Re-roofs · Madeira Beach
Roof replacement in Madeira Beach, FL
The median home in Madeira Beach was built in 1974, and 61.2 percent were built before 1980. Many original roofs here have likely been replaced at least once, so the question is what a new one must meet. The city's Building Department issues the permit.
Updated October 2026

Our workMadeira Beach figures this page uses
- Median year homes were built
- 1974
- Share of homes built before 2000
- 83.1%
- Share of homes built before 1980
- 61.2%
- Share of homes built 2010 or later
- 4.9%
Housing age
What a 1974 median build year says about your roof
A home from 1974 predates the Florida Building Code, whose first edition dates to March 1, 2002. By our arithmetic, 83.1 percent built before 2000 minus 61.2 percent built before 1980 leaves 21.9 percent from the 1980s and 1990s. Only 4.9 percent date from 2010 or later.
Many beach condos and hotels here went up in the 1970s and 1980s. That suggests a lot of roofs in Madeira Beach have been redone since, but a median build year says nothing about any one roof. Look at your own roof's permit history and the date of its last replacement.
Permit and inspections
Permit, inspections and deck work on a Madeira Beach re-roof
In Madeira Beach, the City of Madeira Beach Building Department is the office that issues roof permits. Pinellas County Building Services covers other towns, not this city. Confirm current forms and fees with the city building office before you sign a contract.
Record the Notice of Commencement before the first inspection, because the code warns owners that skipping it may mean paying twice. A permit lapses if you let 6 months pass after it is issued without starting the work, and it lapses again if the job sits stopped for 6 months.
Required roof-deck attachments and the replacement of any wood sheathing found rotten during the job fall within a roofing contractor's scope. Expect the deck nailing and the secondary water barrier to be checked at inspection. Ask the city which inspections it schedules and when.
25 percent rule
The 25 percent rule for older Madeira Beach roofs
Section 1511.1.1 of the building code sets a 12-month limit of 25 percent on work to one roof section. Go past it and the full section must be redone. With 61.2 percent of Madeira Beach homes built before 1980, a patch that crosses that line can turn into a full re-roof.
The exception depends on the roof's own history, not the house's. A roof last replaced under the 2007 code or any later edition needs only the new portion to meet current code. A local government cannot amend that exception by ordinance, so keep the permit paperwork from your last re-roof.
Permits submitted on or after December 31, 2026 fall under the Ninth (2026) Edition of the code. If you are planning a replacement near that date, ask the building office which edition will govern your application.
Questions
Roof replacement in Madeira Beach: questions
Does a 1974 median build year mean my roof is that old?
No. The median build year of 1974 describes homes in Madeira Beach, not roofs. Many owners have replaced their roofs since, and 61.2 percent of homes here were built before 1980. Check your permit history at the City of Madeira Beach Building Department, or look through your own records, to learn when your roof was last replaced and under which code edition.
Source: U.S. Census Bureau, ACS 2024 5-year (2020-2024), table B25034, via Census Reporter API, read Oct 5, 2026
Who issues a roof permit in Madeira Beach?
The City of Madeira Beach Building Department. Pinellas County Building Services handles unincorporated areas and some other towns, and Redington Shores runs Redington Beach's building department, so neighboring addresses may use a different office. Confirm your requirements with the Madeira Beach office.
Source: City of Madeira Beach - Building Department, read Oct 5, 2026
What is the 25 percent roof rule in Florida?
Under Florida Building Code section 1511.1.1, a roof section can have no more than 25 percent repaired, replaced or recovered in any 12-month period, unless the whole section is replaced or recovered. A roof qualifies for the exception only if it was built, repaired or replaced to meet the 2007 Florida Building Code or a later edition, and that 2007 code took effect March 1, 2009. With a median home year of 1974 in Madeira Beach, many roofs will need a records check to see if they qualify.
Source: 2023 Florida Building Code, Building, 8th ed., Chapter 15 (UpCodes viewer, unofficial transcription), read Oct 5, 2026
Can my insurer make me replace a roof over 15 years old?
Not on age alone. Florida Statute 627.7011(5)(c) gives you the right to an authorized inspector's check at your own expense once the roof reaches 15 years. A result showing 5 or more years of useful life left protects you from refusal or non-renewal based only on age. In Madeira Beach, where 61.2 percent of homes predate 1980, ask your insurer or agent how this applies to your policy.
Source: Florida Statutes, section 627.7011 (2026), read Oct 5, 2026
Nearby
Roof replacement near Madeira Beach
Sources for this page(28)
- 1.Median year homes were built: 1974. U.S. Census Bureau, ACS 2024 5-year (2020-2024), table B25035, via Census Reporter API. Read Oct 5, 2026.
- 2.Share of homes built before 2000: 83.1%. U.S. Census Bureau, ACS 2024 5-year (2020-2024), table B25034, via Census Reporter API. Read Oct 5, 2026.
- 3.Share of homes built before 1980: 61.2%. U.S. Census Bureau, ACS 2024 5-year (2020-2024), table B25034, via Census Reporter API. Read Oct 5, 2026.
- 4.Share of homes built 2010 or later: 4.9%. U.S. Census Bureau, ACS 2024 5-year (2020-2024), table B25034, via Census Reporter API. Read Oct 5, 2026.
- 5.Wikipedia, "Madeira Beach, Florida" (secondary source). Read Oct 5, 2026.
- 6.U.S. Census Bureau ACS 2020-2024 5-year, tables B25035 and B25034. Read Oct 5, 2026.
- 7.NOAA National Hurricane Center, Tropical Cyclone Report: Hurricane Helene. Read Oct 5, 2026.
- 8.Permit office: City of Madeira Beach - Building Department. City of Madeira Beach - Building Department. Read Oct 10, 2026.
- 9.Pinellas County, "Building Departments in Pinellas County" (official). Read Oct 5, 2026.
- 10.Hurricane Hermine (2016). NOAA National Hurricane Center, Tropical Cyclone Report: Hurricane Hermine. Read Oct 5, 2026.
- 11.City of St. Pete Beach; Town of Redington Shores; City of Largo (official). Read Oct 5, 2026.
- 12.2023 Florida Building Code, Building, 8th ed., Chapter 1 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
- 13.Fla. Stat. 489.105(3)(e). Read Oct 5, 2026.
- 14.2023 Florida Building Code, Building, 8th ed., Chapter 15 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
- 15.Florida Statutes, section 553.844 (2026). Read Oct 5, 2026.
- 16.Miami-Dade County RER notice. Read Oct 5, 2026.
- 17.Florida Statutes, section 627.7011 (2026). Read Oct 5, 2026.
- 18.U.S. Census Bureau, ACS 2024 5-year (2020-2024), table B25034, via Census Reporter API, U.S. Census Bureau (via Census Reporter). Read Oct 5, 2026.
- 19.City of Madeira Beach - Building Department, City of Madeira Beach. Read Oct 5, 2026.
- 20.NOAA National Hurricane Center, Tropical Cyclone Report: Hurricane Hermine, NOAA National Hurricane Center. Read Oct 5, 2026.
- 21.Florida Statutes, section 713.135 (2026), Florida Legislature. Read Oct 5, 2026.
- 22.U.S. Census Bureau, Census 2020 place geography (AREALAND/AREAWATER) via TIGERweb tigerWMS_Census2020, U.S. Census Bureau. Read Oct 5, 2026.
- 23.NOAA National Hurricane Center, Tropical Cyclone Report: Hurricane Eta, NOAA National Hurricane Center. Read Oct 5, 2026.
- 24.NOAA NCEI U.S. Climate Normals 1991-2020, stations USC00087886 ST PETERSBURG and USW00012873 ST PETERSBURG INTL AP, NOAA National Centers for Environmental Information. Read Oct 5, 2026.
- 25.NOAA National Hurricane Center, Tropical Cyclone Report: Hurricane Irma, NOAA National Hurricane Center. Read Oct 5, 2026.
- 26.City of St. Petersburg; City of Tarpon Springs (official); Wikipedia (St. Pete Beach), City of St. Petersburg. Read Oct 5, 2026.
- 27.NOAA Atlas 14 Volume 9 version 2, partial-duration intensity estimates at the Madeira Beach 2020 Census internal point (27.7956, -82.7916), NOAA Hydrometeorological Design Studies Center. Read Oct 5, 2026.
- 28.FRSA, "New 2023 FBC Eighth Edition is Now in Effect", 2024-02-13, floridaroof.com. Read Oct 5, 2026.
South Fork Roofing
Roof replacement in Madeira Beach
Answer a few questions about the job, or call.
