New construction · Fountainebleau
New construction roofing in Fountainebleau, FL
Only 8.2 percent of Fountainebleau homes were built in 2010 or later, so a new roof here is rare and often a one-off project. Miami-Dade County sits in the High Velocity Hurricane Zone, and the county building office issues your permit.
Updated October 2026

Fountainebleau figures this page uses
- Median year homes were built
- 1984
- Housing units (ACS 5-year)
- 23,219
- Share of homes built 2010 or later
- 8.2%
Local context
How new building fits an older Fountainebleau
Fountainebleau was planned around two golf courses starting in 1970. The eastern half went up mostly as condominiums and apartments, the western half as single-family Village Homes, Garden Homes and townhomes. The median home dates to 1984, close to the county figure of 1980, so most new roofing work here is a rebuild or an infill project, not a subdivision.
Across Miami-Dade, builders pulled permits for 2,666 single-family units in 2025, up from 2,133 in 2020. Fountainebleau holds only a small part of that. If you are building here, expect the same inspectors and the same wind-zone rules as the rest of the county.
What the code requires
Code edition, deck and underlayment rules
Edition matters for timing. Plans submitted on or after December 31, 2026 must meet the Ninth Edition, while the Eighth Edition, in force since the end of 2023, governs earlier filings. A Fountainebleau owner who files late in 2026 should ask the county building office which edition will apply.
Roof sheathing on a new home must be nailed with ring shank nails, 2 1/2 inches long by 0.131 inch, in the standard case. For shingle and metal roofs the code gives three dry-in options, including a self-adhering membrane over the entire deck or two layers of felt-type underlayment fastened 12 inches on center in the field.
At the eaves and the gables, you lay the drip edge over the underlayment when you are installing shingles. Fastening is a maximum of 12 inches on center, tightening to 4 inches where the design wind speed is 110 mph or more or the roof is taller than 33 feet. In the HVHZ, loose-laid roof systems are not permitted, and new low-slope decks need at least a 1/4:12 slope.
Permit and schedule
Product approval, inspections and who installs
Miami-Dade's Product Control Section approves or denies roofing products, and your permit application must carry the Notice of Acceptance numbers. Keep a full copy of each NOA at the job site, because the building official can ask to see it. An NOA is not valid after its expiration date.
Inspections follow the order the code sets out: foundation first, then framing, sheathing, exterior wall coverings, roofing, and finally the final inspection. Roofing covers dry-in, insulation, roof coverings and flashing. Schedule the roof crew after the sheathing inspection passes, and record the Notice of Commencement before the first inspection.
Asphalt shingles can be put on by a builder itself only when the building is new and the builder constructed it. A certified or registered roofing contractor has to handle tile, metal and membrane roofing. Since July 1, 2025, a builder must also warrant a new home for 1 year against code-violating defects in material or workmanship.
Questions
New construction roofing in Fountainebleau: questions
Which office permits a new roof in Fountainebleau?
Miami-Dade County Regulatory and Economic Resources, Building & Permits, issues permits here because Fountainebleau is an unincorporated census-designated place. Your application must list the product approval or Notice of Acceptance numbers for every roofing product. The county is in the High Velocity Hurricane Zone, so the stricter roofing provisions apply. Confirm current filing steps with the building office before you submit.
Source: Miami-Dade County Regulatory and Economic Resources (RER) - Building & Permits, read Oct 5, 2026
What is the 25% roof rule in Florida?
No more than 25 percent of a roof's total area or roof section may be repaired, replaced or recovered in any 12-month period unless the whole roof or section is replaced or recovered. An exception applies when the roof itself was built, repaired or replaced under the 2007 Florida Building Code or later. A new roof in Fountainebleau starts under current code, so the rule matters mainly for later repairs.
Source: 2023 Florida Building Code, Building, 8th ed., Chapter 15 (UpCodes viewer, unofficial transcription), read Oct 5, 2026
Does a new Fountainebleau home need gutters?
Where eaves project less than 6 inches, you need gutters with downspouts, though gable end rakes and a roof sitting above another roof are exempt. Each downspout has to empty at least 1 foot away from the building's sidewall. With 23,219 housing units in Fountainebleau, many are townhomes and condominiums, so check the eave projection on your plans.
Source: 2023 Florida Building Code, Residential, 8th ed., Chapter 3 (UpCodes viewer, unofficial transcription), read Oct 5, 2026
Can I use a private inspector on a new roof in Miami-Dade?
Yes. The fee owner, or the owner's contractor with written authorization, may choose a private provider for plans review or code inspections at any time. To act as a private provider, a person must be a licensed building code administrator, engineer or architect. In this area the median home was built in 1984, so many roofs are being replaced on older houses where a private provider can help keep inspections moving. Ask the Miami-Dade building office how a private provider's reports are filed for your permit.
Source: Florida Statutes, section 553.791 (2026), read Oct 5, 2026
Sources for this page(34)
- 1.Wikipedia, 'Fontainebleau, Florida' (revision 1374413376). Read Oct 5, 2026.
- 2.Median year homes were built: 1984. U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25035, via Census Reporter API. Read Oct 5, 2026.
- 3.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25035, via Census Reporter API. Read Oct 5, 2026.
- 4.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25035, B25034, B25024, via Census Reporter API. Read Oct 5, 2026.
- 5.U.S. Census Bureau, Building Permits Survey county annual files (co2025a.txt, co2020a.txt). Read Oct 5, 2026.
- 6.Housing units (ACS 5-year): 23,219. U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25001, via Census Reporter API. Read Oct 5, 2026.
- 7.Permit office: Miami-Dade County Regulatory and Economic Resources (RER) - Building & Permits. Miami-Dade County Regulatory and Economic Resources (RER) - Building & Permits. Read Oct 10, 2026.
- 8.Florida Building Commission, 'Setting New Standards for Safety: The Florida Building Code' (2004 publication; wind-speed figures in it are outdated and not used). Read Oct 5, 2026.
- 9.Miami-Dade County RER, Board and Code Administration Division, Product Approval. Read Oct 5, 2026.
- 10.Share of homes built 2010 or later: 8.2%. U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25034, via Census Reporter API. Read Oct 5, 2026.
- 11.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25024, via Census Reporter API. Read Oct 5, 2026.
- 12.FRSA, "New 2023 FBC Eighth Edition is Now in Effect", 2024-02-13. Read Oct 5, 2026.
- 13.Miami-Dade County RER notice. Read Oct 5, 2026.
- 14.2023 Florida Building Code, Residential, 8th ed., Chapter 8 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
- 15.2023 Florida Building Code, Residential, 8th ed., Chapter 9 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
- 16.2023 Florida Building Code, Building, 8th ed., Chapter 15 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
- 17.Florida Statutes, section 553.842 (2026). Read Oct 5, 2026.
- 18.miamidade.gov. Read Oct 5, 2026.
- 19.2023 Florida Building Code, Building, 8th ed., Chapter 1 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
- 20.Florida Statutes, section 489.113 (2026). Read Oct 5, 2026.
- 21.Florida Statutes, section 553.837 (2026). Read Oct 5, 2026.
- 22.2023 Florida Building Code, Residential, 8th ed., Chapter 3 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
- 23.Florida Statutes, section 553.791 (2026). Read Oct 5, 2026.
- 24.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25001, via Census Reporter API, U.S. Census Bureau (via Census Reporter). Read Oct 5, 2026.
- 25.Miami-Dade County Regulatory and Economic Resources (RER) - Building & Permits, Miami. Read Oct 5, 2026.
- 26.Florida Statutes, section 713.135 (2026), Florida Legislature. Read Oct 5, 2026.
- 27.Citizens Property Insurance Corporation, inspections FAQ (updated 2026-03-17), Citizens Property Insurance. Read Oct 4, 2026.
- 28.NOAA NCEI U.S. Climate Normals 1991-2020 (access data service), NOAA National Centers for Environmental Information. Read Oct 5, 2026.
- 29.NOAA NCEI U.S. Climate Normals 1991-2020 (access data service), NOAA National Centers for Environmental Information. Read Oct 5, 2026.
- 30.NOAA National Hurricane Center, Tropical Cyclone Climatology, NOAA National Hurricane Center. Read Oct 5, 2026.
- 31.NOAA Atlas 14 Volume 9 version 2, partial-duration intensity estimates at the Fountainebleau 2020 Census internal point (25.7721, -80.3446), NOAA Hydrometeorological Design Studies Center. Read Oct 5, 2026.
- 32.NOAA Atlas 14 Volume 9 version 2, partial-duration 24-hour depth estimates at the Fountainebleau 2020 Census internal point (25.7721, -80.3446), NOAA Hydrometeorological Design Studies Center. Read Oct 5, 2026.
- 33.NOAA National Hurricane Center, Tropical Cyclone Report: Hurricane Irma (AL112017), NOAA National Hurricane Center. Read Oct 5, 2026.
- 34.NOAA National Hurricane Center, Tropical Cyclone Report: Hurricane Dorian (AL052019), NOAA National Hurricane Center. Read Oct 5, 2026.
South Fork Roofing
New construction roofing in Fountainebleau
Answer a few questions about the job, or call.