New construction roofing in Mangonia Park, FL

In Mangonia Park, 16.2 percent of homes were built in 2010 or later, so newer roofs sit beside a median build year of 1981. A new roof here is permitted through the Town building office and follows the 2023 Florida Building Code until the Ninth Edition starts on December 31, 2026.

Updated October 2026

Empty commuter rail platform under a green-roofed canopy with a suitcase and bench.
A roof deck sheathed in red-brown ZIP System panels with black seam tape, a bucket and a ladder on the deck, homes and a street behind.Our work
Photo: Mangonia Park Station by Adam Moss, CC BY-SA 2.0, cropped

Mangonia Park figures this page uses

Housing units (ACS 5-year)
943
Share of homes built 2010 or later
16.2%
Median year homes were built
1981

Code edition

Which code edition your new Mangonia Park permit faces

Mangonia Park has about 943 housing units, and the 16.2 percent built since 2010 is the small newer slice of that stock. The median home year of 1981 matches the county figure closely, so older homes still set the look of the town.

A permit application submitted on or after December 31, 2026 must meet the Ninth Edition. One submitted before that date falls under the Eighth Edition, which took effect December 31, 2023. If your plans are close to that date, ask the Town building office which edition applies to your filing.

The High Velocity Hurricane Zone covers only Miami-Dade and Broward, which leaves Palm Beach County outside its boundaries. Your roof is designed to the standard code, not the HVHZ roofing sections. Product approval still applies: roofing must carry a statewide approval under Fla. Stat. 553.842.

Deck and dry-in

A new roof is built from the deck, the underlayment and the drip edge

Roof sheathing is nailed with ring shank nails, 2 1/2 inches long and 0.131 inch thick, under the residential code. Ring shank nails hold better than smooth ones when wind lifts the deck.

For shingle or metal roofs the code gives three dry-in choices. You can lay self-adhering membrane over the whole deck. You can tape every deck joint with a 3 3/4-inch strip, then cover the roof with approved underlayment. The alternative is two layers of felt-type underlayment, with nails spaced 12 inches apart in the field and 6 inches apart at the laps.

Along the eaves and gables, the drip edge goes down over the top of the underlayment. It is nailed at most 12 inches apart, or 4 inches apart where design wind speed is 110 mph or more or the roof is higher than 33 feet.

Inspections

Where the roof falls in the build schedule, and which inspections it involves

The code sets the inspection sequence as foundation, framing, sheathing, exterior wall coverings, roofing, and finally the final. The roofing inspection takes in the dry-in, the insulation, the coverings and the flashing. Plan the roof crew after the sheathing inspection passes.

On a new building it owns, a builder is allowed to put on asphalt shingles with its own crew. Tile, metal and membrane work must be done by a certified or registered roofing contractor. Only 31.8 percent of occupied Mangonia Park homes are owner-occupied, so many roofs here are decided by landlords and builders. If that is you, ask who holds the roofing license before the contract is signed.

Before the first inspection, the Notice of Commencement needs to be recorded and posted at the site. According to the permit card, leaving that step out may leave you paying for the work a second time.

Questions

New construction roofing in Mangonia Park: questions

Who issues new roof permits in Mangonia Park?

Roof permits go through the Town of Mangonia Park Building, Planning & Zoning office. For a new home, the roof is inspected at the dry-in and roofing stages, then at final. Palm Beach County also runs a Self-Issued Reroof Application for qualifying residential reroofs, but a new build goes through plan review and the inspection sequence instead. Confirm filing steps with the Town building office before you schedule roofers.

Source: Town of Mangonia Park - Building, Planning & Zoning, read Oct 5, 2026

Related: New construction roofing

Does a new home in Mangonia Park get a builder warranty on the roof?

Since July 1, 2025, Fla. Stat. 553.837 requires a builder to cover a newly constructed home for 1 year against defects in equipment, material or workmanship that cause a material Florida Building Code violation. Exclusions include natural disasters, settling, defects the owner caused and ordinary wear and tear. Counting starts at either the title transfer or first occupancy, whichever happens first, and runs for one year. Read your purchase contract for what the builder adds.

Source: U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25034, via Census Reporter API, read Oct 5, 2026

Related: New construction roofing

Do new Mangonia Park roofs need gutters?

Often yes. Residential code R318.5 requires gutters with downspouts on buildings whose eaves project less than 6 inches, except at gable end rakes or on a roof above another roof. Each downspout has to discharge at a distance of at least 1 foot from the sidewall. Homes built since 2010 make up 16.2 percent of Mangonia Park housing, and each of those follows this rule when the eaves are short.

Source: U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25034, via Census Reporter API, read Oct 5, 2026

Related: New construction roofing

Is Palm Beach County in the High Velocity Hurricane Zone?

No. The High Velocity Hurricane Zone covers only Broward and Miami-Dade counties, so Palm Beach County and Mangonia Park use the standard Florida Building Code roofing sections. Roofing products still need a statewide product approval under Fla. Stat. 553.842, and that approval number goes on your permit paperwork.

Source: Florida Building Commission, 'Setting New Standards for Safety: The Florida Building Code' (2004 publication; wind-speed figures in it are outdated and not used), read Oct 5, 2026

Related: New construction roofing

Nearby

New construction roofing near Mangonia Park

Sources for this page(35)
  1. 1.Housing units (ACS 5-year): 943. U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25001, via Census Reporter API. Read Oct 5, 2026.
  2. 2.Share of homes built 2010 or later: 16.2%. U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25034, via Census Reporter API. Read Oct 5, 2026.
  3. 3.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25035, via Census Reporter API. Read Oct 5, 2026.
  4. 4.Median year homes were built: 1981. U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25035, via Census Reporter API. Read Oct 5, 2026.
  5. 5.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25035, B25034, B25024, via Census Reporter API. Read Oct 5, 2026.
  6. 6.Permit office: Town of Mangonia Park - Building, Planning & Zoning. Town of Mangonia Park - Building, Planning & Zoning. Read Oct 10, 2026.
  7. 7.Florida Building Commission, 'Setting New Standards for Safety: The Florida Building Code' (2004 publication; wind-speed figures in it are outdated and not used). Read Oct 5, 2026.
  8. 8.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25003, via Census Reporter API. Read Oct 5, 2026.
  9. 9.Hurricane Matthew (2016). NOAA National Hurricane Center, Tropical Cyclone Report: Hurricane Matthew (AL142016). Read Oct 5, 2026.
  10. 10.Palm Beach County PZB - Building Division, Self-Issued Reroof Applications. Read Oct 5, 2026.
  11. 11.U.S. Census Bureau, Building Permits Survey county annual files (co2025a.txt, co2020a.txt). Read Oct 5, 2026.
  12. 12.FRSA, "New 2023 FBC Eighth Edition is Now in Effect", 2024-02-13. Read Oct 5, 2026.
  13. 13.Miami-Dade County RER notice. Read Oct 5, 2026.
  14. 14.FBC-Building 2023 Chapter 2 definitions. Read Oct 5, 2026.
  15. 15.Florida Statutes, section 553.842 (2026). Read Oct 5, 2026.
  16. 16.2023 Florida Building Code, Residential, 8th ed., Chapter 8 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
  17. 17.2023 Florida Building Code, Residential, 8th ed., Chapter 9 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
  18. 18.2023 Florida Building Code, Building, 8th ed., Chapter 1 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
  19. 19.Florida Statutes, section 489.113 (2026). Read Oct 5, 2026.
  20. 20.Florida Statutes, section 553.837 (2026). Read Oct 5, 2026.
  21. 21.2023 Florida Building Code, Residential, 8th ed., R318.5 (UpCodes viewer, unofficial transcription); FBC-Building 1503.7. Read Oct 5, 2026.
  22. 22.Town of Mangonia Park - Building, Planning & Zoning, tompfl.com. Read Oct 5, 2026.
  23. 23.NOAA National Hurricane Center, Tropical Cyclone Report: Hurricane Matthew (AL142016), NOAA National Hurricane Center. Read Oct 5, 2026.
  24. 24.Florida Statutes, section 713.135 (2026), Florida Legislature. Read Oct 5, 2026.
  25. 25.NOAA National Hurricane Center, Tropical Cyclone Report: Hurricane Dorian (AL052019), NOAA National Hurricane Center. Read Oct 5, 2026.
  26. 26.Florida Statutes, section 627.7011 (2026), Florida Legislature. Read Oct 4, 2026.
  27. 27.2023 Florida Building Code, Building, 8th ed., Chapter 15 (UpCodes viewer, unofficial transcription), UpCodes (Florida Building Code transcription). Read Oct 5, 2026.
  28. 28.NOAA NCEI U.S. Climate Normals 1991-2020 (access data service), NOAA National Centers for Environmental Information. Read Oct 5, 2026.
  29. 29.NOAA NCEI U.S. Climate Normals 1991-2020 (access data service), NOAA National Centers for Environmental Information. Read Oct 5, 2026.
  30. 30.NOAA National Hurricane Center, Tropical Cyclone Climatology, NOAA National Hurricane Center. Read Oct 5, 2026.
  31. 31.NOAA Atlas 14 Volume 9 version 2, partial-duration intensity estimates at the Mangonia Park 2020 Census internal point (26.7586, -80.0761), NOAA Hydrometeorological Design Studies Center. Read Oct 5, 2026.
  32. 32.NOAA Atlas 14 Volume 9 version 2, partial-duration 24-hour depth estimates at the Mangonia Park 2020 Census internal point (26.7586, -80.0761), NOAA Hydrometeorological Design Studies Center. Read Oct 5, 2026.
  33. 33.NOAA National Hurricane Center, Tropical Cyclone Report: Hurricane Irma (AL112017), NOAA National Hurricane Center. Read Oct 5, 2026.
  34. 34.Wikipedia, 'Mangonia Park, Florida' (revision 1378541505), Wikipedia. Read Oct 5, 2026.
  35. 35.Wikipedia, 'List of municipalities in Florida', Wikipedia. Read Oct 5, 2026.

South Fork Roofing

New construction roofing in Mangonia Park

Answer a few questions about the job, or call.

CallFree estimate