Skip to content

Miami-Dade County ยท Census-designated place

Roofing in Naranja, Florida

The median home in Naranja was built in 2007, while the median for Miami-Dade County is 1980. That makes Naranja one of the newer parts of the county, so many roofs here are younger than the county average. Roof age still decides what your insurer will ask of you.

Updated October 2026

Front of a single-story brick home with a dark shingle hip roof, a white garage door, two small palms in the front bed and a blue sky with a streak of sun glare.

At a glance

Naranja homes at a glance

People (2020 Census)
13,509
Median year homes were built
2007
Share of homes built before 1980
10.9%
Share of homes built 2010 or later
41.9%
Owner-occupied share of occupied homes
24.5%

Census figures; each one is listed in the sources at the end of this page.

Housing age

How old are roofs in Naranja

About 42 percent of Naranja's housing units were built in 2010 or later, compared with about 11 percent countywide. That is roughly four times the county share. Many roofs here are likely still young enough to have decades of useful life ahead.

Only 10.9 percent of homes here were built before 1980. Those older roofs are the ones most likely to hit insurance age limits, so find the install date of your own roof before you assume anything.

Citizens Property Insurance sets age thresholds of 25 years for shingle roofs and 50 years for tile, slate, clay, concrete or metal. Past those ages, it wants papers showing at least five years of life left. Check with your insurance company or agent to learn which rule governs your policy.

Permits and review

Who permits roof work in Naranja

No city hall sits behind Naranja. As an unincorporated census-designated place, it takes its roof permits from the county's Building & Permits office under Regulatory and Economic Resources. Confirm current steps there before work starts.

Under the Florida Building Code, Miami-Dade sits alongside one other county inside the High Velocity Hurricane Zone. Roofing products here are typically shown with a Miami-Dade Notice of Acceptance, and the building official can ask to see a copy at the job site.

Building permits

Miami-Dade County Regulatory and Economic Resources (RER) - Building & Permits

Official building page

Office names and links only. Fees, forms and timing change; check the official page.

Weather risk

Rain and storms in Naranja

Naranja's 24-hour rainfall in a 100-year storm is 14.1 inches, against 7.95 inches in a 10-year storm. A 10-year downpour can hit 10.6 inches an hour for five minutes. Flashing, valleys and gutters take that load first.

Measured at Miami International Airport, roughly three-quarters of a typical year's rainfall (76.6 percent) arrives between May and October. Hurricane Dorian in 2019 brought a hurricane warning to Miami-Dade but stayed offshore. Get roof checks done before the wet season starts.

Local record

On record for Naranja

  • 43.6% of housing units are in buildings with 10 or more units.

Questions

Naranja roofing questions

Is my roof in Naranja too old to insure?

Insurers look at roof age and remaining useful life. Citizens Property Insurance requires documentation of at least five years of remaining useful life for roofs older than 25 years if they are shingle, or 50 years if they are tile, slate, clay, concrete or metal. The median home in Naranja was built in 2007, so your roof may be younger than that. Check your own roof's install date and confirm the rule with your insurer or agent.

Source: Citizens Property Insurance Corporation, inspections FAQ (updated 2026-03-17), read Oct 4, 2026

Related: Roof inspections

Who issues a roof permit in Naranja?

Miami-Dade County Regulatory and Economic Resources issues roof permits, because Naranja is unincorporated and has no city building department. Confirm current requirements and fees with the county before work starts.

Source: Miami-Dade County Regulatory and Economic Resources (RER) - Building & Permits, read Oct 5, 2026

Related: Roof replacement

How hard can it rain on a Naranja roof?

A 10-year storm drops 7.95 inches in 24 hours here, and a 100-year storm drops 14.1 inches. Short bursts are intense: 10.6 inches an hour for five minutes in a 10-year storm. Water that heavy finds any weak flashing or clogged gutter, so check them before the rainy season.

Source: NOAA Atlas 14 Volume 9 version 2, partial-duration 24-hour depth estimates at the Naranja 2020 Census internal point (25.5161, -80.4219), read Oct 5, 2026

Related: Roof repair

How long is a roof permit good for in Naranja?

Under Florida Building Code section 105.4.1, a roof permit becomes invalid if work does not begin within 6 months of issuance, or if work is suspended or abandoned for 6 months. Passing an approved inspection within 180 days is treated as evidence that work is still moving forward. Naranja permits come from the county's Building & Permits office, so confirm the dates with them. Many homes in the area date to around 2007, so older roofs are common here and are often replaced on a permit like this one.

Source: 2023 Florida Building Code, Building, 8th ed., Chapter 1 (UpCodes viewer, unofficial transcription), read Oct 5, 2026

Related: Roof replacement

Nearby

Near Naranja

Sources for this page(21)
  1. 1.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25034, via Census Reporter API. Read Oct 5, 2026.
  2. 2.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25035, B25034, B25024, via Census Reporter API. Read Oct 5, 2026.
  3. 3.Share of homes built before 1980: 10.9%. U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25034, via Census Reporter API. Read Oct 5, 2026.
  4. 4.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25035, via Census Reporter API. Read Oct 5, 2026.
  5. 5.Permit office: Miami-Dade County Regulatory and Economic Resources (RER) - Building & Permits. Miami-Dade County Regulatory and Economic Resources (RER) - Building & Permits. Read Oct 10, 2026.
  6. 6.Florida Building Commission, 'Setting New Standards for Safety: The Florida Building Code' (2004 publication; wind-speed figures in it are outdated and not used). Read Oct 5, 2026.
  7. 7.NOAA NCEI U.S. Climate Normals 1991-2020 (access data service). Read Oct 5, 2026.
  8. 8.Hurricane Dorian (2019). NOAA National Hurricane Center, Tropical Cyclone Report: Hurricane Dorian (AL052019). Read Oct 5, 2026.
  9. 9.Median year homes were built: 2007. U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25035, via Census Reporter API. Read Oct 5, 2026.
  10. 10.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25003, via Census Reporter API. Read Oct 5, 2026.
  11. 11.U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25024, via Census Reporter API. Read Oct 5, 2026.
  12. 12.People (2020 Census): 13,509. U.S. Census Bureau, 2020 Census counts (POP100, HU100) via TIGERweb tigerWMS_Census2020 layer 28 (Census Designated Places). Read Oct 5, 2026.
  13. 13.Share of homes built 2010 or later: 41.9%. U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25034, via Census Reporter API. Read Oct 5, 2026.
  14. 14.Owner-occupied share of occupied homes: 24.5% (1,254 of 5,122). U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020-2024), table B25003, via Census Reporter API. Read Oct 5, 2026.
  15. 15.Citizens Property Insurance Corporation, inspections FAQ (updated 2026-03-17), Citizens Property Insurance. Read Oct 4, 2026.
  16. 16.Miami-Dade County Regulatory and Economic Resources (RER) - Building & Permits, Miami. Read Oct 5, 2026.
  17. 17.miamidade.gov, miamidade.gov. Read Oct 5, 2026.
  18. 18.2023 Florida Building Code, Building, 8th ed., Chapter 1 (UpCodes viewer, unofficial transcription), UpCodes (Florida Building Code transcription). Read Oct 5, 2026.
  19. 19.NOAA Atlas 14 Volume 9 version 2, partial-duration intensity estimates at the Naranja 2020 Census internal point (25.5161, -80.4219), NOAA Hydrometeorological Design Studies Center. Read Oct 5, 2026.
  20. 20.NOAA Atlas 14 Volume 9 version 2, partial-duration 24-hour depth estimates at the Naranja 2020 Census internal point (25.5161, -80.4219), NOAA Hydrometeorological Design Studies Center. Read Oct 5, 2026.
  21. 21.NOAA National Hurricane Center, Tropical Cyclone Report: Hurricane Dorian (AL052019), NOAA National Hurricane Center. Read Oct 5, 2026.

South Fork Roofing

Roofing in Naranja: tell us about yours.

Answer a few questions about your roof, or call.

CallGet a quote