New construction · North Bay Village
New construction roofing in North Bay Village, FL
Only 9.8 percent of North Bay Village homes were built in 2010 or later, so a new roof here is uncommon and the rules are easy to miss. New permits face the Miami-Dade High-Velocity Hurricane Zone. Product approval, deck work and inspections all come before the final.
Updated October 2026

Our workCode edition
Which code edition a new permit faces
Strong provisions were adopted across South Florida once Hurricane Andrew had passed, and Miami-Dade is one of two counties in the High-Velocity Hurricane Zone that carries them. That applies to every new roof on the three islands. Since December 31, 2023, the Eighth Edition of the Florida Building Code has been the one in effect.
The Ninth Edition starts December 31, 2026, and it governs any application submitted on or after that date. If your plans are close to that line, the filing date decides which edition your roof must meet. Ask the North Bay Village Building Department how it handles plans filed just before the change.
Roof build
Deck, underlayment and product approval
Roof sheathing on a new home must be nailed with ring shank nails, 2 1/2 inches long, in the sizes the residential code lists. For shingle, metal and similar roofs, you then choose from three dry-in methods. A self-adhering membrane laid across the entire deck is one option. Another is two layers of felt underlayment with cap nails fastened 12 inches apart in the field.
Roofing is a mandatory statewide-approval category, and Miami-Dade's Product Control Section reviews roofing products and certifies the labs that test them. On the permit application, you list the product approval or Notice of Acceptance numbers. A copy of the entire Notice of Acceptance must be on the job site when the building official asks.
Many buildings in the village are large multi-family structures. Flat roofs there follow the HVHZ low-slope rules: no loose laid ballasted systems, and new construction decks need at least a 1/4:12 slope. If your eaves project less than 6 inches, the code calls for gutters with downspouts.
Build schedule
Scheduling the roof and inspections
The code sets the inspection sequence as foundation first, then framing, sheathing, exterior wall coverings, roofing, and the final inspection last. The sheathing inspection covers roof sheathing, fasteners and the dry-in. Dry-in, insulation, roof coverings and flashing are what the inspector checks when the roofing inspection arrives. Book the roofer after sheathing passes, so the dry-in is not left open.
On an island lot with a new house, the builder may lay asphalt shingles only on that building of its own construction. Any tile, metal or membrane work needs a roofing contractor with state certification or registration. The Notice of Commencement has to be recorded and posted ahead of the first inspection. For a roof permit in this area, you apply through the City of North Bay Village Building Department.
Questions
New construction roofing in North Bay Village: questions
Does a new roof in North Bay Village need a Miami-Dade Notice of Acceptance?
Yes, the roofing products must carry approval. Miami-Dade is in the High-Velocity Hurricane Zone, and the Miami-Dade Product Control Section approves or denies roofing products. The permit application lists the approval or Notice of Acceptance numbers. In North Bay Village the median home was built in 1985, so many roofs here are replacements on older buildings, and each one still needs approved products. The notice expires on its stated date, so check that it is still valid. A full copy must be on the job site for the building official. Your roofer should hand you the numbers before the permit is filed.
Source: Florida Building Commission, 'Setting New Standards for Safety: The Florida Building Code' (2004 publication; wind-speed figures in it are outdated and not used), read Oct 5, 2026
Which code edition applies to my new roof plans?
It depends on the filing date. December 31, 2023 is the date the Eighth Edition began to apply. The Ninth Edition governs any permit application and plans that are submitted on or after December 31, 2026. In North Bay Village, the Building Department takes the permit application, so confirm with them which edition your submission falls under.
Source: FRSA, "New 2023 FBC Eighth Edition is Now in Effect", 2024-02-13, read Oct 5, 2026
Can my general contractor install the shingles on a new house?
Only in one case. Florida law lets a general contractor install asphalt or fiberglass shingles itself on a new building of its own construction. Other roof types must go to a roofing contractor with state certification or registration. Before you sign, ask who will hold the roofing permit with the North Bay Village Building Department.
Source: Florida Statutes, section 489.113 (2026), read Oct 5, 2026
What does the builder owe me on a new home's roof?
Since July 1, 2025, Fla. Stat. 553.837 requires a builder to warrant a newly constructed home for 1 year against defects in equipment, material or workmanship that violate the Florida Building Code. The year runs from title transfer or initial occupancy, whichever comes first. The rule leaves out wear, settling and owner-caused damage, and it also leaves out a natural disaster. Read your purchase contract and ask the builder in writing how a roof leak is reported.
Source: Florida Statutes, section 553.837 (2026), read Oct 5, 2026
Sources for this page(32)
- 1.Florida Building Commission, 'Setting New Standards for Safety: The Florida Building Code' (2004 publication; wind-speed figures in it are outdated and not used). Read Oct 5, 2026.
- 2.Permit office: City of North Bay Village - Building Department. City of North Bay Village - Building Department. Read Oct 10, 2026.
- 3.Miami-Dade County RER, Board and Code Administration Division, Product Approval. Read Oct 5, 2026.
- 4.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25024, via Census Reporter API. Read Oct 5, 2026.
- 5.Share of homes built 2010 or later: 9.8%. U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25034, via Census Reporter API. Read Oct 5, 2026.
- 6.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25035, B25034, B25024, via Census Reporter API. Read Oct 5, 2026.
- 7.U.S. Census Bureau, Building Permits Survey county annual files (co2025a.txt, co2020a.txt). Read Oct 5, 2026.
- 8.Median year homes were built: 1985. U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25035, via Census Reporter API. Read Oct 5, 2026.
- 9.FBC-Building 2023 Chapter 2 definitions. Read Oct 5, 2026.
- 10.FRSA, "New 2023 FBC Eighth Edition is Now in Effect", 2024-02-13. Read Oct 5, 2026.
- 11.Miami-Dade County RER notice. Read Oct 5, 2026.
- 12.2023 Florida Building Code, Residential, 8th ed., Chapter 8 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
- 13.2023 Florida Building Code, Residential, 8th ed., Chapter 9 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
- 14.Florida Statutes, section 553.842 (2026). Read Oct 5, 2026.
- 15.miamidade.gov. Read Oct 5, 2026.
- 16.2023 Florida Building Code, Building, 8th ed., Chapter 15 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
- 17.2023 Florida Building Code, Residential, 8th ed., Chapter 3 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
- 18.2023 Florida Building Code, Building, 8th ed., Chapter 1 (UpCodes viewer, unofficial transcription). Read Oct 5, 2026.
- 19.Florida Statutes, section 489.113 (2026). Read Oct 5, 2026.
- 20.Florida Statutes, section 553.837 (2026). Read Oct 5, 2026.
- 21.City of North Bay Village - Building Department, City of North Bay Village. Read Oct 5, 2026.
- 22.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25034, via Census Reporter API, U.S. Census Bureau (via Census Reporter). Read Oct 5, 2026.
- 23.Florida Statutes, section 713.135 (2026), Florida Legislature. Read Oct 5, 2026.
- 24.Florida Statutes, section 627.7011 (2026), Florida Legislature. Read Oct 4, 2026.
- 25.Official website: North Bay Village, 50% permit discount announcement, Official website. Read Oct 5, 2026.
- 26.U.S. Census Bureau, 2020 Census counts (POP100, HU100) via TIGERweb tigerWMS_Census2020 (AREALAND/AREAWATER), U.S. Census Bureau. Read Oct 5, 2026.
- 27.NOAA National Hurricane Center, Tropical Cyclone Report: Hurricane Irma (AL112017), NOAA National Hurricane Center. Read Oct 5, 2026.
- 28.NOAA National Hurricane Center, Tropical Cyclone Climatology, NOAA National Hurricane Center. Read Oct 5, 2026.
- 29.Wikipedia, 'North Bay Village, Florida' (revision 1373591093), Wikipedia. Read Oct 5, 2026.
- 30.NOAA NCEI U.S. Climate Normals 1991-2020 (access data service), NOAA National Centers for Environmental Information. Read Oct 5, 2026.
- 31.NOAA NCEI U.S. Climate Normals 1991-2020 (access data service), NOAA National Centers for Environmental Information. Read Oct 5, 2026.
- 32.NOAA Atlas 14 Volume 9 version 2, partial-duration 24-hour depth estimates at the North Bay Village 2020 Census internal point (25.8491, -80.1510), NOAA Hydrometeorological Design Studies Center. Read Oct 5, 2026.