Only 3 percent of Glen Ridge homes were built in 2010 or later, so a ground-up roof here is an uncommon job. Palm Beach County sits outside the High Velocity Hurricane Zone. Your permit goes through the Town of Glen Ridge Building Division, under the code edition in force on your filing date.
Updated October 2026

Code edition
Which code edition applies to a new roof in Glen Ridge
A Glen Ridge permit filed today falls under the Eighth Edition, the 2023 code that has been in force since the last day of 2023. The Ninth Edition takes over on December 31, 2026, and it covers every permit application submitted on or after that date. If your plans are filed late in 2026, ask the Town of Glen Ridge Building Division which edition your roof will be reviewed under.
Glen Ridge is a town of about 100 acres with about 100 homes, and 98.0 percent of its housing units are single-family detached. A new home here is almost always a single house on its own lot, so expect residential code sections, not commercial ones.
Product approval is mandatory for roofing statewide. Since Palm Beach County is outside the High Velocity Hurricane Zone, you need a Florida product approval number, not a Miami-Dade Notice of Acceptance. The state lookup lets you search by FL number or manufacturer.
Build details
Deck, underlayment and drip edge on a new house
Ring shank nails, 2 1/2 inches long and 0.131 inch thick, secure the sheathing on the roof of a new home. Inspectors check the fasteners at the sheathing stage, before any covering goes on.
For shingle or metal roofs, the code gives three dry-in options. One is a full deck of self-adhering membrane. Another is a 3 3/4-inch strip of membrane or tape over every deck joint, with underlayment over the whole roof. The third layer consists of felt-type underlayment laid in two plies, with fasteners spaced 12 inches apart across the field.
At eaves and gables, the drip edge sits on top of the underlayment. Nails go at most 12 inches apart, or 4 inches where design wind speed is 110 mph or more or the roof stands over 33 feet. Tile follows the manufacturer's instructions or the FRSA/TRI Seventh Edition manual, and only over solid sheathing.
Inspections and timing
Fitting the roof schedule around the build and its inspections
Inspections come in this order under the code: foundation, framing, sheathing, exterior wall coverings, roofing, then final. The roofing inspection covers dry-in, insulation, roof coverings and flashing, so the roof crew works between your framing sign-off and the final.
Once a permit is issued, it becomes invalid if work has not begun within 6 months or if work halts for 6 months. A new build with a long gap between slab and roof can run into that limit. Before the first inspection, post your Notice of Commencement after recording it.
Only on its own new building may a builder put on asphalt shingles without a roofing contractor. A certified or registered roofing contractor must handle tile, metal and membrane work. An owner or contractor may also hire a private provider for plans review or inspections, with written authorization from the owner.
Questions
New construction roofing in Glen Ridge: questions
What code edition applies to a new roof in Glen Ridge?
It depends on your filing date. Permits filed now fall under the Eighth Edition, the 2023 Florida Building Code that took effect December 31, 2023. Once the Ninth Edition starts on December 31, 2026, any permit application submitted on or after that day must meet it. Glen Ridge permits go through the Town of Glen Ridge Building Division, so confirm there which edition your plans will be reviewed under, especially near the changeover.
Source: Town of Glen Ridge - Building Division, read Oct 5, 2026
Do I need Miami-Dade product approval for a Glen Ridge roof?
No. Palm Beach County is not in the High Velocity Hurricane Zone, which covers only Broward and Miami-Dade. Roofing in Glen Ridge needs statewide Florida product approval instead. You can search the Florida Building Commission lookup by FL number or manufacturer, and the approval numbers go on your permit paperwork.
Source: Florida Building Commission, 'Setting New Standards for Safety: The Florida Building Code' (2004 publication; wind-speed figures in it are outdated and not used), read Oct 5, 2026
Is there a builder warranty on a newly built Glen Ridge home?
Since July 1, 2025, Florida Statute 553.837 requires a builder to warrant a new home for 1 year against defects in equipment, material or workmanship that cause a material code violation. Exclusions cover natural disasters, settling, defects caused by the owner and ordinary wear and tear. Read your contract and ask the builder how a roof defect claim would be handled.
Source: U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25034, via Census Reporter API, read Oct 5, 2026
Do new Glen Ridge homes need gutters?
Where eaves project less than 6 inches, the code requires gutters with downspouts, though gable end rakes and a roof sitting above another roof are exceptions. Where they are required, the downspout outlet must sit 12 inches or more from the sidewall. Your plans reviewer at the Town of Glen Ridge Building Division will check this against your eave design.
Source: Town of Glen Ridge - Building Division, read Oct 5, 2026
Sources for this page(35)
- 1.Permit office: Town of Glen Ridge - Building Division. Town of Glen Ridge - Building Division. Read Oct 10, 2026.
- 2.Wikipedia, 'Glen Ridge, Florida' (revision 1366084096). Read Oct 5, 2026.
- 3.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25024, via Census Reporter API. Read Oct 5, 2026.
- 4.Housing units (ACS 5-year): 100. U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25001, via Census Reporter API. Read Oct 5, 2026.
- 5.Florida Building Commission, 'Setting New Standards for Safety: The Florida Building Code' (2004 publication; wind-speed figures in it are outdated and not used). Read Oct 5, 2026.
- 6.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25035, via Census Reporter API. Read Oct 5, 2026.
- 7.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25034, via Census Reporter API. Read Oct 5, 2026.
- 8.Hurricane Matthew (2016). NOAA National Hurricane Center, Tropical Cyclone Report: Hurricane Matthew (AL142016). Read Oct 5, 2026.
- 9.Share of homes built 2010 or later: 3%. U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25034, via Census Reporter API. Read Oct 5, 2026.
- 10.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25035, B25034, B25024, via Census Reporter API. Read Oct 5, 2026.
- 11.U.S. Census Bureau, Building Permits Survey county annual files (co2025a.txt, co2020a.txt). Read Oct 5, 2026.
- 12.FRSA, "New 2023 FBC Eighth Edition is Now in Effect", 2024-02-13. Read Oct 5, 2026.
- 13.Miami-Dade County RER notice. Read Oct 5, 2026.
- 14.Florida Statutes, section 553.842 (2026). Read Oct 5, 2026.
- 15.Florida Building Commission. Read Oct 5, 2026.
- 16.2023 Florida Building Code, Residential, 8th ed., Chapter 8 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
- 17.2023 Florida Building Code, Building, 8th ed., Chapter 1 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
- 18.2023 Florida Building Code, Residential, 8th ed., Chapter 9 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
- 19.Florida Statutes, section 489.113 (2026). Read Oct 5, 2026.
- 20.Florida Statutes, section 553.791 (2026). Read Oct 5, 2026.
- 21.FBC-Building 2023 Chapter 2 definitions. Read Oct 5, 2026.
- 22.Florida Statutes, section 553.837 (2026). Read Oct 5, 2026.
- 23.2023 Florida Building Code, Residential, 8th ed., Chapter 3 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
- 24.2023 Florida Building Code, Residential, 8th ed., R318.5 (UpCodes viewer, unofficial transcription); FBC-Building 1503.7. Read Oct 5, 2026.
- 25.Town of Glen Ridge - Building Division, townofglenridgefl.com. Read Oct 5, 2026.
- 26.NOAA National Hurricane Center, Tropical Cyclone Report: Hurricane Matthew (AL142016), NOAA National Hurricane Center. Read Oct 5, 2026.
- 27.Florida Statutes, section 713.135 (2026), Florida Legislature. Read Oct 5, 2026.
- 28.NOAA National Hurricane Center, Tropical Cyclone Report: Hurricane Dorian (AL052019), NOAA National Hurricane Center. Read Oct 5, 2026.
- 29.Florida Statutes, section 627.7011 (2026), Florida Legislature. Read Oct 4, 2026.
- 30.2023 Florida Building Code, Building, 8th ed., Chapter 15 (UpCodes viewer, unofficial transcription), UpCodes (Florida Building Code transcription). Read Oct 5, 2026.
- 31.NOAA National Hurricane Center, Tropical Cyclone Climatology, NOAA National Hurricane Center. Read Oct 5, 2026.
- 32.NOAA National Hurricane Center, Tropical Cyclone Report: Hurricane Irma (AL112017), NOAA National Hurricane Center. Read Oct 5, 2026.
- 33.NOAA NCEI U.S. Climate Normals 1991-2020 (access data service), NOAA National Centers for Environmental Information. Read Oct 5, 2026.
- 34.NOAA NCEI U.S. Climate Normals 1991-2020 (access data service), NOAA National Centers for Environmental Information. Read Oct 5, 2026.
- 35.NOAA Atlas 14 Volume 9 version 2, partial-duration 24-hour depth estimates at the Glen Ridge 2020 Census internal point (26.6723, -80.0756), NOAA Hydrometeorological Design Studies Center. Read Oct 5, 2026.
South Fork Roofing
New construction roofing in Glen Ridge
Answer a few questions about the job, or call.