Skip to content

New construction · Merritt Island

New construction roofing in Merritt Island, FL

Only 3.6 percent of Merritt Island homes were built in 2010 or later, so new construction here is rare next to the older housing around it. If you are building, the roof is permitted through Brevard County and inspected in a set order. The date you file decides which code edition you fall under.

Updated October 2026

Orange sunrise sitting low over a dark tree line reflected in calm lagoon water.
A roof deck sheathed in red-brown ZIP System panels with black seam tape, a bucket and a ladder on the deck, homes and a street behind.Our work
Photo: Sunrise seen over Merritt Island, Florida by Michael Seeley, CC BY 2.0, cropped

Permits and code

Which code edition and permit office apply

Merritt Island is an unincorporated census-designated place, so Brevard County Planning & Development issues the roof permit. For permitting, Brevard also provides wind speed maps by risk category that you can look up by address. Look up your lot there before the roof design is final.

An Eighth Edition code book has governed Florida permits since the last day of 2023. Any permit application or plan set submitted on or after December 31, 2026 falls under the Ninth Edition. A Merritt Island filing just before or after that line changes which book your roof is built to.

Under Fla. Stat. 553.842(5), roofing is one of the product approval categories required across the whole state. The shingle, tile or metal panel you specify needs a Florida product approval number, and you can search for it by manufacturer on the Florida Building Commission lookup.

Roof assembly

What goes on with a new roof: the deck, the underlayment and the drip edge

Roof sheathing on a new home is fastened with ring shank nails, 2 1/2 by 0.131 inch for the standard RSRS-03 nail. Your inspector checks the nail type and spacing before anything covers the deck.

Dry-in for shingle or metal gives you three options. You can cover the whole deck with self-adhering membrane, tape every deck joint with a 3 3/4 inch strip and then underlay the roof, or lay two layers of felt-type underlayment. The two-layer felt option is nailed 12 inches on center in the field and 6 inches at laps.

At eaves and gables, the drip edge sits on top of the underlayment and is fastened every 12 inches on center. Where the design wind speed is 110 mph or more, or the roof is over 33 feet tall, the spacing tightens to 4 inches. Merritt Island recorded an 81 mph gust in Matthew, which shows why fastening details matter here.

Build sequence

Scheduling the roof around the inspections

Inspections run in a set sequence under the code: foundation, framing, sheathing, exterior walls and soffit, roofing, and last the final. You can often use the sheathing inspection as the dry-in check as well. The roofing inspection covers dry-in, insulation, coverings and flashing, so the roofer should not close up flashing before it.

Installing asphalt shingles yourself as a builder is allowed only when the building is a new one you built. Tile, metal and membrane roofs go to a certified or registered roofing contractor, and a general contractor may not advertise as a roofer without that license.

Permit clocks run on every job. Your permit expires if work has not begun within 6 months of issue, or if it halts for 6 months. Record the Notice of Commencement and post it before your first inspection.

Questions

New construction roofing in Merritt Island: questions

How new are homes on Merritt Island?

Most are old. The median year built is 1973, against 1988 countywide, and 59.0 percent of homes were built before 1980. Only 3.6 percent date from 2010 or later. A new build here is unusual, and it will likely sit among much older roofs and neighbors.

Source: U.S. Census Bureau, American Community Survey 2020-2024 5-year estimates (acs2024_5yr), via Census Reporter API, table B25034, read Oct 5, 2026

Related: New construction roofing

Who permits a new roof on Merritt Island?

Brevard County Planning & Development issues the permit, because Merritt Island is an unincorporated census-designated place. Brevard also publishes address-level wind speed maps by risk category. Confirm current submittal steps with the county building office before you schedule roofing work.

Source: Brevard County Planning & Development, Building Permits, read Oct 5, 2026

Related: New construction roofing

Does a new home roof get a builder coverage period?

Under Fla. Stat. 553.837, a builder must cover a newly built home for 1 year against defects in equipment, material or workmanship that cause a material Florida Building Code violation. The warranty leaves out ordinary wear and tear, settling, damage the owner caused and natural disasters. For context, the median home in our area was built in 1973, so many local roofs are far older than any builder coverage period and a brand new home is the exception. Read your contract and ask the builder for the terms in writing.

Source: Florida Statutes, section 553.837 (2026), read Oct 5, 2026

Related: New construction roofing

Can a general contractor roof my new house?

Only in one case. On a new building it built itself, a general, building or residential contractor can put on asphalt or fiberglass shingles directly. For tile, metal and membrane roofs, you need to hire a certified or registered roofing contractor. Ask to see the roofer's state license before work starts. Keep in mind that the median home in the area was built in 1973, so many local buyers are comparing a new roof on a fresh build against older neighbors, and the licensing rules above apply the same way either way.

Source: Florida Statutes, section 489.113 (2026), read Oct 5, 2026

Related: New construction roofing

Nearby

New construction roofing near Merritt Island

Sources for this page(32)
  1. 1.Permit office: Brevard County Planning & Development, Building Permits. Brevard County Planning & Development, Building Permits. Read Oct 10, 2026.
  2. 2.Brevard County, Building Code Wind Speed Maps. Read Oct 5, 2026.
  3. 3.NWS Melbourne, Post Tropical Cyclone Report: Hurricane Matthew (2016). Read Oct 5, 2026.
  4. 4.NOAA National Hurricane Center, Tropical Cyclone Report: Hurricane Irma (AL112017). Read Oct 5, 2026.
  5. 5.Hurricane Matthew (2016). NWS Melbourne, Post Tropical Cyclone Report: Hurricane Matthew (2016). Read Oct 5, 2026.
  6. 6.City of West Melbourne, Building Department. Read Oct 5, 2026.
  7. 7.Share of homes built 2010 or later: 3.6%. U.S. Census Bureau, American Community Survey 2020-2024 5-year estimates (acs2024_5yr), via Census Reporter API. Read Oct 5, 2026.
  8. 8.U.S. Census Bureau, American Community Survey 2020-2024 5-year estimates (acs2024_5yr), via Census Reporter API, tables B25034/B25035. Read Oct 5, 2026.
  9. 9.Median year homes were built: 1973. U.S. Census Bureau, American Community Survey 2020-2024 5-year estimates (acs2024_5yr), via Census Reporter API. Read Oct 5, 2026.
  10. 10.U.S. Census Bureau, American Community Survey 2020-2024 5-year estimates (acs2024_5yr), via Census Reporter API, table B25035. Read Oct 5, 2026.
  11. 11.U.S. Census Bureau, American Community Survey 2020-2024 5-year estimates (acs2024_5yr), via Census Reporter API, table B25034. Read Oct 5, 2026.
  12. 12.FRSA, "New 2023 FBC Eighth Edition is Now in Effect", 2024-02-13. Read Oct 5, 2026.
  13. 13.Miami-Dade County RER notice. Read Oct 5, 2026.
  14. 14.Florida Statutes, section 553.842 (2026). Read Oct 5, 2026.
  15. 15.Florida Building Commission. Read Oct 5, 2026.
  16. 16.2023 Florida Building Code, Residential, 8th ed., Chapter 8 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
  17. 17.2023 Florida Building Code, Residential, 8th ed., Chapter 9 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
  18. 18.2023 Florida Building Code, Building, 8th ed., Chapter 1 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
  19. 19.Florida Statutes, section 489.113 (2026). Read Oct 5, 2026.
  20. 20.Florida Statutes, section 553.837 (2026). Read Oct 5, 2026.
  21. 21.Brevard County Planning & Development, Building Permits, Brevard County Planning & Development. Read Oct 5, 2026.
  22. 22.Florida Statutes, section 713.135 (2026), Florida Legislature. Read Oct 5, 2026.
  23. 23.U.S. Census Bureau, American Community Survey 2020-2024 5-year estimates (acs2024_5yr), via Census Reporter API, U.S. Census Bureau (via Census Reporter). Read Oct 5, 2026.
  24. 24.U.S. Census Bureau, American Community Survey 2020-2024 5-year estimates (acs2024_5yr), via Census Reporter API, table B25024, U.S. Census Bureau (via Census Reporter). Read Oct 5, 2026.
  25. 25.2023 Florida Building Code, Building, 8th ed., Chapter 15 (UpCodes viewer, unofficial transcription), UpCodes (Florida Building Code transcription). Read Oct 5, 2026.
  26. 26.NOAA NCEI, U.S. Climate Normals 1991-2020 (annual/seasonal), access-data API, NOAA National Centers for Environmental Information. Read Oct 5, 2026.
  27. 27.Florida Statutes, section 627.7011 (2026), Florida Legislature. Read Oct 4, 2026.
  28. 28.NWS Melbourne, Post Tropical Cyclone Report: Hurricane Irma (2017), National Weather Service. Read Oct 5, 2026.
  29. 29.U.S. Census Bureau, 2020 Census (TIGERweb tigerWMS_Census2020 MapServer: POP100, HU100, AREALAND, AREAWATER), U.S. Census Bureau. Read Oct 5, 2026.
  30. 30.U.S. Census Bureau, 2020 Census (TIGERweb tigerWMS_Census2020 MapServer: POP100, HU100, AREALAND, AREAWATER), U.S. Census Bureau. Read Oct 5, 2026.
  31. 31.NOAA Atlas 14 Volume 9 version 2, partial-duration intensity estimates at the Merritt Island 2020 Census internal point (28.3092, -80.6760), NOAA Hydrometeorological Design Studies Center. Read Oct 5, 2026.
  32. 32.NOAA Atlas 14 Volume 9 version 2, partial-duration 24-hour depth estimates at the Merritt Island 2020 Census internal point (28.3092, -80.6760), NOAA Hydrometeorological Design Studies Center. Read Oct 5, 2026.

South Fork Roofing

New construction roofing in Merritt Island

Answer a few questions about the job, or call.

CallFree estimate