
Updated October 2026

Our workDeck and dry-in
Deck, underlayment and nailing on a new roof
Roof sheathing goes on with ring shank nails, 2 1/2 inches long by 0.131 inch, unless the sheathing is 15/32 inch or thinner and a smaller ring shank nail is allowed. Hurricane Matthew sent gusts of 77 mph to Cocoa Beach in 2016, and the damage in Brevard County mostly involved shingles, soffits and awnings.
- A self-adhering polymer-modified bitumen underlayment should be applied over the entire deck.
- Tape every deck joint with a strip at least 3 3/4 inches wide, then lay an approved underlayment over everything.
- Use two layers of felt-type underlayment, nailed 12 inches apart in the field and 6 inches apart at laps.
Tile on a new home goes over solid sheathing and follows the manufacturer's instructions or the FRSA/TRI Florida High Wind tile manual, Seventh Edition. If your eaves extend less than 6 inches, gutters with downspouts are required, and every downspout has to discharge at least 1 foot from the wall.
Build schedule
Scheduling the roof with the build
The inspection sequence is fixed, starting with foundation and framing, then sheathing, exterior wall coverings and soffit, roofing, and finally the final inspection. Sheathing can be inspected as part of a dry-in or separately at the contractor's request. At the roofing stage the inspector looks at the dry-in, the insulation, the coverings and the flashing.
Installing asphalt shingles with its own crew is allowed for a builder only when the building is a new one the builder constructed. Tile, metal and membrane roofing jobs are work for a certified or registered roofing contractor. You get the permit from the City of Cape Canaveral Building Division. Once a permit is issued, it lapses if work has not begun within 6 months.
The Notice of Commencement must be recorded and posted at the job before your first Cape Canaveral inspection. An owner may also hire a private provider for plan review or inspections, but only with written authorization.
Questions
New construction roofing in Cape Canaveral: questions
Sources for this page(32)
- 1.City of West Melbourne, Building Department. Read Oct 5, 2026.
- 2.Brevard County, Building Code Wind Speed Maps. Read Oct 5, 2026.
- 3.Hurricane Matthew (2016). NWS Melbourne, Post Tropical Cyclone Report: Hurricane Matthew (2016). Read Oct 5, 2026.
- 4.Permit office: City of Cape Canaveral Building Division. City of Cape Canaveral Building Division. Read Oct 10, 2026.
- 5.Share of homes built 2010 or later: 3.7%. U.S. Census Bureau, American Community Survey 2020-2024 5-year estimates (acs2024_5yr), via Census Reporter API. Read Oct 5, 2026.
- 6.U.S. Census Bureau, American Community Survey 2020-2024 5-year estimates (acs2024_5yr), via Census Reporter API, table B25034. Read Oct 5, 2026.
- 7.U.S. Census Bureau, American Community Survey 2020-2024 5-year estimates (acs2024_5yr), via Census Reporter API, tables B25034/B25035. Read Oct 5, 2026.
- 8.City of Cape Canaveral, Building + Permits. Read Oct 5, 2026.
- 9.Housing units (ACS 5-year): 9,245. U.S. Census Bureau, American Community Survey 2020-2024 5-year estimates (acs2024_5yr), via Census Reporter API. Read Oct 5, 2026.
- 10.FRSA, "New 2023 FBC Eighth Edition is Now in Effect", 2024-02-13. Read Oct 5, 2026.
- 11.Miami-Dade County RER notice. Read Oct 5, 2026.
- 12.2023 Florida Building Code, Residential, 8th ed., Chapter 9 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
- 13.Florida Statutes, section 553.842 (2026). Read Oct 5, 2026.
- 14.Florida Building Commission. Read Oct 5, 2026.
- 15.2023 Florida Building Code, Residential, 8th ed., Chapter 8 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
- 16.2023 Florida Building Code, Residential, 8th ed., Chapter 3 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
- 17.2023 Florida Building Code, Building, 8th ed., Chapter 1 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
- 18.Florida Statutes, section 489.113 (2026). Read Oct 5, 2026.
- 19.Florida Statutes, section 553.791 (2026). Read Oct 5, 2026.
- 20.Florida Statutes, section 553.837 (2026). Read Oct 5, 2026.
- 21.NWS Melbourne, Post Tropical Cyclone Report: Hurricane Matthew (2016), National Weather Service. Read Oct 5, 2026.
- 22.City of Cape Canaveral Building Division, City of Cape Canaveral Building Division. Read Oct 5, 2026.
- 23.Florida Statutes, section 713.135 (2026), Florida Legislature. Read Oct 5, 2026.
- 24.U.S. Census Bureau, American Community Survey 2020-2024 5-year estimates (acs2024_5yr), via Census Reporter API, U.S. Census Bureau (via Census Reporter). Read Oct 5, 2026.
- 25.U.S. Census Bureau, American Community Survey 2020-2024 5-year estimates (acs2024_5yr), via Census Reporter API, table B25024, U.S. Census Bureau (via Census Reporter). Read Oct 5, 2026.
- 26.2023 Florida Building Code, Building, 8th ed., Chapter 15 (UpCodes viewer, unofficial transcription), UpCodes (Florida Building Code transcription). Read Oct 5, 2026.
- 27.Florida Statutes, section 627.7011 (2026), Florida Legislature. Read Oct 4, 2026.
- 28.NWS Melbourne, Post Tropical Cyclone Report: Hurricane Irma (2017), National Weather Service. Read Oct 5, 2026.
- 29.U.S. Census Bureau, 2020 Census (TIGERweb tigerWMS_Census2020 MapServer: POP100, HU100, AREALAND, AREAWATER), U.S. Census Bureau. Read Oct 5, 2026.
- 30.NOAA Atlas 14 Volume 9 version 2, partial-duration intensity estimates at the Cape Canaveral 2020 Census internal point (28.3932, -80.6048), NOAA Hydrometeorological Design Studies Center. Read Oct 5, 2026.
- 31.NOAA NCEI, U.S. Climate Normals 1991-2020 (annual/seasonal), access-data API, NOAA National Centers for Environmental Information. Read Oct 5, 2026.
- 32.NOAA Atlas 14 Volume 9 version 2, partial-duration 24-hour depth estimates at the Cape Canaveral 2020 Census internal point (28.3932, -80.6048), NOAA Hydrometeorological Design Studies Center. Read Oct 5, 2026.